Sliding Doors, Control Mechanism Replacement
Project Information
- Bid Title
- Sliding Doors, Control Mechanism Replacement
- Issuing Agency
- Mc Lennan County
- Location
- Texas
- Published Date
- Apr 9, 2026
- Closing Date
- May 14, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- Bid 26-004
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: Bid 26-004
Bid Title: Sliding Doors, Control Mechanism Replacement
Category: County Bids Status: Open Publication Date/Time: 4/9/2026 8:00 AM Publication Information: Waco Tribune Herald Closing Date/Time: 5/14/2026 2:00 PM Submittal Information: Hard Copy enclosed in Envelope or Carton Bid Opening Information: Public Bid Opening Pre-bid Meeting: 04/23/2026 at 10:00 AM Contact Person: Ken Bass at [email protected] To enter McLennan County Jail Grounds a Background Check must be conducted on each person. A Background Check Form is included in the Bud Documents under Exhibit 1. Please fill out for and send ti Corporal Aron York at [email protected]
Download Available: https://www.mclennan.gov/Bids. Business Hours: 8:00 am to 5:00 pm Related Documents: - Attachment Preview
-
McLennan CountyPurchasing Agent, Ken Bass214 North 5th StreetWaco, TX 76701Phone: 254-759-5627Fax: 254-757-5068E-mail: ken.bass@mclennan.govMcLennan County, BID 26-004SLIDING DOORS, CONTROL MECHANISM REPLACEMENT, PHASE THREE (3)Bid Release:April 9, 2026Date and Time Bid is Due:No Later ThanThursday May 14, 20262:00 P.M. CSTMcLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3)Page 1 of 34BIDDER INSTRUCTIONSA.Invitation to Bid: This Invitation to Bid, is for the convenience of submitting a bid, for the enclosedBID26-004 - Sliding Doors, Control Mechanism Replacement, Phase Three (3), at the McLennan County,Highway Six (6) Jail.A.1.Scope of Work, Addenda/Addendum(s), Specifications and Requirements, may be obtainedfrom the McLennan County Purchasing Website: https://www.co.mclennan.tx.us/Bids.aspx or by calling usat (254) 757-5016.1.It is at the responsibility of a respondent to periodically check the website or call for anyupdates or addenda/amendments to this request.2.Note to Contact Us: If you are downloading this bid and anticipate responding, pleasecontact, by preferred email, Purchasing Director, Ken Bass, email,Ken.bass@mclennan.gov and Contract Administrator, Tim Cubos, Tim.Cubos@mclennan.gov or byphone at (254) 757-5016, for a general idea of responding bidder(s).B.Onsite Inspection, Pre-Bid, and Walk-Through: A non-mandatory walk-through tour, of the project area forinterested parties will be Thursday, April 23, 2026 at 10:00 a.m.B.1. Location: McLennan County Highway Six (6) Jail; 3201 E. State Highway Six (6), Waco, TX. 76705.B.2. Note: Government Identification, such as a state driver’s license or state identification card, will berequired. A background check to ensure an individual is authorized to enter the jail, maybe required prior toentering facility. See “Exhibit 1” for forms to fill out and contact for each person to enter the Jail Groundsfor the Prebid Meeting. Please fill out form and email to Corpral Aron York at aron.york@mclennan.govB.3. Walk-through Questions: Please direct any questions to Ken Bass and Tim Cubos at theabove contact information.B.4. Non-Mandatory: walk-though, although it is recommended that all anticipated and respondingbidders inspect and determine pre-existing conditions, prior to submitting a response.C.Respondent Responsibility:C.1. It is the responsibility of each responding firm, before submitting a Bid:1.Examine thoroughly the documents and other related data identified in the Bid documents.2.Consider federal, state, and local laws and regulations that may affect costs, progress,performance or furnishing of the work.3.Promptly notify Ken Bass and Tim Cubos, by preferred email at the above listedemail addresses or phone number; of all conflicts, errors, ambiguities, or discrepancies whichvendor has discovered in or between the contract documents and such other relateddocuments.C.2. Communication and Clarification Questions: Bidder, may submit general/clarification questionsconcerning contract information, bid specifications or requirements to Ken Bass and Tim Cubos bypreferred email at the above listed email address or by phone number listed above. Vendors areencouraged to submit your questions as soon as possible to allow adequate time for answers and anyissues that may arise.1.Responding Bidder, should inspect and determine pre-existing conditions, prior to submitting aresponse.D.Closing, Submittal and Return of Sealed Bid:D.1.Closing Date and Time: Sealed Bid, shall be received by the McLennan County Purchasing Departmentby closing date and time