Ductless Air Conditioning Units
Project Information
- Bid Title
- Ductless Air Conditioning Units
- Issuing Agency
- Town of Westerly
- Location
- Rhode Island
- Published Date
- Apr 14, 2026
- Closing Date
- May 5, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 27-11
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 27-11
Bid Title: Ductless Air Conditioning Units
Category: Special Industries Equipment, Supplies and Accessories Status: Open Publication Date/Time: 4/14/2026 9:00 AM Closing Date/Time: 5/5/2026 2:00 PM Related Documents: - Attachment Preview
-
TOWN OF WESTERLY / WESTERLY PUBLIC SCHOOLSREQUEST FOR QUOTATIONRFQ Description: Ductless Air Conditioning UnitsRFQ Number: 27-11April 14, 2026The Town of Westerly/Westerly Public Schools, Westerly, RI, acting through itsPurchasing Agent, is hereby soliciting sealed bids for the above referenced RFQ and youare hereby invited to submit a lump sum for the Scope of Work described in this Requestfor Quotation, in strict accordance with the Bid Documents.TERMS AND CONDITIONSBids shall be based on the Terms and Conditions as referenced in this Request forQuotation.BID DUE DATE/SUBMITTING INSTRUCTIONSBIDS ARE DUE and MUST BE SUBMITTED on the attached BID FORM, Attachments B, NO LATERTHAN 2:00 p.m., EST, May 5, 2026. A Bid submitted on other than the attached BID BREAKDOWNFORM may be rejected. Envelopes containing bids must be sealed and addressed to theundersigned, at the Purchasing Department, Town of Westerly, 45 Broad Street, Westerly, RI02891 and must be clearly marked with the Name and Address of Bidder, Bid Due Date and Time,and RFQ Number and Title. Bidders must include the original plus and a Public copy on a flashdrive as defined in the Instruction to Bidders.Pre-bid Site WalkA Mandatory pre-bid walkthrough is scheduled for April 21, 2026 at 8:30 AM will beginat Springbrook Elementary School, 39 Springbrook Road., Westerly, RI 02891.Schedule1. Issue Request for Proposal2. Prebid meeting3. Questions Due By4. RFI Response5. Proposal Submission6. Vendor Award7. Project Start8. Substantial Completion4/14/264/21/26 at 8:30 AM4/27/26 at 12:00 PM4/28/265/5/26 by 2:00 PM5/11/267/1/269/1/26BIDDER’S QUESTIONSQuestions regarding this solicitation must be emailed and received by the Purchasing Dept.at ecardillo@westerlyri.gov no later than 12:00 p.m., April 27, 2026, in a Microsoft Wordattachment with the corresponding solicitation number. Questions, if any, and responseswill be posted on the www.westerlyri.gov website as an addendum to this solicitation.SPECIAL INSTRUCTIONS TO BIDDERS1. Bidder shall base the Proposal on providing all materials and equipment, FOB jobsite.1TOWN OF WESTERLY / WESTERLY PUBLIC SCHOOLS2. Bid Price which exceed $50,000 must include a 5% Bid Bond and cost of Payment andPerformance Bonds. The successful Bidder will be required to post a 100% Payment andPerformance Bond.3. Bidders shall note that their bid is based on Prevailing Wage (RIGL Sec 37-13-1 et seq.).The successful bidder and its subcontractors must pay their workers at the applicableprevailing wage rates (adjusted every July 1) for the various trades on a weekly basisand submit certified weekly payroll as described in the Instructions to Bidders. Prevailingwage rate schedules are available at the Rhode Island Department of Labor and Trainingwebsite at www.dlt.ri.gov.4. Bidder’s prices shall include all Permits/Fees.5. Quotes must be firm for a minimum of 120 days from date of submission.6. Bid Completeness - Pricing submitted on this project must be an all-inclusive price. Theintent of an all-inclusive Price is such that no Adds or Change Orders will be necessary.7. If the Bidder submits a supporting/additional document with their bid, that document mustinclude page numbers.8. This project is Tax exempt for Rhode Island Sales Tax and Federal Excise Taxes.9. The Successful Bidder MUST be able to have a response time that will allow an assignedproject to be completed when requested by the Town/School.RFQ BID DOCUMENTSAttachment