Crestwood Detention Basin Construction
Project Information
- Bid Title
- Crestwood Detention Basin Construction
- Issuing Agency
- Mohave County
- Location
- Arizona
- Published Date
- Feb 4, 2026
- Closing Date
- Mar 5, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 2026-035-IFB
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID: 2026-035-IFB
Title: Crestwood Detention Basin Construction
Addenda: 0
Release Date: 2/4/2026
Due Date: 3/5/2026
Crestwood Detention Basin ConstructionFollowInvitation For BidFlood Control District91200 , 91300 , 96800Project ID: 2026-035-IFBRelease Date: Wednesday, February 4, 2026· Due Date: Thursday, March 5, 2026 2:00pmPosted Wednesday, February 4, 2026 1:10pmAll dates & times in Mountain Time - ArizonaDraft Response Events RSVP No Bid28 days, 20 hours, 3 minutesOverview
Post Information
Posted At:Wed, Feb 4, 2026 1:10 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryThe County of Mohave, on behalf of the Flood Control District , is seeking bids from qualified respondents for a construction project titled: Crestwood Detention Basin Construction . All bids are due before 2:00 pm on Thursday, March 5, 2026 .
This project consists of construction of 1 detention basin on Flood Control District land west of the City of Kingman near Hafley Drive. The work site is located in a portion of Section 2 of Township 21 North, Range 17 West. The basin is designed to be formed by excavation and embankment with rock lining on the downstream face, a rock primary outlet spillway and an outlet pipe placed below the spillway crest.
The construction cost range of this Project is expected to be between One Million Dollars ($1,000,000 and Two Million Dollars ($2,000,000).
BackgroundIn February 2023, the Mohave County Board of Supervisors approved 9 locations in the Hualapai Valley Basin for possible groundwater recharge. The Flood Control District applied to WIFA’s Water Conservation Grant Funds (WCGF) program for funding to design and construct detention basins at these locations. The District was awarded American Rescue Plan Act (ARPA) funding which has been used to acquire land and design detention basins at some of these locations.
The Riata Detention Basin and Crestwood Detention Basin were designed simultaneously and share a Design Report. These basins are located on Arizona State Land and the District has nearly completed the acquisition of these locations.
The Crestwood Detention Basin will provide flood control benefits to residents and structures immediately downstream. Impounded storm runoff may also contribute to the aquifer by infiltration into the ground for a short period of time after a storm.
Funds for the basin construction come from grants, supplemented by budgeted money from the Mohave County Flood Control District.
Timeline
Bid Issue Date:February 4, 2026Pre-Bid Conference (Non-Mandatory):February 12, 2026, 9:00amPre-Bid Conference will be in-person at the Mohave County Development Services Boriana Conference Room, 3250 Kino Avenue, Kingman, AZ.
Site Walk to follow: Directional maps will be available at the Pre-Bid Conference.Question Submission Deadline:February 18, 2026, 5:00pmBid Due Date:March 5, 2026, 2:00pm - Commodity Codes
-
- NAICS 237990Other Heavy and Civil Engineering Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Pioneer Parkway Rubberized Ch...
Pioneer Parkway Rubberized Chip Seal in Yavapai County, AZ - Project #1619226 See
Yavapai County
Bid Due: 7/20/2030