RFP for County Road 19A Realignment and Corridor Improvements
Project Information
- Bid Title
- RFP for County Road 19A Realignment and Corridor Improvements
- Issuing Agency
- Washington County
- Location
- Minnesota
- Published Date
- May 12, 2026
- Closing Date
- May 26, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: RFP for County Road 19A Realignment and Corridor Improvements
Category: Washington County Public Works Status: Open Description: The Washington County Public Works Department is issuing this request for proposals (RFP) to hire a consultant to provide final design engineering services for the County Road 19A Realignment and Corridor Improvement Project.
Publication Date/Time: 5/12/2026 10:00 AM Closing Date/Time: 5/26/2026 3:00 PM Contact Person: Ryan Hoefs, Project Manager
ryan.hoefs@washingtonCountymn.govRelated Documents: - Attachment Preview
-
Request for Proposals (RFP) forPROJECT COORDINATION, FINAL DESIGN ENGINEERING, BRIDGEDESIGN, STAKEHOLDER AND PUBLIC ENGAGEMENT, ENVIRONMENTALDOCUMENTATION, UTILITY COORDINATION, PERMITTING, ANDBIDDING AND CONSTRUCTION SERVICESCounty Road 19A Realignment andCorridor ImprovementsCity of Cottage GroveRFP release date: 05/12/2026Proposal due date: 05/26/2026Government Center | 14949 62nd Street North | P. O. Box 6 | Stillwater, MN 55082-0006P: 651-430-6001 | F: 651-430-6017 | TTY: 651-430-6246www.washingtonCountymn.govWashington County is an equal opportunity organization and employerTable of Contents1. Introduction ...................................................................................................................................................... 31.1. Background Information .......................................................................................................................... 31.2. Project Goals and Objectives.................................................................................................................... 41.3. Schedule ................................................................................................................................................... 42. Scope of Work and Deliverables ....................................................................................................................... 42.1. Project Management................................................................................................................................ 42.2. Data Collection ......................................................................................................................................... 52.3. Public and Agency Engagement ............................................................................................................... 62.4. Design Services ......................................................................................................................................... 62.5. Construction Plans and Specifications ..................................................................................................... 72.6. Project Costs............................................................................................................................................. 72.7. Permits and Approvals ............................................................................................................................. 82.8. Environmental Documentation ................................................................................................................ 82.9. Deliverables .............................................................................................................................................. 82.10. Bidding and Construction Assistance Services ......................................................................................... 82.11. Additional Tasks........................................................................................................................................ 93. Proposal Content............................................................................................................................................... 93.1. Title Page/Cover Letter............................................................................................................................. 93.2. Project Understanding & Approach ......................................................................................................... 93.3. Key Personnel ........................................................................................................................................... 93.4. Work Plan ................................................................................................................................................. 93.5. Qualifications and Experience .................................................................................................................. 93.6. Appendix A – County’s Standard Terms and Conditions........................................................................ 103.7. Conflict of Interest.................................................................................................................................. 104. Proposal Submittal .......................................................................................................................................... 105. Proposal Evaluation......................................................................................................................................... 105.1. Reserved Rights ...................................................................................................................................... 106. Proposal Questions ......................................................................................................................................... 