25-013 Bonnie Brae Water Main Relocation and Replacement Project – Phase I
Project Information
- Bid Title
- 25-013 Bonnie Brae Water Main Relocation and Replacement Project – Phase I
- Issuing Agency
- Temple Terrace city
- Location
- Florida
- Published Date
- Dec 5, 2025
- Closing Date
- Dec 31, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 25-013
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 25-013
Bid Title: 25-013 Bonnie Brae Water Main Relocation and Replacement Project – Phase I
Category: 25-013 Bonnie Brae Water Main Relocation and Replacement Project – Phase I Status: Open Bid Recipient: City of Temple Terrace Purchasing Department purchasing@templeterrace.com Description: Relocate water lines from rear yard easements to public ROWs; install 3,500 LF of 6-inch C900 PVC on Glen Ridge, Park Ridge, Forest Park, and Deer Park; abandon 5,900 LF of old mains (grout-filled); relocate 55 services to new mains.
Submittal Info:
Sealed bids (proposals) received via email by the City of Temple Terrace Purchasing Department at For security reasons, you must enable JavaScript to view this E-mail address. until 2:30 PM EST, Nov 4, 2025.
Bid Opening Info:
Public opening (virtual) at 3:30 PM EST, Nov 25, 2025. GoTo link (from ad): https://meet.goto.com/CoTT-online-meeting/25-013virtualbid-bonniebraewatermainrelocationan Dial-in: +1 (224) 501-3412 | Access Code: 705-403-021
Pre-bid Meeting:
Non-mandatory Information Conference (virtual): 10:00 AM, Oct 16, 2025.
GoTo link (from ad): https://meet.goto.com/CoTT-online-meeting/25-013pre-bid-bonniebraewatermainrelocationandrepl
Dial-in: +1 (571) 317-3122 | Access Code: 286-395-517
Fee:
(No fee stated in the Advertisement for Bids; downloads via DemandStar/City website.)
Addendum Date:
TBD. Addenda will be issued via DemandStar and the City’s website per the Advertisement for Bids.
Publication Date/Time: 9/9/2025 12:00 AM Closing Date/Time: 12/31/2025 11:59 PM Submittal Information: Via email: purchasing@templeterrace.com until 2:30 PM EST, Nov 25, 2025 Bid Opening Information: Virtual at 3:30PM EST, Nov 25 Addendum Date/Time: TBD Contact Person: Purchasing Department purchasing@templeterrace.com (listed in the Advertisement for Bids as the submittal recipient) Download Available: Yes Fee: None Plan & Spec Available: Yes, available electronically via DemandStar and the City’s website. Plan Holders List: If obtained from the City website, you will not be listed on the plan holders list and may not receive addenda notifications; DemandStar tracks plan holders. Qualifications: Bidders must be certified/registered as a General Contractor or Underground Utility & Excavation Contractor under Chapter 489, F.S., continuously for =3 years prior to bid; submit copy of license. Prime must self-perform =51% of total contract value. Special Requirements: Bid security: = 5% of bid (certified check or bid bond).
Performance & payment bonds: 100% of Contract Price.
Contract time: 210 calendar days; LDs: $1,000/day after time expires.
Contractor registration: Must be registered with City Community Development; provide Florida DBPR contractor card prior to starting work.
Related Documents: COTT Bonnie Brae WM Replacement_PH 1 Specifications-9-5-2025
Bonnie Brae WM Replacement_PH 1 Bid Set 9-8-25 Drawings
ADDENDUM No. 1 Bonnie Brae Water Main
ADDENDUM No. 2
ADDENDUM No. 3
ADDENDUM No.4 Bidders Questions
Revised Addendum No. 4 Closing Line Correction
ADD No. 5 -BONNIE BRAE WATER MAIN RELOCATION BID READING NOTICE
- Attachment Preview
-
CITY OF TEMPLE TERRACEBID # 25-013BONNIE BRAE WATER MAINRELOCATION AND REPLACEMENT PROJECT – PHASE IHILLSBOROUGH COUNTY, FLORIDAAugust 20255601 Mariner StreetSuite 105Tampa, FL 33609Ph. 813.288.0233THIS PAGE INTENTIONALLY LEFT BLANKBid #25-013August 2025CONTRACT DOCUMENTSForBONNIE BRAE WATER MAINRELOCATION AND REPLACEMENT PEOJECTPHASE IForCITY OF TEMPLE TERRACETEMPLE TERRACE, FLORIDAPrepared by:CPH CONSULTING LLC.TAMPA, FLORIDAINDEXTOPROJECT MANUALCITY of TEMPLE TERRACEBid #25-013BONNIE BRAE WATER MAINRELOCATION AND REPLACEMENT PROJECTPHASE ICPH Project No. T13010August 2025DIVISION 0 - BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OFTHE CONTRACTSECTION A – ADVERTISEMENT FOR BID..............................................................................................................A-1SECTION B – INSTRUCTION TO BIDDERS ........................................................................................................... B-1B-1: Delivery of Proposals...............................................................................................................................................B-1B-2: Proposal Forms .......................................................................................................................................................B-1B-3: Irregular Proposals ..................................................................................................................................................B-1B-4: Signature on Proposals.............................................................................................................................................B-2B-5: Examination of Contract Documents ......................................................................................................................B-2B-6: Examination of Site ................................................................................................................................................B-2B-7: Discrepancies...........................................................................................................................................................B-3B-8: Interpretation of Plans..............................................................................................................................................B-3B-9: Interpretation of Plans and Contract Documents Prior to Opening of Bids.............................................................B-3B-10: Time of Completion & Liquidated Damages.........................................................................................................B-3B-11: Labor Regulations .................................................................................................................................................B-4B-12: Certified Check or Bid Bond.................................................................................................................................B-4B-13: Return of Certified Checks....................................................................................................................................B-4B-14: Contract Bond or Performance Bond.....................................................................................................................B-4B-15: Qualification of Bidders ........................................................................................................................................B-5B-16: Disqualification of Bidders....................................................................................................................................B-5B-17: Equipment and Subcontractors..............................................................................................................................B-5B-18: Withdrawal of Proposal.........................................................................................................................................B-6B-19: Owner's Rights Reserved ......................................................................................................................................B-6B-20: Public Entity Crime Statement...............................................................................................................................B-6SECTION C – GENERAL CONDITIONSC-1C-1: DefinitionsC-1C-2: Award, Execution of Documents, Delivery of Bonds, etc.C-2C-3: Progress and Submission Schedules; Preconstruction Conference; Time of Starting the WorkC-3C-4: Correlation, Interpretation and Intent of Contract DocumentsC-3C-5: Ownership and Copies of Documents; Record DocumentsC-4C-6: Work by