- Project Description
-
Project ID: 25-0259-PR
Title: Florissant Golf Club Irrigation
Addenda: 0
Release Date: 6/15/2026
Due Date: 7/21/2026
Florissant Golf Club IrrigationFollowInvitation For BidParks and Recreation22131 , 221310Project ID: 25-0259-PRRelease Date: Monday, June 15, 2026· Due Date: Tuesday, July 21, 2026 10:00amPosted Monday, June 15, 2026 5:24pmAll dates & times in Central TimeDraft Response Events RSVP No Bid35 days, 13 hours, 44 minutesOverview
Post Information
Posted At:Mon, Jun 15, 2026 5:24 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryGeneral work description:
The work included under this bid shall consist of furnishing all labor, supervision, materials, equipment, tools, transportation, testing, documentation, and incidentals necessary to complete the installation of a new golf course irrigation system at Florissant Golf Club in accordance with the project plans, specifications, and applicable codes and standards.
The project generally includes, but is not limited to, the following:
- Installation of a complete new Rain Bird Integrated Control (“IC”) irrigation system throughout the golf course property.
- Installation of new HDPE mainline and lateral piping systems, including all required fittings, fusion work, isolation valves, drains, air/vacuum relief valves, valve boxes, swing joints, quick couplers, grounding components, and related appurtenances.
- Installation of Rain Bird IC sprinkler heads for greens, tees, fairways, and perimeter areas as identified in the plans and specifications.
- Installation of Rain Bird CirrusPro Central Control System, integrated control interface equipment, surge protection devices, rain shutdown components, Maxi wire communication cable, grounding systems, and all associated electrical and communication components.
- Removal and disposal of existing irrigation components as required to facilitate installation of the new system.
- Trenching, vibratory plowing, boring, bridge crossings, backfilling, compaction, sod replacement, restoration, cleanup, and repair of disturbed areas.
- Maintenance of operation of the existing irrigation system during construction as required by the Golf Course Superintendent.
- Coordination of construction sequencing to maintain golf course operations, including keeping all but one hole open during construction and completing each hole before proceeding to the next.
- Field coordination with staking provided by the Designer and preparation of complete as-built documentation identifying pipe routing, wiring, valves, splices, control components, and related infrastructure.
- Testing, startup assistance, flushing, grounding verification, and final operational testing of the irrigation and IC control systems in accordance with manufacturer recommendations and project specifications.
- Provision of warranties, guarantees, spare equipment, training coordination, and post-installation support as specified in the contract documents.
The Contractor shall perform all work in compliance with prevailing wage requirements, OSHA regulations, Missouri Division of Labor Standards requirements, applicable utility coordination requirements, and all local, state, and manufacturer installation standards.
The Contractor shall be responsible for protecting existing utilities, golf course improvements, pavements, drainage structures, and landscaping during construction and shall restore all disturbed areas to the satisfaction of the Owner.
All materials shall be new and installed in strict accordance with the irrigation plans and specifications. No substitutions shall be permitted unless approved in writing by the Owner and Designer.
Project Schedule:
- Project Start Date: January 2, 2027
- Substantial Completion Date: April 30, 2027
The Contractor shall provide sufficient manpower, supervision, equipment, and scheduling coordination necessary to achieve project completion within the specified timeframe while maintaining golf course operations as required by the Owner.
The Contract Time is based on normal seasonal weather conditions reasonably anticipated for the project location. The Contractor may request a time extension for delays resulting from unusually severe weather conditions that prevent the performance of critical path work. Requests for weather-related extensions shall be submitted in writing and supported by documentation identifying the dates, duration, and impact of the weather event on project activities. Upon verification by the Owner, the Contract Completion Date may be extended on a day-for-day basis for approved weather delay days
Project Location and Shipping Address:
Florissant Golf Club
50 Country Club Lane
Florissant, MO 63033Bid Documents: Please see attachment section
Exhibit A: Florissant Bid Specs
Exhibit B: Florissant Bid Form
Exhibit C: Commodity Adjustment Form
Exhibit D: Florissant Bid DWG SetTurfwerks Contact:
Brian Freeman
Davis Equipment Companies | General Manager, Irrigation Division, Turfwerks
Email: bfreeman@turfwerks.com
Phone: (913)530-3903Please Note: All vendor questions or bid document questions need to be submitted through the Question and Answer section of OpenGov. Emailed or phone call questions will not be answered and you'll be directed to submit your question through the bid document.
Timeline
Release Project Date:June 15, 2026Pre-Bid Meeting (Non-Mandatory):June 30, 2026, 11:00am50 Country Club Lane, Florissant, MO 63033Question Submission Deadline:July 19, 2026, 5:00pmQuestion Response Deadline:July 20, 2026, 5:00pmSubmission Deadline:July 21, 2026, 10:00amZoom: https://us04web.zoom.us/j/75567036986?pwd=7Mi0jcoF8ZnG6YozLMUTt9SRGSxL24.1
Passcode: y7DZS4 Session will begin at 10 am and continue until prices for all bidders have been read.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
MoDOT Central District - One-...
Basic Information Negotiation MODOT 0000000399SL Title MoDOT Central District - One-Ton Single Rear
State Government of Missouri
Bid Due: 8/26/2026
Transit Vehicles - OEM Standa...
Basic Information Negotiation MODOT 0000000379SL Title Transit Vehicles - OEM Standard Passenger Van
State Government of Missouri
Bid Due: 9/24/2026