Thursday, May 14, 2026; 2:00pm (CST)D.2.Submittal: Submittal(s) should contain one (1) original bid response and one (1) duplicate/copy of the Bidresponse, for a total of two (2) complete responses. The original and copy can be in the same sealedenvelope, box or container and should be clearly marked as “Original” and “Copy”.McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3)Page 2 of 34D.3.D.4.D.5.D.6.D.7.Sealed Bid: Bid(s), shall be received, in a sealed envelope, box or container, at the below address, clearlyand plainly marked: Responding Company Name and AddressMcLennan County Purchasing Department“BID26-004 – “Sliding Doors, Control Mechanism Replacement Phase Three (3)”214 N. 5th Street, Waco, TX 76701Submittal of Confidential Material: Any material that is to be considered as confidential in natureshall be clearly marked as such by the bidder and will be treated as confidential by McLennan County.1.Please do not mark entire pages as confidential. Please be specific in the indication ofprovided information to be considered and to be kept as confidential.Please visit Texas Gov't Code Section 552.1101 for information that qualifies as submittedconfidential information.a. Quick Link Guide: Texas Gov't Code Section 552.1101: Exception: Confidentiality ofProprietary Information Link: https://texas.public.law/statutes/tex._gov't_code_section_552.1101b. Complete Texas Code 5 Link: Open Government Code Title 5. Open Government;Ethics Subtitle A. Open Government; Chapter 522. Public Information; Subchapter A.General Provisions Link: https://statutes.capitol.texas.gov/Docs/GV/htm/GV.552.htmBID Withdrawal, Change and Alternate Bid:1.Bidders may withdraw Bid responses at any time prior to the official opening.2.To guarantee the authenticity of the change, responding proposer shall initial alterations madeprior to bid opening date and time.3.After the official opening, Bids, may not be amended or altered, and may not be withdrawnwithout the approval of the McLennan County Commissioners Court.Link: https://www.co.mclennan.tx.us/182/Commissioners-CourtUnacceptable Responses: Emailed or faxed Bid, response(s) shall and will NOT be accepted.Late Bid(s): Late Bid(s) or Bid(s) not received by closing date and time shall NOT be considered.McLennan County is not responsible for the lateness of mail carrier, courier, or weather conditions, etc.E.Public Bid Opening:E.1. Bid, opening will take place in the Purchasing Department, 214 N. 5th Street, Waco, TX. 76701, Thursday,May 14, 2026, following 2:00pm closing date and time, at which time bids will be opened and read aloud.Responding vendors, their representatives and interested persons may be present.F.Acceptance and Rejection of Bid: It is to be understood, McLennan County reserves the right to accept orreject any and all bids, as it shall deem to be in the best interest of McLennan County. McLennan County alsoreserves the right to waive any technicalities where such is in the County's best interest.G.Insurance and Workers Compensation: All insurance requirements, including Worker’s Compensation, asoutlined in Texas state statutes shall be met by the successful offeror prior to any delivery and shall remain ineffect during the life of this, Contract. Failure to provide the required certificates upon submission of the Bidmay result in the offer being declared non-responsive.II.GENERAL PROVISIONSA.The period for acceptance of this Bid will be thirty (30) calendar days unless the bidder notes a differentperiod for McLennan County Commissioners Court, acceptance and approval.B.Exceptions: Bid speaks for itself. Bidders who are taking exception to any terms, conditions, requirements orspecifications of this bid, shall clearly state in writing such exception(s) and should be included where indicated inSection XIII. Statement of Compliance. McLennan County will be the sole judge of the acceptability of anyexception noted and is not bound to consider any bid submitted with exceptions.C.Alternates: Trade names are used solely for the purpose of setting minimum standards of quality and performanceand are not to be construed as exclusionary. Bidders, are encouraged to contact the Purchasing Director, Ken Bass,by preferred email at ken.bass@mclennan.gov and Contract Administrator, Tim Cubos, by preferred email atTim.Cubos@mclennan.gov, or by contacting us by phone at (254) 757-5016, prior to the bid opening for the purposeof clarifying specifications.McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3)Page 3 of 34C.1. If a notation of substitution is not made, it is assumed that the Bidder is bidding the item specified.All substituted items shall be approved by the McLennan County