Wastewater System Capacity Improvements Project
Project Information
- Bid Title
- Wastewater System Capacity Improvements Project
- Issuing Agency
- City of St. Helens
- Location
- Oregon
- Published Date
- Apr 15, 2026
- Closing Date
- May 12, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Wastewater System Capacity Improvements ProjectBid/RFP Status:Open - accepting bids and proposalsBid/RFP Due Date:Tuesday, May 12, 2026 - 1:00pmBack to Bids/RFPsBid/RFP Reference Number:S-679
The Wastewater Capacity Improvements Project consists of the construction and replacement of sanitary sewer infrastructure within Basins 4 and 6 in the City of St. Helens. The project is intended to increase system capacity, improve reliability, and address existing conveyance deficiencies in key portions of the collection system.
Work includes installation of approximately 12,449 linear feet of new sanitary sewer pipe of varying diameters, including 10-inch, 12-inch, 15-inch, 18-inch, 24-inch, 27-inch, and 28-inch pipe. Pipe materials include PVC and HDPE. Portions of the work will be constructed using trenchless methods, including installation of the 24-inch PVC pipeline and approximately 1,564 linear feet of 28-inch HDPE pipe. The project also includes a trenchless crossing beneath an active railroad.
Additional improvements include rechanneling 18 existing manholes and installation of 49 new manholes. Associated utility and surface restoration work includes approximately 150 linear feet of water line relocation, 383 linear feet of storm drainage pipe replacement, trench backfill, asphalt paving, sewer system testing, and restoration of disturbed landscaping and surface features.
A portion of the work occurs within the U.S. Route 30 right-of-way and will require coordination with and inspection by the Oregon Department of Transportation.
This project is funded in part through the Clean Water State Revolving Fund (CWSRF). As such, the Contract Documents include federally required provisions. Contractors shall comply with all applicable CWSRF requirements, including but not limited to federal labor standards (including Davis-Bacon wage requirements), American Iron and Steel (AIS) provisions, and applicable environmental and reporting requirements.
A Mandatory Pre-Bid Conference will be held in the Columbia Room at the City of St. Helens City Hall at 265 Strand Street, St. Helens, Oregon 97051 on April 29, 2026, 2:00 PM to provide prospective bidders with the opportunity to visit the site and ask questions relating to bidding or constructing the work under this Contract.
Bids are due and will be publicly opened and read at 1:00 P.M. Tuesday, May 12, 2026 in the Columbia Room at the City of St. Helens City Hall at 265 Strand Street, St. Helens, Oregon 97051.
Project costs are estimated between $22 million and $24 million.
Project Contacts:Consor: Bart Stepp, PE, Project Manager, (503) 714-3187, bart.stepp@consoreng.com
City of St. Helens: Sharon Darroux, PMP, Engineering Manager,(503) 366-8243, sdarroux@sthelensoregon.govSupporting Documents - Attachment Preview
-
PROJECT BID DOCUMENTSWASTEWATER SYSTEM CAPACITYIMPROVEMENTS BASINS 4 AND 6PROJECT NO. S-679Bid DocumentsBIDS DUE: 1:00 PM May 12, 2026City of St. Helens City Hall, 265 Strand Street, St. Helens, Oregon 97051City of St. Helens265 Strand StreetSt. Helens, Oregon 97051(503) 397-6272Consor1 SW Columbia, Suite 1700Portland, OR 97204(503)-225-9010PROJECT RELEASE DATE: April 15, 2026BID DOCUMENTSFORWASTEWATER SYSTEM CAPACITY IMPROVEMENTS BASINS 4 AND 6PROJECT NO. S-679CITY OF ST. HELENSPUBLIC WORKS DEPARTMENTENGINEERING DIVISION265 STRAND STREETST. HELENS, OREGON, 97051(503) 397-6272April 2026INTRODUCTION AND TABLE OF CONTENTSContract Documents are listed below. Documents are either attached or bound separately and available fromthe Project Manager. All documents bound separately are incorporated into the Contract Documents andhave the same force and effect as though set forth in full herein.NOTICE TO CONTRACTORS / INVITATION TO BID ..............................................................................................................................................5PART 1 - BID DOCUMENTS ........................................................................................................................................................................ 9FIRM OFFER (BID) AND SCHEDULE OF PRICES .....................................................................................................................................................9FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM ......................................................................................................................................... 18FIRST TIER SUBCONTRACTORS ................................................................................................................................................................................. 19BID BOND SURETY............................................................................................................................................................................................................ 20STATEMENT OF QUALIFICATIONS...................................................................................................................................................................... 21PART 2 - CONTRACT DOCUMENTS ...................................................................................................................................................... 23STANDARD PUBLIC IMPROVEMENT CONTRACT ............................................................................................................................................... 241. Effective Date and Duration ........................................................................................................................................................................ 242. Statement of Work........................................................................................................................................................................................... 243. Consideration..................................................................................................................................................................................................... 24CONTRACTOR DATA, CERTIFICATION, AND SIGNATURE.............................................................................................................................. 25STANDARD TERMS AND CONDITIONS FOR PUBLIC IMPROVEMENT CONTRACTS........................................................................... 261. Contractor is Independent Contractor ................................................................................................................................................... 