A – Scope of Work, Pages 3-6Attachment B – Bid Form Pages 7-8Attachment C – Instruction to Bidders Pages 9-14APPENDIX A – Bidder Certification Pages 15-19Agreement-Westerly Standard Agreement Pages 20-28BIDDER CERTIFICATION FORM: Bidders must include, complete, and submit aBidder Certification Form with each bid proposal.This solicitation is available at www.westerlyri.gov. The Town of Westerly/Westerly PublicSchools reserves the right to reject any/all bids, waive any informalities in the bids receivedand to accept and award the bid to the lowest qualified bid deemed most favorable to theinterest of the Town/School. The Town/School does not discriminate based on age, color,gender, national origin, race, religion, sexual orientation, or disability in accordance withapplicable laws and regulations.Regards,Eileen CardilloPurchasing AgentTown of Westerly/Westerly Public Schools45 Broad Street Westerly, RI 02891Tel. (401) 348-2599ecardillo@westerlyri.govwww.WesterlyRI.gov2TOWN OF WESTERLY / WESTERLY PUBLIC SCHOOLSATTACHMENT "A"SCOPE OF WORKDESCRIPTION:Furnish and install new ductless air conditioning units to provide cooling to variousadministration and classroom spaces throughout the school district. This will include removal ofall non-functioning and unreliable units and installation of Mitsubishi or equivalent. Theinstallation of the new units will also include the installation and set-up of BacNet interfaces forthe new equipment.Springbrook Elementary SchoolClassroom 14, 15, 16, 17, 191 Install New Split System1.1 Supply and install one 3 ton Mitsubishi ductless split condensing units and one Mitsubishiceiling mounted evaporators per manufacturer’s instructions in each of the fiveclassrooms1.2 Provide wall cutting, drilling and patching1.3 Provide roof cutting and patching1.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing unitsfrom nearest electrical panel1.5 Supply and install new wall mounted wired thermostat controllers.1.6 Supply install and configure factory provided BacNet interface1.7 Supply and install condensate connections to the nearest suitable drain1.8 Start-up and testing of the new unitsClassroom 182 Demo Existing Split System2.1 Reclaim existing units. Catalog Freon per EPA guidelines2.2 Remove or replacing wiring as needed2.3 Remove all old piping and insulation.2.4 Clean up and dispose of all equipment, material, refrigerant and oil properly3 Install New Split System3.1 Supply and install one 3 ton Mitsubishi ductless split condensing units and one Mitsubishiceiling mounted evaporators per manufacturer’s instructions3.2 Provide wall cutting, drilling and patching3.3 Provide roof cutting and patching3.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing unitsfrom nearest electrical panel3.5 Supply and install new wall mounted wired thermostat controllers.3.6 Supply install and configure factory provided BacNet interface3.7 Supply and install condensate connections to the nearest suitable drain3.8 Start-up and testing of the new unitsClassroom 19 Exterior4 Raise one existing Condenser from ground level to wall.*Classroom 140 - ART5 Demo Existing Split System5.1 Reclaim existing units. Catalog Freon per EPA guidelines3TOWN OF WESTERLY / WESTERLY PUBLIC SCHOOLS5.2 Remove or replacing wiring as needed5.3 Remove all old piping and insulation.5.4 Clean up and dispose of all equipment, material, refrigerant and oil properly6 Install New Split System6.1 Supply and install one 3 ton Mitsubishi ductless split condensing units and one Mitsubishiceiling mounted evaporators per manufacturer’s instructions6.2 Provide wall cutting, drilling and patching6.3 Provide roof cutting and patching6.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing unitsfrom nearest electrical panel6.5 Supply and install new wall mounted wired thermostat controllers.6.6 Supply install and configure factory provided BacNet interface6.7 Supply and install condensate connections to the nearest suitable drain6.8 Start-up and testing of the new units*Classroom 141 - Music7 Install New Split System7.1 Supply and install one 3 ton Mitsubishi ductless split condensing units and one Mitsubishiceiling mounted evaporators per manufacturer’s instructions7.2 Provide wall cutting, drilling and patching7.3 Provide roof cutting and patching7.