Chesnut Park Managed Aquifer Recharge Well Drilling And Completion Of Subsurface Testing

Project Information

Bid Title
Chesnut Park Managed Aquifer Recharge Well Drilling And Completion Of Subsurface Testing
Issuing Agency
Pinellas County
Location
Florida
Published Date
Nov 3, 2025
Closing Date
Nov 13, 2025
Government Level
State & Local
Status
Closed
Ref. #
26-0046-ITB-C
Original Source
Join to Access Full Details
Project Description


Project ID: 26-0046-ITB-C

Title: Chesnut Park Managed Aquifer Recharge Well Drilling And Completion Of Subsurface Testing

Addenda: 0

Release Date: 11/3/2025

Due Date: 11/13/2025

Post Information
Posted At:Mon, Nov 3, 2025 8:37 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

The MAR test well (MAR-1) is proposed to be completed with 24-inch steel casing to approximately 600 feet below land surface (bls) and an open hole up to approximately 1,250 feet bls into the Avon Park Formation which will utilize the highly permeable unit described as the Avon Park high-permeability zone (APHPZ). The proposed monitoring system includes the existing monitoring wells completed into the overlying Suwannee Limestone permeable zone. These wells are storage zone monitor wells (SZMW) for the Chesnut ASR system and are therefore designated as SZMW-1 and SZMW-2. SZMW-2 will be within 150 feet of the MAR well and SZMW-1 will represent the approximate property boundary of the site which is owned by the County. One nominal 6-inch diameter monitor well designated MW-1. The well will be completed with polyvinyl chloride (PVC) casing to approximately 400 feet bls and open hole to approximately 430 feet bls to monitor the permeable unit above the bottom of the USDW. This well will only be constructed if required by FDEP and will be determined based on the hydrogeologic conditions encountered during the drilling of MAR-1.

Background

Pinellas County Utilities (PCU) has historically sought to better serve our customers through innovative solutions to complex challenges. In 2007 PCU completed the construction of the ASR well in Chesnut Park, but that project was put on hold due to the economic downturn in 2008. In 2019, PCU completed a Feasibility Study to evaluate different solutions to the shortage of supplies of Reclaimed Water. The ASR well combined with the completed MAR well will recharge the upper Floridan aquifer with excess surface water from Lake Tarpon that otherwise would be discharged to upper Tampa Bay. The environmental benefits of this project include: 1) increased water levels in the upper Floridan aquifer within the Northern Tampa Bay Water Use Caution Area; 2) freshening of the deep aquifer underlying the wellfields in the area; and 3) mitigation of salt water intrusion by creation of a fresh water bubble / barrier within and under the USDW.

Timeline
Issue Date:
November 3, 2025
Site Visit / Pre-Conference Information (Mandatory):
November 5, 2025, 10:00am
John Chesnut Sr. Park is 2200 East Lake Road, Palm Harbor,
Meet in the open grassy area just south of the bridge spanning Brooker Creek. See attached site Map under Agenda.
Step 1 Question Submission Deadline:
November 7, 2025, 3:00pm
Step 1 Bid Submission Deadline:
November 13, 2025, 3:00pm
Step 2 Bid Submission Deadline:
December 4, 2025, 3:00pm
Commodity Codes
  • NAICS 237110Water and Sewer Line and Related Structures Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

PRE-QUAL OF VENDORS/STRIPING,...

Description: PRE-QUAL OF VENDORS/STRIPING, MARKING & WAY FINDING SIGNAGE Department: Purchasing Buyer: Janice

Palm Beach County

Bid Due: 10/02/2028

Districtwide Cultural Resourc...

Advertisement Detail Department of Transportation Informational Notice Districtwide Cultural Resources Assessment and National

State Government of Florida

Bid Due: 10/11/2040