262. Subcontracts and Assignment .................................................................................................................................................................... 263. No Third Party Beneficiaries....................................................................................................................................................................... 264. Successors in Interest..................................................................................................................................................................................... 265. Contract Documents ....................................................................................................................................................................................... 266. Contractor’s Representations ..................................................................................................................................................................... 277. Drug Testing ....................................................................................................................................................................................................... 278. Notice to Proceed ............................................................................................................................................................................................. 279. Suspension of the Work ................................................................................................................................................................................ 2710. Early Termination ...................................................................................................................................................................................... 2711. Payment on Early Termination............................................................................................................................................................ 2812. Remedies for Default ................................................................................................................................................................................ 2813. Access to Records....................................................................................................................................................................................... 2814. Ownership of Work Product.................................................................................................................................................................. 2815. Compliance with Applicable Law ........................................................................................................................................................ 2916. Licensing with Construction Contractor’s Board......................................................................................................................... 3217. Prevailing Wages ........................................................................................................................................................................................ 3218. Change Orders/Extra Work................................................................................................................................................................... 3319. Inspection and Acceptance .................................................................................................................................................................... 3320. Liquidated Damages.................................................................................................................................................................................. 3321. Liability, Indemnity and Hold Harmless .......................................................................................................................................... 3322. Insurance ....................................................................................................................................................................................................... 3423. Bonds / Notice of Bond Claims............................................................................................................................................................. 3424. Two-Year Warranty .................................................................................................................................................................................. 3525. Nondiscrimination in Labor .................................................................................................................................................................. 3526. Environmental Regulations ................................................................................................................................................................... 3527. Waiver ............................................................................................................................................................................................................. 3728. Errors............................................................................................................................................................................................................... 3729. Governing Law............................................................................................................................................................................................. 3730. Severability ................................................................................................................................................................................................... 3731. Attorney’s Fees............................................................................................................................................................................................ 3732. Business License......................................................................................................................................................................................... 3733. Notices/Bills/Payments .......................................................................................................................................................................... 3734. Conflict of Interest ..................................................................................................................................................................................... 3835. Merger Clause .............................................................................................................................................................................................. 