Ticket Level Expansion & Optimization
Project Information
- Bid Title
- Ticket Level Expansion & Optimization
- Issuing Agency
- Tampa International Airport
- Location
- Florida
- Published Date
- Sep 10, 2025
- Closing Date
- Nov 5, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: Ticket Level Expansion & Optimization
Addenda: 0
Release Date: 9/10/2025
Due Date: 11/5/2025
OverviewPost InformationPosted At:Wed, Sep 10, 2025 8:26 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:NoSummaryThe Project is intended to:
- Meet ticket counter growth requirements
- Provide an optimum level of service for airlines and passengers through sufficient queuing and circulation
- Explore and allow flexibility in implementing innovative technologies
- Coordinate with other ongoing major capital development projects, including the Airside D project and the Centralized Checked Baggage Security Screening project
- Relocate airlines on the ticket level as necessary to be aligned with the anticipated December 2028 opening of Airside D
The Project scope will be based on the recommendations from the PDD and will generally consider the scope elements outlined below:
- Renovate existing interior ticket level to include new flooring, ceilings, lighting, ticket counters, etc.
- Construct new baggage belts behind new ticket counters and reuse existing baggage induction points, where applicable
- Construct new baggage induction points, where applicable
- Construct baggage handling system modifications for interfaces with the ongoing Centralized Checked Baggage Security Screening project
- Replace curtain wall along curbside
- Relocate USO and information desk
- Incorporate technologies to enhance passenger flow such as LiDAR, etc.
- Incorporate self-service bag drop positions
- Evaluate and update existing wayfinding, as applicable
- Expand ticket level into the existing valet area
- Conduct curbside traffic analysis for changes to the curbside (including curbside bag check)
- Evaluate and repair existing building expansion joints
- Expand ticket level into the west quad deck for consolidating airline ticket offices, restrooms, and oversized baggage
- Explore the use of standardized counters, bag drop, re-pack desk, kiosks, and digital display screen options that will allow for easier moves and flexibility to accommodate new airlines in the future
- A complete evaluation of the HVAC system’s efficacy, considering both the new layout and existing deficiencies
- Design for improved line-of-sight and navigability for passengers as they traverse the ticketing level to different airline counters and/or common self-drop locations
- Verify the structural integrity of existing infrastructure at the tie-in and expansion locations
- Verify capacity and ability to reuse/tie into existing systems and infrastructure
- Conduct passenger processing and throughput simulations
- Conduct site verification of all major pre-existing condition assumptions during the design phase
- Other related Project elements as required
The self-service bag drop and baggage handling system vendors/manufacturers will be determined during the design phase of the Project. Respondents should not include any proposals, quotes, or information specific to self-service bag drop and baggage handling system vendors/manufacturers in their Response to this Solicitation.
The Respondent should not submit a schedule as part of their Response to this Solicitation. The design and construction schedule will be coordinated with the selected Respondent during negotiations of the Part 1 Contract.
BackgroundThe 2022 TPA Master Plan Update (MPU) identified operational deficiencies within the existing ticketing level consisting generally of a shortage of ticketing and bag drop positions, insufficient queuing depth, and insufficient passenger circulation width. The MPU recommended a concept to improve the ticketing level by expanding and optimizing to meet the growth requirements and to correct the operational deficiencies. The MPU was advanced pursuant to the attached Exhibit A, MTC Ticketing Area Expansion and Optimization Project Definition Document (PDD), July 30, 2025, which validated and refined the MPU concept through analysis of peer airports, review of industry trends, and an iterative refinement process with Authority and airline representatives.
TimelineSolicitation Posted:September 10, 2025Deadline for online Microsoft Teams attendance registration for the Mandatory Pre-Solicitation Conference:October 7, 2025, 5:00pmMandatory Pre-Solicitation Conference (Mandatory):October 8, 2025, 10:00amSkyCenter Boardroom, which is located on the fourth floor of the SkyCenter One Office Building at 5411 SkyCenter Dr, Tampa, FL 33607Request for Clarification Deadline:October 22, 2025, 5:00pmAddendum posted:October 29, 2025, 5:00pmNotice of Minimum Qualifications Meeting posted:October 29, 2025, 5:00pmDeadline for Submitting Solicitation responses:November 5, 2025, 2:00pmMinimum Qualifications Meeting:November 19, 2025, 10:00amNotice of Technical Evaluation Committee Meetings and Interviews posted:November 19, 2025, 5:00pmTechnical Evaluation Committee Meeting:December 15, 2025, 8:30amTechnical Evaluation Committee Meeting:December 16, 2025, 8:30amTechnical Evaluation Committee Meeting:December 17, 2025, 8:30amInterviews:December 18, 2025, 8:30amFinal Technical Evaluation Committee Meeting:December 19, 2025, 8:30amSelection by Authority’s Board:February 5, 2026, 9:00amSubmit Final Fee & Scope Proposal:March 5, 2026, 5:00pmContract presented to Authority’s Board for award:April 2, 2026, 9:00am
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
PVC PIPE AND FITTINGS, PURCHA...
Description: PVC PIPE AND FITTINGS, PURCHASE & DELIVERY OF Department: Procurement Buyer: Jonathan
Palm Beach County
Bid Due: 4/06/2031
PRE QUALIFICATION OF VENDORS-...
Description: PRE QUALIFICATION OF VENDORS-DUCTILE IRON-PIPE AND FITTINGS Department: Purchasing Buyer: David Juhe
Palm Beach County
Bid Due: 2/06/2028