Addendum #1 - McAuliffe School Bid #25-08, McAuliffe School Roofing Improvement Project
Project Information
- Bid Title
- Addendum #1 - McAuliffe School Bid #25-08, McAuliffe School Roofing Improvement Project
- Issuing Agency
- Oxnard School District
- Location
- California
- Published Date
- May 27, 2026
- Closing Date
- Jun 2, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid #25-08, McAuliffe School Roofing Improvement Project
- Attachment Preview
-
Wednesday, May 27, 2026ADDENDUM #1 – MCAULIFFE SCHOOLOXNARD SCHOOL DISTRICTBID #25–08, McAuliffe SCHOOL ROOFING IMPROVEMENT PROJECT 2026NOTICE TO ALL CONTRACTORS SUBMITTING BIDS FOR THIS WORK:You are hereby notified of the following changes, clarifications or modifications to the original ContractDocuments, Project Manual, Drawings, Specifications, and subsequent Addenda. This Addendum shallsupersede the original; Contract Documents, and previous Addenda wherein it contradicts the same and shalltake precedence over anything to the contrary therein. All other conditions remain unchanged.CHANGES AND/OR CLARIFICATIONS TO THE PROJECT MANUAL, CONTRACT DOCUMENTS, DRAWINGS ANDSPECIFICATIONS:CLARIFICATION/CHANGES/ADDITIONS TO THE PROJECT MANUAL:1. 1. Include in base bid a $40,000 allowance for damaged wood replacement at McAuliffe School.QUESTIONS AND ANSWERS:1. Page 10 of 17 Per 2.8 “Roof Insulation and Insulation Accessories” B. Roof Insulation c. is calling No insulationsize and 1/4” densdeck but on page 12 of 15 the spec’s is calling for 1” see D.2 can you please confirm will it be2.5” or 1”?A: Per the specification the total thickness of Polyiso insulation is 1”. Coverboard is 1/4”.2. Per 075416 page 10 of 15 2.9 Walkway Materials, we need a walkpad layout or liner feet so we all could bidapples to apples? See page 14 of 15 3.8 Walkway Installation calling to install walkpad at all rooftop units androof hatch with a walkway path from roof hatch to all roof tops (HVAC units) provide walk pad layout?A: 1. Per liner foot. Include in base bid 660LF of specified walkway roll installed.2. Yes, that is correct.3. At walls where there is wall panels there is no counterflashing do we install a skirt metal? With new insulationthe Base flashing at wall is going to be around 4" will that be acceptable?A: Yes, skirt metal is required where missing. Yes 4-6” base flashings have been approved.4. At existing duct supports has L brackets can you provide a detail, so we all bid apples to apples?A: See 3.7 Item C: Remove the newly installed HVAC Uni-Strut supports and flashings. Replace with approvedround or square tube supports or use a roofed-in sleeper detail in these areas.END OF ADDENDUM #1
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238160Roofing Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Southeast Water Pollution Con...
Bid Details RFP for DB-140 Southeast Water Pollution Control Plant - Secondary Clarifiers
San Francisco Public Utilities Commission
Bid Due: 8/05/2026
Project: TEC Modernization Addition Ref. #: 2026-1683 Type: ITB Status: Open Open Date:
Alameda-Contra Costa Transit District
Bid Due: 7/21/2026