Facilities Director, before shipping,or the item may not be accepted.D.McLennan County reserves the right to utilize any referenced business client(s), through-out responsesubmitted, for past performance.F.No Commitment by McLennan County: This Invitation to Bid, does not commit McLennan County, toaward any contact, or to pay any costs associated or incurred in the preparation and response to this bid, toprocure or contract for the requested good(s) and/or service(s).III. SCOPE OF WORKA.McLennan County, Maintenance of Facilities, for highway six (6) Jail, phase three (3), is seeking the services of abonded contractor, to provide service, to replace multiple sliding door control system mechanisms. This projectconsists of furnishing all equipment, materials and labor necessary for completion.B.Contractor shall remove twelve (12) sliding doors currently in place, properly and securely store doors onsite, in adesignated area. Once the doors have been removed and properly stored, awarded vendor, shall replace and installeach control mechanism. Once the control mechanism has been installed and replaced, stored doors are to beproperly reinstalled to a fully functional and operational capacity.B.1. System shall include a mechanical override, which will be at the sole responsibility of the awardedcontractor. Awarded contractor, shall ensure all proposed options, and are approved by and in accordancewith the Texas Jail Standards, TJS. If perchance, the awarded contractor does not meet TJS, any and allincurred cost required to meet TJS, as an approved solution, will be the sole responsibility of the awardedcontractor.C.Hours of delivery/service shall be between 9:00 a.m. and 4:00 p.m. (Central Standard Time Zone, CST) Mondaythrough Friday, unless otherwise stipulated.D.The scope of work will consist of, but not limited to the below:D.1. All power supplies, wiring, and controls will be provided by McLennan County, through a separate vendor.D.2. Replacement of sliding door operators/controls (twelve (12) unit total).1.Remove existing doors and store in secure onsite location.2.Remove and dispose of existing pneumatic sliding devices and housing.3.Remove and dispose of existing airlines from source to devices.4.Prime, paint, and repair existing doors as necessary. (Paint to match/flush with existing color)D.3. Re-install existing doors:1.Doors to be hooked back up, adjusted, lubricated, tested and to be fully operational and functional.2.Install new (Southern Steel 3150LXbHC-1) Electromechanical sliding devices with emergencyreleases per Southern Steel, specifications.3.Caulk, prime, and paint all new housing and necessary components.4.Provide twenty (20) additional emergency release tools.5.The performance period for this project shall not exceed 180 days, day-for-day, from beginning toend.IV. CONTRACT REQUIREMENTSA.Awarded contractor, shall execute all construction, labor, materials, equipment and services required to complete theproject. The term "work" as used in this Contract Agreement, shall refer to all the construction and services requiredby the contract documents for this project, items or trades for which the awarded contractor, is responsible, and alllabor, materials, equipment, and services provided or to be provided by the awarded contractor, to fulfill itsobligations and to provide the complete and functional Project, whether or not expressly set forth in the contractdocuments.McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3)Page 4 of 34B.Conduct of the Work: Awarded contractor, shall be responsible for the safety of its employees and subcontractors,and shall perform the work in accordance with applicable law, codes, ordinances and regulations of the State ofTexas and the United States, and in compliance with OSHA and local regulations and codes, and in compliance withother laws as they apply to its employees and contractors. Safety precautions at the site are part of the constructiontechniques and processes for which the awarded contractor shall be solely responsible. The Contractor assumesresponsibility and liability for workplace safety on the site, and hereby agrees to indemnify Owner and hold Ownerharmless from any liability caused by the awarded contractors, failure to comply with applicable federal, state or localregulations touching upon the maintenance of a safe and protected working environment and the safe use andoperation of machinery and equipment in that working environment.C.1. Awarded contractor, is solely responsible for the handling and use of hazardous materials, and waste, andinforming the Owner and his employees of any such hazardous materials or waste. The indemnificationgiven above shall not