CSP- FORMAL REPAIR DAMAGE TO WHARF 23 AT TURNING BASIN TERMINAL
Project Information
- Bid Title
- CSP- FORMAL REPAIR DAMAGE TO WHARF 23 AT TURNING BASIN TERMINAL
- Issuing Agency
- Port of Houston Authority of Harris County, Texas
- Location
- Texas
- Published Date
- Jun 5, 2025
- Closing Date
- Jun 18, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 00003606
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Solicitation: 00003606
Header Information Bid Number:
00003606
Description:
CSP- FORMAL REPAIR DAMAGE TO WHARF 23 AT TURNING BASIN TERMINAL
Bid Opening Date:
06/18/2025 11:00:00 AM
Purchaser:
Tanika Chukwumerije
Organization:
Port of Houston Authority
Department:
72820 - PROJECT AND CONSTRUCTION MANAGEMENT
Location:
72820 - PROJECT AND CONSTRUCTION MANAGEMENT
Fiscal Year:
25
Type Code:
CP - CSP - Competitive Sealed Proposal
Allow Electronic Quote:
NoAlternate Id:
Required Date:
05/12/2025
Available Date
:
05/12/2025 03:32:15 PM Info Contact:
Contact procurementproposals@porthouston.com
Bid Type:
OPEN
Informal Bid Flag:
NoPurchase Method:
Open Market
Pre Bid Conference:
A Pre-Bid meeting will be held on May 28, 2025, at 9:00 a.m. at the Port Houston Authority Executive Office Building, 2nd Floor South Conference Room. ***A BID BOND OF 5% MUST BE SUBMITTED
Bulletin Desc:
This project consists of the removal and repair of roughly 27 feet of damaged fender frame and fender items due to damage from a ship allision of demolition of damaged fenders, piles, water beams, and repair and replace as needed.
Ship-to Address:
Roger H. Hoh
111 EAST LOOP NORTH (exit 29)
HOUSTON, TX 77029
US
Email: pcminvoicing@POHA.COM
Phone: (713)670-2523
Bill-to Address:
Roger H. Hoh
111 EAST LOOP NORTH (exit 29)
HOUSTON, TX 77029
US
Email: pcminvoicing@POHA.COM
Phone: (713)670-2523
Print Format:
Bid Print
File Attachments:
TERMS AND CONDITIONS .pdf
CSP-3606 Repair to Damage of Wharf 23.pdf
PRE-PROPOSAL MEETING INSTRUCTIONS
ADDENDUM NO. 1
Form Attachments:
Legal Contract:
Contract Required
Amendments:
Amendment # Amendment Date Amendment Note
1
05/15/2025 11:45:13 AM
Administrative Addendum. No signed acknowledgement required. Header 1. Allow Electronic Response changed from "Yes" to "No". Attachment File Changes: Header 1. File 'PRE-PROPOSAL MEETING INSTRUCTIONS': File 'PRE-PROPOSAL MEETING INSTRUCTIONS' added .
2
06/05/2025 10:52:45 AM
Include the signed 2-page addendum acknowledgment with the emailed proposal response. Header 1. Bid Opening Date changed from "06/11/2025 11:00:00 AM" to "06/18/2025 11:00:00 AM". Attachment File Changes: Header 1. File 'ADDENDUM NO. 1': File 'ADDENDUM NO. 1' added .
3
06/05/2025 11:38:46 AM
Include the signed 2-page addendum acknowledgement with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 1': File 'ADDENDUM NO. 1' deleted . 2. File 'ADDENDUM NO. 1': File 'ADDENDUM NO. 1' added .
Item Information
Item # 1:
(
912
-
40
)
MINUTE NO: TBD
FILE NO: 2025-0141
FORMAL-FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES, SUPERINTENDENCE, INSURANCE, INCIDENTALS, AND ALL OTHER THINGS NECESSARY TO PERFORM SERVICES FOR REPAIR DAMAGE TO WHARF 23 AT TURNING BASIN TERMINAL ALL IN ACCORDANCE WITH CONTRACT DATED _________________________________. ALL INVOICES AND CORRESPONDENCE SHALL BE ADDRESSED TO THE ATTENTION OF JOSH KELLER, PROJECT MANAGER. A CERTIFICATE OF INSURANCE MUST BE PROVIDED PRIOR TO COMMENCEMENT OF ANY WORK. THE PORT AUTHORITY MAY AT ITS OPTION, CANCEL THIS PURCHASE ORDER AT ANY TIME AND PAY THE CONSULTANT FOR ACTUAL SERVICES PERFORMED BASED ON THE WORK PERFORMED UP UNTIL RECEIPT OF SUCH WRITTEN NOTICE.
NIGP Code:
912-40
Demolition ServicesQty Unit Cost UOM Tax Rate Tax Amount Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2:
(
913
-
62
)
SUBSEQUENT NIGP CODE
NIGP Code:
913-62
Construction, Concrete, Pour-In-Place, Form, Place, FinishQty Unit Cost UOM Tax Rate Tax Amount Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 3:
(
914
-
30
)
SUBSEQUENT NIGP CODE
NIGP Code:
914-30
ConcreteQty Unit Cost UOM Tax Rate Tax Amount Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 4:
(
913
-
89
)
SUBSEQUENT NIGP CODE
NIGP Code:
913-89
Maintenance and Repair, Utility and Underground ProjectsQty Unit Cost UOM Tax Rate Tax Amount Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 5:
(
914
-
79
)
SUBSEQUENT NIGP CODE
NIGP Code:
914-79
Structural and Reinforcement Metal WorkQty Unit Cost UOM Tax Rate Tax Amount Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Copyright © 2025 Periscope Holdings, Inc. - All Rights Reserved.
default
- Commodity Codes
-
- NAICS 237990Other Heavy and Civil Engineering Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Follow Joe Pool Dam Slide Repairs Active Contract Opportunity Notice ID W9126G26BA010 Related
DEPT OF DEFENSE
Bid Due: 10/20/2026
290 Toll MBGF Upgrades (Ph II...
PROJECT NAME TYPE STAGE DOCUMENTS KEY DATES VALUE 290 Toll MBGF Upgrades (Ph
Central Texas Regional Mobility Authority