Deferred Maintenance FY2021-22 - NRB Addendum 1
Project Information
- Bid Title
- Deferred Maintenance FY2021-22 - NRB Addendum 1
- Issuing Agency
- UCLA Capital Programs
- Location
- California
- Published Date
- Jun 23, 2026
- Closing Date
- Jul 21, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 942418.01
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project Name Deferred Maintenance FY2021-22 - NRB (opens in new tab, PDF) Project Number 942418.01 Project Description Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract from prequalified bidders are invited for the following work:
This project will replace the obsolete Building Automation Controls and bladder-actuated Variable Air Volume (VAV) boxes in the Neuroscience Research Building (NRB), as identified by an Integrated Capital Asset Management Program (ICAMP) facility condition assessment. The replacements would increase overall building efficiency, reduce future maintenance costs, and bring the systems into compliance with current building codes. The NRB is a six-story facility, including a basement, totaling 130,887 gsf (80,259 asf), constructed in 2004. The building houses a vivarium, as well as wet and dry labs designed to accommodate a wide range of research needs for the Department of Neurobiology and the Brain Research Institute, focusing on how the brain develops, functions, and is affected by disease. The proposed scope of work includes renovating the existing lab spaces with updated air valves for air supply and exhaust, re-adjusting deferred maintenance items related to airflow levels, reconnecting the valves to the existing control system, and testing and balancing for the air and water systems. No modifications would be made to the existing life safety, smoke control, or fire alarm sequencing, control devices, or signals. Any additional control architecture and devices added in parallel would support only non-critical equipment and operations. Hazardous materials abatement shall be required in survey identified areas containing lead paint if areas disturbed. The estimated construction cost is $6,105,294.
TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOMEstimated Construction Cost $6,105,294.00 - Attachment Preview
- To access this preview, please sign up here.
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Hydroseed ? Request for Quotes
Hydroseed - Request for Quotes Project Description The Tuolumne Utilities District (TUD) is
Tuolumne Utilities District
Bid Due: 8/24/2026
RFQ - SUPPRESSOR AND FLASH HI...
RFx Name: BPM013340 RFx Begin Date (UTC+0): RFQ - SUPPRESSOR AND FLASH HIDERS
County of San Diego
Bid Due: 8/28/2026