38EXHIBITS A – JEXHIBIT AEXHIBIT BEXHIBIT CEXHIBIT DEXHIBIT EEXHIBIT FEXHIBIT GEXHIBIT HEXHIBIT IEXHIBIT JSTATEMENT OF WORK, COMPENSATION, AND PAYMENT SCHEDULEPUBLIC IMPROVEMENT CONTRACT INSURANCE REQUIREMENTSCERTIFICATION STATEMENT FOR CORPORATION OR INDEPENDENT CONTRACTORBONDS (PAYMENT AND PERFORMANCE)CERTIFICATE OF SUBSTANTIAL COMPLETIONCERTIFICATE OF COMPLIANCECONTRACTOR’S RELEASE OF LIENS AND CLAIMSCERTIFICATE OF FINAL COMPLETIONINSTRUCTIONS TO BIDDERSOREGON PREVAILING WAGE RATESPART 3: 2024 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION……………………………………………………………………………………………………………………………….……. Available OnlinePART 4: CITY OF ST. HELENS ENGINEERING STANDARDS MANUAL………………………………………………………..……………………………………………………….…...………...…… Available OnlineIn the event of a conflict, Supplementary Conditions control over all Standard Specifications and otherContract Documents. To the extent Standard Specifications and other Contract Documents conflict, the morerestrictive requirement or provision shall control, except where otherwise noted in the Contract Documents,addenda, or amendment.PART 5: SPECIAL PROVISIONS & TECHNICAL SPECIFICATIONS……………………………………………………………………………………………. See Technical Specifications Table of ContentsPART 6: SUPPLEMENTARY INFORMATION ........………………………………………….………. Separately Bound1- Oregon DEQ 1200-C Permit2- Geotechnical Report3- ODOT Hwy 30 As-Built Plan (26V-92)4- Inadvertent Discovery Plan5- US Army Corp of Engineers NWP 586- Oregon DEQ 401 Water Quality Certification Approval7- ODOT Permit to Perform Operations8- SERP Basin 4 Wetland Compliance Memorandum9- SERP Floodplain Compliance Memorandum10- SERP Federal Cross-Cutting Memorandum11- Oregon DSL Basin 6 Wetland Impact and Wetland Delineation Approval12- Clean Water State Revolving Fund Documents13- Railroad Access Permit (to follow)14- Bidders Checklist15- Project Documentation Checklist16- Construction Door Hanger Notice ExamplePART 7: CONSTRUCTION DRAWINGS……………………………………………………………………...……………………………………………………….………. Separately BoundNOTICE TO CONTRACTORS / INVITATION TO BIDCITY OF ST. HELENS ENGINEERING DIVISIONWASTEWATER SYSTEM CAPACITY IMPROVEMENTS BASINS 4 AND 6, PROJECT NO. S-679Notice is hereby given that Sealed Bids for furnishing all materials, equipment, labor, and services for theWASTEWATER SYSTEM CAPACITY IMPROVEMENTS BASINS 4 AND 6, Project No. S-679 for the City of St. Helens(City) will be accepted by the City Administrator at St. Helens City Hall, 265 Strand Street, St. Helens, Oregon until 1:00pm May 12, 2026. All bids received on or before this date and time and in proper form will be publicly opened andread in the City Hall Council Chambers at the time set forth above as the deadline for receipt of bids, and thereafter biddocuments, shall be made available for public inspection. Bids received after this date and time will not be considered.First-tier Subcontracting Disclosure forms, per the instructions to bidders, are due within two (2) working hours afterthe bid submission deadline.Prequalification of Contractors and/or Subcontractors is is not required.A Mandatory Pre-Bid Conference will be held in the Columbia Room at the City of St. Helens City Hall at 265 StrandStreet, St. Helens, Oregon 97051 on April 29, 2026, at 2:00 PM to provide prospective bidders with the opportunity tovisit the site and ask questions relating to bidding or constructing the work under this Contract. If deemed appropriateby the Engineer, questions that cannot be addressed by direct reference to the bidding documents will be the subject ofan addendum issued to all plan holdersThe General Character of the Work under this Contract is for the: The project consists of construction of newsanitary sewer pipe or sanitary sewer pipe replacement in Basins 4 and 6 in St. Helens, Oregon. The lengths of newsewer pipe are 33 feet of 10-inch PVC, 3,098 feet of 12-inch PVC, 1,340 feet of 15-inch PVC, 1,822 feet of 18-inch PVC,1,443 feet of 24-inch PVC, 2,629 feet of 27-inch PVC, and 2,084 feet of 28-inch HDPE Pipe. The 24-inch PVC pipe and1,564 feet of the 28-inch HDPE sewer pipe will be completed using a trenchless method. This includes one boring undera railroad. Associated work includes rechanneling 18 existing manholes and installing 49 new manholes, 150 feet ofwater line relocation, 383 feet of storm pipe replacement, backfill and asphalt paving of trenches, sewer testing, andrestoration of landscaping and structures within the sewer improvement area. Work includes new sewer pipe withinHighway 30 right-of-way requiring coordination and inspection with Oregon Department of Transportation (ODOT).The Solicitation Schedule And Deadlines Are Generally As Follows:Mandatory Pre-Bid Conference: 2:00 PM, April 29, 2026BID SUBMISSION DEADLINE/BID OPENING:_ 1:00 PM, May 12, 2026Anticipated Notice of Intent to Award:_ May 13, 2026Final Completion:_ 740 Calendar DaysContract Documents, including plans and specifications, may be examined after 1:00 pm Wednesday, April 15, 2026, atthe following offices:City of St. Helens City Hall265 Strand Street, St. Helens, OR 97051503-397-6272Plan Center NorthwestPO Box 2486, Clackamas, OR 97015503-650-0148Daily Journal of Commercewww.djcoregon.com503-274-0624SW Washington Contractors Association 7017 NE Hwy. 99, Suite #214, Vancouver, WA 98665 360-694-7922Premier Builders Exchange1902 NE 4th Street, Bend, OR 97701541-389-0123Salem Contractors Exchange Plan Center 2256 Judson St. SE, P.O. Box 12065, Salem, OR 97309 503-362-7957Seattle Daily Journal of Commercewww.plancenter.com206-219-6481Copies of Contract Documents, including plans and specifications may be obtained on or after 1:00 PM on April 15, 2026by special order at St. Helens City Hall 265 Strand St, St. Helens, OR for a nonrefundable fee of two hundred and seventydollars ($270.00) per set. If ordered by mail, add a one hundred and fifty dollar ($150.00) processing and mailingcharge. Plans may also be downloaded at no cost on the City’s website at https://www.sthelensoregon.gov/rfps.Bids shall only be considered valid if Bidder is included on the City’s Official Plan Holder List. The purchase ofproject Plans and Specifications from the City will place the Bidder on the Official Plan Holder List. Bidders whodownload project Plans and Specifications or acquire them from a from a plan center must contact the City at (503)397-6272 and request to be placed on the Official Plan Holder List for a nonrefundable fee of ten dollars ($10.00).City of St. Helens, Oregon | Public Improvement Contract | Project No S-679Page 5
- Commodity Codes
-
- NAICS 541330Engineering Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Big Creek Dams Seismic Remedi...
Bid Solicitation # S-KN0010-00017111 Bid Solicitation # S-KN0010-00017111 Organization Name City of Newport
State Government of Oregon
Bid Due: 7/07/2026
Request For Proposals Aquifer...
Request For Proposals Aquifer Storage and Recovery (ASR) Design and Permitting Study Bid/RFP
Silverton city
Bid Due: 7/21/2026