in any way limit the general indemnifications set forth in other portions of thisAgreement.C.2. Awarded contractor, shall supervise and direct the work, using the Contractor's best skill and attention.Awarded contractor shall be solely responsible for and have control over the construction means, methods,techniques, sequences and procedures, and for coordinating all portions of the work under this Contract.C.3. Awarded contractor, shall keep the premises and surrounding area free from accumulation ofwaste or materials caused by operations under this Agreement. At the completion of the work, theContractor shall remove from and about the Project waste materials, rubbish, the Contractor'stools, construction equipment, machinery and surplus materials. If the Contractor fails to clean upthe work site as provided in the Contract Documents, the Owner may do so and charge the cost tothe Contractor.C.McLennan County, Facilities Director, as the Owner's representative, may order minor changes (defined as changeswhich involve only aesthetics or matters which do not increase construction costs, and which are agreed in writing bythe Contractor and County Facilities Director to be minor changes) that will not result in a change in the contractsum or an extension of time for completion, and which are not in material conflict with the plans and specifications orthe purpose of the Project. Such changes shall be ordered in writing by McLennan County Facilities Director, with acopy to the Owner. Such changes shall not affect the validity of this, Contract Agreement.D.Awarded contractor, shall provide a minimum of one (1) year warranty on all work performed.E.Awarded contractor, is responsible for obtaining any and all building permits and inspections, if required.F.1. Building permits are to be included in the bid price.F.Essence of Time: Time is of the essence, in the completion of the work/services covered by the Contract.Awarded contractor shall substantially complete the entire work/services no later than 160 days from the date thecontract is signed by McLennan County Commissioner’s Court and a work schedule has been established withMcLennan County Facilities Director.G.1. Substantial completion is the stage in the progress of the work where this project is sufficientlycomplete in accordance with the Contract Documents, so that this project is essentially completeexcept for minor items not affecting the integrity of this project.G.2. Final Completion of the Project shall not be later than thirty (30) days after the SubstantialCompletion, unless a different period of time is agreed to by McLennan County and awardedcontractor, in writing.G.3. Final Completion is the date upon which all work and services remaining to be completed aftersubstantial completion are completed, and the Project is accepted by the Owner.G.Texas Commission on Jail Standards: All work shall comply with any applicable regulations of the TexasCommission on Jail Standards. Awarded contractor, shall be responsible for correcting or replacing work that doesnot comply with Commission standards at no additional cost to the Owner. Contractor shall assist the Owner, inpreparing any required submissions to the Commission, and shall be present for the inspection of the work by theCommission. Link: https://www.tcjs.state.tx.us/jail-standards/H.Prison Rape Elimination Act (PREA): Awarded contractor and any employees and/or sub-contractors, shallacknowledge and comply with the PREA, act. PREA act, establishes a zero-tolerance standard against sexual abuseof incarcerated persons of any age. This makes the prevention of sexual abuse in TJJD facilities a top priority. Link:https://www.tjjd.texas.gov/index.php/preaI.Background Checks: There are some McLennan County buildings that require that support personnel and/orcontractors be subject to background checks. All persons assigned to work in some areas such as the McLennanCounty, jails and juvenile detention center or are interested in attending the tour of facilities, shall pass a backgroundcheck to ensure an individual is authorized to enter the jail and detention facilities.McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3)Page 5 of 34
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238290Other Building Equipment Contractors
- NAICS 238990All Other Specialty Trade Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
PW Gate 1 Turn Lane, City Pro...
Project: PW Gate 1 Turn Lane, City Project No. 104125 Ref. #: 26-0169
City of Fort Worth
Bid Due: 7/30/2026
Follow COVER, ACCESS Active Contract Opportunity Notice ID W31P4Q-26-R-0011-0001 Related Notice W31P4Q-26-R-0011 Department/Ind.
DEPT OF DEFENSE
Bid Due: 7/24/2026