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing unitsfrom nearest electrical panel7.5 Supply and install new wall mounted wired thermostat controllers.7.6 Supply install and configure factory provided BacNet interface7.7 Supply and install condensate connections to the nearest suitable drain7.8 Start-up and testing of the new unitsDunn’s Corners SchoolPrincipal and Secretary1 Install New Split System1.1 Supply and install one 1-½ ton Mitsubishi 9,000 BTU per hour ductless splitcondensing units and two Mitsubishi wall mounted evaporators permanufacturer’s instructions1.2 Provide wall cutting, drilling and patching1.3 Provide roof cutting and patching1.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing unitsfrom nearest electrical panel1.5 Supply and install new wall mounted wired thermostat controllers.1.6 Supply install and configure factory provided BacNet interface1.7 Supply and install condensate connections to the nearest suitable drain1.8 Start-up and testing of the new unitsClassroom 1051 Install New Split System1.1 Supply and install one 9000 btu Mitsubishi ductless split condensing units and oneMitsubishi wall mounted evaporators per manufacturer’s instructions1.2 Provide wall cutting, drilling and patching1.3 Provide roof cutting and patching1.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing unitsfrom nearest electrical panel4TOWN OF WESTERLY / WESTERLY PUBLIC SCHOOLS1.5 Supply and install new wall mounted wired thermostat controllers.1.6 Supply install and configure factory provided BacNet interface1.7 Supply and install condensate connections to the nearest suitable drain1.8 Start-up and testing of the new unitsMain Office1. Install New Split System1.1 Supply and install one 4 ton Mitsubishi ductless split condensing units with brach boxesfor four Mitsubishi evaporators per manufacturer’s instructions. (2 Ceiling)Large Office,(1 Ceiling) Conference room, (1 Wall) Small office1.2 Provide wall cutting, drilling and patching1.3 Provide roof cutting and patching1.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing unitsfrom nearest electrical panel1.5 Supply and install new wall mounted wired thermostat controllers.1.6 Supply install and configure factory provided BacNet interface1.7 Supply and install condensate connections to the nearest suitable drain1.8 Start-up and testing of the new unitsBus GarageMechanic Office –1 Install New Split System1.1 Supply and install one Mitsubishi 6,000 ductless split condensing units and oneMitsubishi wall mounted evaporators per manufacturer’s instructions1.2 Provide wall cutting, drilling and patching1.3 Provide roof cutting and patching1.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing unitsfrom nearest electrical panel1.5 Supply and install new wall mounted wired thermostat controllers.1.6 Supply install and configure factory provided BacNet interface1.7 Supply and install condensate connections to the nearest suitable drain1.8 Start-up and testing of the new unitsMain Office -1 Demo existing Split System1.1 Reclaim existing unit. Catalog Freon per EPA guidelines1.2 Remove or replacing wiring as needed1.3 Remove all old piping and insulation.1.4 Clean up and dispose of all equipment, material, refrigerant and oilproperly2 Install New Split System2.1 Supply and install one 1-½ ton Mitsubishi 9,000 BTU per hour ductless split condensingunits and three Mitsubishi wall mounted evaporators per manufacturer’s instructions2.2 Provide wall cutting, drilling and patching2.3 Provide roof cutting and patching2.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing unitsfrom nearest electrical panel5
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
- NAICS 333415Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.