2024 DRAINAGE IMPROVEMENTS
Project Information
- Bid Title
- 2024 DRAINAGE IMPROVEMENTS
- Issuing Agency
- City of Seattle
- Location
- Washington
- Published Date
- Mar 26, 2025
- Closing Date
- Apr 16, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- PW#2023-016
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID: PW#2023-016
Title: 2024 DRAINAGE IMPROVEMENTS
Addenda: 0
Release Date: 3/26/2025
Due Date: 4/16/2025
OverviewPost InformationPosted At:Wed, Mar 26, 2025 6:00 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:NoSummaryProject Description:
The purpose of the Work at the Broadview Site is to provide water quality treatment for street runoff by installing bioretention systems. This portion of the Project consists of the following elements of Work including but not limited to: construction stormwater erosion control ( submittal, implementation, and maintenance of the Construction Stormwater Pollution Prevention plans (CSECP/SWPPP, TVSPP, SP, & TDP)) ; health and safety plan; clearing and grubbing; demolition and removal of existing surface pavement, sidewalks, and curbs; potholing; excavation; temporary traffic control plan and implementation, including flagging; site preparation and staging; survey; removal and abandoning of existing drainage structures and piping; temporary stormwater bypass; protection, relocation, and/or adjustments of existing utilities, including water services; reconnection to the existing drainage system; installation of new drainage systems, including storm drainage piping, drainage structures, bioretention cells, and flow splitters; flow testing; install gate valves and assist SPU crews with water service and meter box relocations/adjustment; television inspections; side sewer reconnections; and final site restoration, including surface paving, pavement markings, permanent signing and posts, sidewalks, curbs, driveways, curb ramps, planting, and landscape establishment.
The purpose of the Work at the Sylvan Site is to provide water quality treatment for street runoff that drains to Longfellow Creek by retrofitting the roadside with bioretention treatment system. This portion of the Project consists of the following elements of Work including but not limited to: construction stormwater erosion control (submittal, implementation, and maintenance of the Construction Stormwater Pollution Prevention plans (CSECP/SWPPP, TVSPP, SP, and TDP)); health and safety plan; clearing and grubbing; demolition and removal of existing surface pavement and curbs; potholing; excavation; temporary traffic control plan and implementation, including flagging; site preparation and staging; survey; removal and abandoning existing drainage structures and piping; well decommissioning; temporary shoring and dewatering; temporary stormwater bypass; protection, relocation, and/or adjustments of existing utilities; reconnection to the existing drainage system; installation of new surface drainage systems, including: storm drainage piping, drainage structures, and bioretention cell; gutter flow testing; television inspections; and final site restoration, including: surface paving, curbs, soil amendments, planting, landscaping and establishment.
The purpose of the Work at the NE 137 th Headwall site is to improve debris collection as well as to reduce erosion and sedimentation that threatens the roadway embankment, neighboring properties, and fish habitat. This portion of the Project consists of the following elements of Work including but not limited to: construction stormwater erosion control (submittal, implementation, and maintenance of the Construction Stormwater Pollution Prevention plans (CSECP, TVSPP, SP, and TDP)); health and safety plan; clearing and grubbing; potholing; excavation; temporary traffic control plan and implementation including flagging; site preparation and staging; survey; temporary stream bypass; installation of a steel soldier pile headwall with concrete panels and a new trashrack at the upstream end a 36-inch-diameter concrete culvert beneath the roadway; removal and re-installation of existing guardrail as necessary to do the work; new guardrail; and site restoration and planting.
Engineer's Estimate: $3,737,500
Project Location: This Project is located at 3 distinct sites within the City of Seattle:
- The Broadview Site includes 2 locations in the Broadview neighborhood: 1) Along NW 130th St between 1st Ave NW and 3rd Ave NW and 2) Along NW 127th Street from 3rd Ave NW and then south along 1st Ave NW.
- The Sylvan Site is located at the Sylvan Way SW and SW Orchard St intersection which is within the Longfellow Creek basin.
- The NE 137 th St Culvert Headwall Site is located on NE 137 th Street between 30 th Ave NE and 32 nd Ave NE.
TimelineRelease Project Date:March 26, 2025Pre-Bid Meeting #1 (Bidders must attend 1 of the mandatory virtual pre-bid meetings):April 2, 2025, 10:00amVirtual. WebEx meeting log-in instructions to be posted by March 28Pre-Bid Meeting #2 (Bidders must attend 1 of the mandatory virtual pre-bid meetings):April 3, 2025, 10:00amVirtual. WebEx meeting log-in instructions to be posted by March 28Question Submission Deadline:April 10, 2025, 5:00pmBid Open Date:April 16, 2025, 2:00pm - Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
- NAICS 238910Site Preparation Contractors
- NAICS 238990All Other Specialty Trade Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
BID - SVC - Old Main Sewer Re...
Project: BID - SVC - Old Main Sewer Replacement - Skagit Valley College
State Government of Washington
Bid Due: 7/23/2026
BID - SVC - MV Campus - Aspha...
Project: BID - SVC - MV Campus - Asphalt Repair and Re-striping -
State Government of Washington
Bid Due: 7/09/2026