Fuel Tank and Dispensing Infrastructure Replacement
Project Information
- Bid Title
- Fuel Tank and Dispensing Infrastructure Replacement
- Issuing Agency
- Ohio Facility Construction Commission
- Location
- Ohio
- Published Date
- Jan 8, 2026
- Closing Date
- Jan 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- OSU-260081 (REVISED)
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes 12/17/2025 1/15/2026 OSU-260081 (REVISED) The Ohio State University Local Higher Education Fuel Tank and Dispensing Infrastructure Replacement A/E $2,000,000 N/A TBD - Attachment Preview
-
Request for Qualifications (Registered Design Professional*)State of Ohio Standard Forms and DocumentsAdministration of Project: Local Higher EducationFuel Tank and Dispensing InfrastructureProject Name ReplacementProject LocationCity / County Columbus / FranklinOwnerThe Ohio State UniversityDelivery Method General ContractingNo. of paper copies requested (stapled, not bound)0Response Deadline 01/15/20262:00 PM local timeProject NumberOSU-260081Project ManagerDan SayerContracting Authority Local Higher EducationPrevailing Wages StateNo. of electronic copies requested (PDF)1* “Registered Design Professional includes any architect holding a certificate issued under section 4703.10 of the RevisedCode, any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineerholding a certificate issued under section 4733.14 of the Revised Code.” (Ohio Building Code section 4101:1-2-01 Definitions)Submit the Statements of Qualifications (Form F110-330) via email to 330Submittals@osu.edu. In the subject line, include theproject number and name for RFQ you are responding to. See Section J of this RFQ for additional submittal instructions.Submit all questions regarding this RFQ in writing to Dan Sayer at sayer.38@osu.edu with the project number included in thesubject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC websiteat https://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the party submitting aquestion will not be included on the Q&A document.Project OverviewA. Project DescriptionOhio State’s Transportation and Traffic Management division has three 10,000-gallon underground fuel tanks (one dieseland two gasoline) at the refueling facility. All three of these tanks have reached end of life and need to be replaced. Otherassociated equipment will need to be replaced including underground pumps, waste oil tank, fuel dispensers & controllers,and tank monitoring system.This project will not seek LEED certification. There are no BIM requirements on this project. LEED and BIM scores willbe zeros on the A/E selection rating form.This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable ofmeeting this prerequisite and is responsible to support their consultants to meet this requirement. The Asset TaggingProcess Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website(https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards;Building Information Modeling (BIM).B. Scope of ServicesThe project and construction budget as listed in this RFQ is estimated.For projects advertised with an appropriately developed Program of Requirements (POR), upon award of the Agreement,commence with Design. For projects without such a POR, upon award of the Agreement, commence by developing theProgram of Requirements.The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf.The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss andclarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailedcost components to address the Owner’s project requirements. Participate in the Encouraging Growth, Diversity & Equity(EDGE) Program as required by statute and the Agreement. Required Professional Liability Insurance will be per Exhibit A– A/E Terms and Conditions Article 7.2.6.As required by the Agreement, and as properly authorized, provide the following categories of services: ProgramVerification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support,Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.F110-02-2024-OCTPublish Date: [leave blank]Page 1 of 5Request for Qualifications (Registered Design Professional) continuedRefer to the Ohio Facilities Construction Manual for additional information about the type and extent of services requiredfor each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.The selected A/E will be required to sign the standard agreement. No modifications to the requirements in the agreementwill be accepted.During the construction period, provide not less than 8 hours (excluding travel time) on-site construction administrationservices each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-siterepresentation comprised of the A/E and its consultant staff involved in the primary design of the project, all havingrelevant and appropriate types of construction administration experience.The project team (Owner / A/E / Contractor) will be required to utilize the University’s Project Management System, for allcompatible services required by the University.The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors,and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects withinOhio State buildings are set forth in the Building Design Standards Appendix V and are summarized here:https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.”Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using thee-Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The OhioState University Project Closeout Standards can be accessed via the OSU FOD vender resource website(https://fod.osu.edu/resources) under Post Construction / Close Out.For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (FormF110-330), below is a list of relevant scope of work requirements for this RFQ:1. Experience with underground storage tank design & installation2. Compliance with fuel center environmental regulations and permitting3. Lead construction administration services for OSU administered projects4. Cost estimating – Final costs within 5% of estimateFor the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330),projects must be designed by the Lead Firm.C. Estimated Budget / FundingState Funding:n/aOther Funding:n/aConstruction Cost: $1,500,000Total Project Cost: $2,000,000D. Anticipated ScheduleProfessional Services Start:Construction Notice to Proceed:Substantial Completion of all Work:Professional Services Completed:01 / 2606 / 2610 / 2611 / 26E. Estimated Basic Fee Range (see note below)F. EDGE Participation Goal8% to 8.5%Percent of initial Total A/E Fee:5%NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. TheBasic Fee includes all professional design services and consultant services necessary for proper completion of the Basic Services, includingvalidation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for theproject. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above. The BasicFee excludes any Additional Services required for the project.G. Basic Service Providers Required (see note below)Lead A/E Discipline: Civil EngineeringSecondaryEnvironmental EngineeringDisciplines:MEP EngineeringH. Additional Service Providers RequiredHazardous Materials AssessmentGeotechnical ServicesSurveyingF110-02-2024-NOVPublish Date: [leave blank]Page 2 of 5Request for Qualifications (Registered Design Professional) continuedNOTE: The lead A/E shall be (1) any architect holding a certificate issued under section 4703.10 of the Revised Code, (2) any landscapearchitect holding a certificate issued under section 4703.36 of the Revised Code, or (3) any engineer holding a certificate issued under section4733.14 of the Revised Code.I. Evaluation Criteria for Selection• Demonstrated ability to meet Owner’s programmed project vision, scope, budget, and schedule on previousprojects.• Demonstrated ability to meet Owner’s Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf.• Previous experience compatible with the proposed project (e.g., type, size).• Relevant past work of prospective firm’s proposed consultants.• Past performance of prospective firm and its proposed consultants.• Qualifications and experience of individuals directly involved with the project.• Proposer’s previous experience (numbers of projects, sizes of projects) when working with its proposedconsultants.• Design quality and demonstrated ability of prospective firm and its proposed consultants to provide designservices which represent the University’s Design Guidelines for Buildings and Landscape buildings-landscape.pdf• Specification writing credentials and experience.• Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPMschedules as a project management resource.• Approach to and success of using partnering and Alternative Dispute Resolution.• Proximity of prospective firms to the project site.• Proposer’s apparent resources and capacity to meet the needs of this project.• The selected A/E and all its consultants must have the capability to use the Internet within their normal businesslocation(s) during normal business hours.Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Programform in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contractwith and use EDGE-certified Business Enterprise(s), as a part of the A/E’s team. The Intent to Contract and to Performand / or waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must beattached to the A/E’s Technical Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. TheIntent to Contract and to Perform form is again required at the Fee Proposal stage.If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH acompleted Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform formssigned by both parties with its Statement of Qualifications.For all Statements of Qualifications, please identify the EDGE-certified Business Enterprises, by name, which willparticipate in the delivery of the proposed professional services solicited in the RFQ.Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will beperformed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12Drelated to providing services only within the United States and the requirements of Executive Order 2022-02D prohibitingpurchases from or investment in any Russian institution or company. Failure to do so may cause their Statement ofQualifications to be rejected.J. Submittal InstructionsFirms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCCwebsite at https://ofcc.ohio.gov.Electronic submittals should be combined into one PDF file saved with the form name, project number listed on the RFQand your firm’s name (ex. F110-330_OSU-nnnnnn_Firm Name). Use the “print” feature of Adobe Acrobat or similarsoftware for creating a PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, goto Advanced, then PDF Optimizer.Statements of Qualifications must be submitted electronically by email. Submittals are limited to one email with amaximum file size of 25 MB.Firms are requested to identify professional registrations, memberships, and credentials including: LEED GA, LEED AP,LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.F110-02-2024-NOVPublish Date: [leave blank]Page 3 of 5Architect / Engineer Selection Rating FormState of Ohio Standard Forms and DocumentsFuel Tank and Dispensing InfrastructureProject Name ReplacementProject Number OSU-260081Proposer FirmCity, State, ZipSelection Criteria1. Primary Firm Location, Workload and Size (Maximum 10 points)a. Proximity of firm to project siteb. Amount of fees awarded by Contracting Authority inprevious 24 monthsc. Number of licensed professionalsLess than 150 miles150 miles to 200 milesMore than 200 milesLess than $200,000$200,000 to $1,000,000More than $1,000,000Less than 2 professionals2 to 10 professionalsMore than 10 professionals2. Primary Firm Qualifications (Maximum 30 points)a. Project management leadb. Project design leadc. Technical staffd. Construction administration staffExperience / ability of project manager tomanage scope / budget / schedule / qualityExperience / creativity of project designer toachieve owner’s vision and requirementsExperience / ability of technical staff to createfully coordinated construction documentsExperience / ability of field representative toidentify and solve issues during construction3. Key Consultant Qualifications (Maximum 20 points)a. Key discipline leadsb. Proposed EDGE-certified Consultant participation*Experience / ability of key consultants toperform effectively and collaborativelyOne point for every 2 percent increase inprofessional services over the EDGEparticipation goal4. Overall Team Qualifications (Maximum 10 points)a. Previous team collaborationb. OSU Sustainability Standards or LEED** projectexperiencec. BIM project experienced. Team organizationLess than 2 sample projects2 to 4 sample projectsMore than 4 sample projectsLEED v4.0 or v4.1 projectsOSU Sustainability Standards projectsTraining and knowledgeDirect project experienceClarity of responsibility / communicationdemonstrated by table of organization5. Overall Team Experience (Maximum 30 points)a. Previous team performanceb. Experience with similar projects / delivery methodsc. Budget and schedule managementd. Knowledge of Ohio Capital Improvements processPast performance as indicated byevaluations and letters of referenceLess than 3 projects3 to 6 projectsMore than 6 projectsPerformance in completing projects withinoriginal construction budget and scheduleLess than 3 projects3 to 6 projectsMore than 6 projectsValue520210123Max=30 - 100 -50-50 - 10Max= 200 - 150-5135Max=50Max2=20Max0=00-30 - 100-34-67 - 100-50-12-34-5Score* Must be comprised of professional design services consulting firm(s) and NOT the lead firm – For moreinformation on scoring this and other criteria refer to Document F199-01 – PS Selection Rating Rubric.** Leadership in Energy & Environmental Design administered by Green Building Certification Inc.Notes:Evaluator:NameSubtotalF110-02-2024-OCTSignatureDatePublish Date: [leave blank]Page 4 of 5Request for Qualifications (Registered Design Professional) continuedF110-02-2024-NOVPublish Date: [leave blank]Page 5 of 5
- Commodity Codes
-
- NAICS 237120Oil and Gas Pipeline and Related Structures Construction
- NAICS 332420Metal Tank (Heavy Gauge) Manufacturing
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
MH-139 Lithium-Ion Battery Re...
Follow MH-139 Lithium-Ion Battery Replacement Active Contract Opportunity Notice ID MH139-CR04 Related Notice
DEPT OF DEFENSE
Bid Due: 7/10/2026
Follow MH-139 Color Weather Radar Active Contract Opportunity Notice ID MH139-CR03 Related Notice
DEPT OF DEFENSE
Bid Due: 7/24/2026