Speegleville Rd. Utility Improvements
Project Information
- Bid Title
- Speegleville Rd. Utility Improvements
- Issuing Agency
- City of Waco
- Location
- Texas
- Published Date
- Aug 21, 2025
- Closing Date
- Sep 16, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFB 2025-055
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project: Speegleville Rd. Utility ImprovementsRef. #: RFB 2025-055Department: Water UtilitiesType: RFBStatus:OpenOpen Date: Jul 21st 2025, 8:00 AM CDTQuestions Due Date: Sep 3rd 2025, 5:00 PM CDTContact Information: Melanie Wade, melaniew@wacotx.govClose Date: Sep 16th 2025, 2:00 PM CDT
Project Description: The City of Waco has issued this solicitation for the Speegleville Road Utility Improvements Project. The project shall generally consist of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place approximately 1,950 linear feet of 24-inch PVC C900 waterline, an approximately 1,275 linear feet horizontal directional drilling crossing of the Middle Bosque River utilizing 42-Inch HDPE casing piping and 30-Inch HDPE waterline piping, approximately 1,530 linear feet of 18-inch PVC gravity wastewater line, manholes, approximately 1,600 linear feet horizontal directional drilling crossing of the Middle Bosque River utilizing 16-Inch HDPE force main, temporary by-pass system, abandonment of existing
waterlines/wastewater lines, surface replacement, road repair and all necessary components as shown on the project drawings and as specified herein.
This RFB requires prequalification of General Contractors and Horizontal Directional Drilling subcontractors. General Contractors are required to submit the questionnaire and other required information along with the prequalification application of any Horizontal Directional Drilling Subcontractor(s) the General Contractor would like the City to consider, which will then be reviewed by the City and/or its agents. Based on the criteria set out in this solicitation, bids will only be accepted from a General Contractor if said bid involves a prequalified Horizontal Directional Drilling Subcontractor. Any bid which fails to include a prequalified
Horizontal Directional Drilling Subcontractor will be returned as non-responsive.
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Country Club west Stoplog Reh...
Follow Country Club west Stoplog Rehabilitation Active Contract Opportunity Notice ID FY4201010 Related
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Bid Due: 7/10/2026
Reference #: 2606-069. Name: ...
Reference #: 2606-069. Name: Teel Parkway Parking Addition Questions Due Date: Jul 23rd
City of Frisco
Bid Due: 7/30/2026