11Page |2CSAH 32 Final Design Services1. Introduction1.1. Background InformationThe Washington County Public Works Department is issuing this request for proposals (RFP) to hire aconsultant to provide final design engineering services for the County Road 19A Realignment and CorridorImprovement Project.A preliminary design phase for this project kicked off in early 2025 and was completed this spring.Through this phase, multiple alternatives were evaluated, a preferred design was identified, and apreferred layout is complete. More information can be found on the project website at:https://www.washingtoncountymn.gov/19arealignment.In addition, topographic survey has been collected, wetlands have been delineated, utility data has beencollected to Quality Level D, a preliminary hydraulics analysis has been completed, and a CATEX isunderway.Short Elliot Hendrickson, Inc. is currently under contract to complete the preliminary design phase. Thiswork included alternative evaluation, major utility coordination, 30% project layout and associated costestimate, as well as start environmental documentation and railroad coordination. These materials will beshared with the selected Consultant for final design services.This design phase of this project will use local funds. The future construction phase of this project will befunded with a combination of federal, state, and local funds.This project will be a cooperative project between Washington County and the City of Cottage Grove, withWashington County serving as the lead agency. All work performed under the anticipated contract mustbe carried out in accordance with the procedures, requirements, and regulations of MinnesotaDepartment of Transportation (MnDOT) State Aid, Washington County, and the City.All reports/documentation must be developed and presented in Microsoft Office and all design files mustbe developed and presented in MicroStation/ORD adhering to Washington County approved formatsunless otherwise noted or requested by the Consultant (the selected firm to perform this work) withapproval of the County.The role of the selected Consultant team will be to complete all tasks necessary to take the project toapproved construction documents. Washington County will act as the lead agency through all aspects ofthe project.The County’s role as lead agency does not preclude direct and regular interaction between the Consultantand the City, the Watershed District, MnDOT and other agencies. External Agency input and review isimportant; however, the County is to be kept informed of agency dialogue and will assist the Consultantin determining the need and scope of interaction with a particular agency.Page |3CSAH 32 Final Design Services1.2. Project Goals and ObjectivesThe objective of this project is to plan, design and prepare for a realignment of County Road 19A to supportthe southwest arterial highway vision, while at the same time implementing responsible long-term solutionsalong this corridor. In summary, the project goals are as follows: Improve the safety, capacity, and operation for all users along the corridor. Improve pedestrian facilities and connectivity along the corridor. Provide a grade separated crossing over the CPKC Railroad. Complete a mandatory EAW & CATEX Documentation. Refine and set corridor alignments that minimize impacts while improving safety, capacity, andoperations. Identify and implement stormwater drainage improvements that appropriately balance therequirements of all agencies with the needs and goals of the community. Maintain the long-term transportation goals of Washington County, City of Cottage Grove, andMnDOT. Effectively coordinate project impacts with private utilities and the CPKC Railroad Achieve a construction schedule that ensures previously awarded federal funding timelines are metand minimizes public inconvenience, while being sensitive to reducing overall project costs andenvironmental impacts.1.3. ScheduleWashington County anticipates the following schedule:Overall Project ScheduleRFP SolicitationProposals DueCounty Board Awards Consultant ContractProject Kick-offROW Acquisition60% Plans90% PlansFinal PlansEnvironmental Documentation CompleteBid Letting (by Washington County)Preconstruction Open HouseConstructionAnticipated DateMay 12, 2026May 26, 2026June 16, 2026June 2026May 2026 –August 2027October 2026February 2027June 2027April 2027August 2027August 2027September 2027 - October 20292. Scope of Work and DeliverablesThe following lists outline work tasks and associated items that shall be included as part of thecontracted services.2.1. Project ManagementThe Consultant will perform all work necessary to effectively coordinate the project completion,maintain the project schedule and budget, as well as manage the Project Management Team (PMT). TheConsultant should host monthly PMT meetings, which will be a mix of virtual and in-person meetings.The proposal should include a summary of the project management measures required to ensure thatthe project is completed on time, within budget, and in accordance with applicable laws, policies,Page |4CSAH 32 Final Design Servicesstandards, and good engineering practice. Monthly progress reports shall be submitted with eachinvoice.The selected Consultant shall develop and implement a project specific Quality Management Plan, whichshall be available for review upon request during the project.2.1.1Internal and External Team CoordinationThe selected Consultant will be responsible for managing the day-to-day project coordination activitiesof all project work, including coordination with Washington County. This includes phone calls, e-mails,and other correspondence.Washington County will lead general correspondence with external project stakeholders. The selectedConsultant may be asked to support the coordination by attending meetings, producing exhibits, etc.Some examples of anticipated correspondence may include, but is not limited to: Coordination with agency stakeholders, including the City of Cottage Grove, Watershed District,MnDOT State and Federal Aid groups, MnDOT Office of Environmental Stewardship, MinnesotaHistorical Society, MnDOT Cultural Resources, Minnesota Office of the State Archeologist, StateHistoric Preservation Office, and required agencies for environmental reviews.2.1.2Quality Management PlanThe selected Consultant shall develop and implement a project specific Quality Management Plan (QMP)which will detail specific quality control activities and processes that will be utilized throughout theduration of the project.The plan for quality control and quality assurance checks of the following submittals shall be included:60% plans, 60% cost estimate, 90% plans, 90% specifications, 90% cost estimate, final plans, finalspecifications, and final cost estimate.The QMP shall be kept up to date and available for review upon request during this project phase.2.2. Data CollectionThe Consultant shall collect existing data and reports relevant to the project area and obtain newinformation as needed for all aspects of the project, including all relevant documentation requiredfor the federal funding requirements.Washington County will provide the following information to the successful Consultant: Aerial imagery Topographic Survey Existing CAD files associated with approved layout Existing Right of Way information Record Plans Existing Project Tech MemosPage |5
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
I494 Design Build Project 2 V...
I494 Design Build Project 2 Verification Team Brief Description: MnDOT requests responses for
State Government of Minnesota
Bid Due: 7/14/2026
26-21 - Maple Grove Community...
Bid Title: 26-21 - Maple Grove Community Center Phase 2 - BP2 Category:
City of Maple Grove
Bid Due: 7/28/2026