OthersC-4C-7: SubcontractsC-5C-8: Materials, Equipment and Labor Substitute Material or EquipmentC-6C-9: Patent Fees and RoyaltiesC-7C-10: Permits, Laws, Taxes and Regulations.................................................................................................................C-7C-11: Availability of Lands; Physical and Subsurface Conditions; Reference Points................................................... C-7C-12: Use of Premises ........................................................................................................... ......................................... C-8C-13: Engineer's Status During Construction ................................................................................................................ C-9C-14: Engineer's Interpretations and Decisions ............................................................................................................. C-9C-15: Shop Drawings and Samples .............................................................................................................................. C-10C-16: Tests and Inspections ......................................................................................................................................... C-11C-17: Contractor's Supervision & Superintendence .................................................................................................... C-11C-18: Safety & Protection: Emergencies ..................................................................................................................... C-12C-19: Access to the Work/Uncovering Finished Work ............................................................................................... C-13C-20: Changes in the Work .......................................................................................................................................... C-14C-21: Changes of Contract Price .................................................................................................................................. C-14C-22: Cash Allowances ......................................................................................................... ....................................... C-15C-23: Change of the Contract Time ............................................................................................................................. C-16C-24: Neglected Work.................................................................................................................................................. C-16C-25: Warranty & Guarantee: Correction, Removal or Acceptance of Defective Work ............................................ C-16C-26: Applications for Progress Payments .................................................................................................................. C-17C-27: Approval of Payments ........................................................................................................................................ C-18C-28: Substantial Completion ...................................................................................................................................... C-19C-29: Partial Utilization ............................................................................................................................................... C-19C-30: Final Payment ........................................................................................................... ......................................... C-20C-31: Waiver of Claims & Continuing Obligations .................................................................................................... C-21C-32: Indemnification .................................................................................................................................................. C-21C-33: Contract Bonds ............................................................................................................ ....................................... C-22C-34: Contractor's Liability Insurance ......................................................................................................................... C-22C-35: Owner's Indemnity ............................................................................................................................................. C-23C-36: Property Insurance ............................................................................................................................................. C-23C-37: Cleaning Up .............................................................................................................. ......................................... C-23C-38: Owner's Right to Stop or Suspend Work ........................................................................................................... C-23C-39: Owner's Right to Terminate................................................................................................................................ C-24C-40: Contractor's Right to Stop Work or Terminate .................................................................................................. C-24C-41: Dispute Resolution.............................................................................................................................................. C-25C-42: Miscellaneous ..................................................................................................................................................... C-25C-43: Builder's Risk ..................................................................................................................................................... C-25C-44: Overtime Work .................................................................................................................................................. C-26SECTION C-C – SUPPLEMENTARY GENERAL CONDITIONS ........................................................ C-27 TO C-28SECTION D – FEDERAL FUNDING – NOT INCLUDEDSECTION E – BID (PROPOSAL) ..................................................................................................................E-1 TO E-14SECTION F – BID BOND ................................................................................................................................. F-1 TO F-2SECTION G – CONTRACT ............................................................................................................................ G-1 TO G-2SECTION H – CONTRACT BOND ................................................................................................................ H-1 TO H-2SECTION I – BID PROTEST ............................................................................................................................. I-1 TO I-2SECTION SC – SPECIAL CONDITIONS ................................................................................................................. SC-1Standard Specifications ............................................................................................................................................... SC-1Construction Staking ................................................................................................................................................... SC-1Materials...................................................................................................................................................................... SC-1Laboratory Testing ...................................................................................................................................................... SC-1Measurement and Payment ......................................................................................................................................... SC-1
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Orange County Corrections Dep...
Project ID: Y25-790-RC Title: Orange County Corrections Department Female Detention Center Two Cell
Orange County
Bid Due: 7/14/2026
Project: Deerfield Island ADA Dock Ref. #: PNC2132293C1 Department: FASD - Purchasing Type:
Broward County
Bid Due: 7/15/2026