Santa Fe River Repair at Cristobal Colon
Project Information
- Bid Title
- Santa Fe River Repair at Cristobal Colon
- Issuing Agency
- City of Santa Fe
- Location
- New Mexico
- Published Date
- Mar 22, 2026
- Closing Date
- Mar 30, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: Santa Fe River Repair at Cristobal Colon
Addenda: 3
Release Date: 3/11/2026
Due Date: 3/30/2026
Santa Fe River Repair at Cristobal ColonFollowLast updated by Addendum #3 on Mar 21, 2026 6:30 AM See what changedInvitation to BidParks, Trails, & Watershed90900 , 91200 , 91223 , 91300 , 91400 ... show allProject ID: FY26-Const. ITB-075Release Date: Wednesday, March 11, 2026ยท Due Date: Monday, March 30, 2026 1:55pmPosted Wednesday, March 11, 2026 8:00amAll dates & times in Mountain TimeDraft Response Events RSVP No Bid7 days, 18 hours, 43 minutesOverview
Post Information
Posted At:Wed, Mar 11, 2026 8:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryThis project involves the repair of five (5) existing A-weir cross-vane grade control structures along the Santa Fe River, between approximately Camino Rio and Camino de la Vuelta. The work will include reconstruction of the failed structures as grouted boulder ramps featuring integrated stilling basins, cutoff sills, and subsurface drain tiles to mitigate erosion and seepage risks.
Following construction, all disturbed areas will be revegetated to restore natural conditions and enhance riparian. The proposed design re-establishes channel grade, improves floodplain connectivity, and promotes long-term structural stability while minimizing environmental disturbance and construction impacts.
BackgroundIn 2018, the Santa Fe area experienced an extreme precipitation event that caused widespread damage throughout the Santa Fe River corridor, including significant failure of several grade control structures. This project builds upon prior work to repair the riparian corridor using more robust designs to help mitigate against future risks.
The purpose of this project is to re-establish channel grade stability by repairing five A-weir boulder cross vane grade control structures located between Camino de la Vuelta and Camino Rio. The design incorporates salvaged boulders from the failed structures and reconstructs them as more resilient, grouted grade control features. The use of grouting will enhance structural integrity and reduce the risk of erosion and future failure during high-flow events.
Timeline
Issue ITB:March 11, 2026Pre-Bid Conference (Mandatory):March 16, 2026, 1:00pmJohn Griego Vietnam Veterans Memorial Park - 1610 Paseo de la Conquistadora, Santa Fe, NM 87501Deadline for Pre-Bid Questions:March 20, 2026, 5:00pmResponse to Pre-Bid Questions:March 23, 2026, 5:00pmElectronic Bid Submittal Deadline:March 30, 2026, 1:55pmBid Opening Date, Time and Link (Non-Mandatory): - Commodity Codes
-
- NAICS 237990Other Heavy and Civil Engineering Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
800092182-International Busin...
800092182-International Business Machines Corp-Sole Source Pre-Award 800092182-International Business Machines Corp-Sole Source Pre-Award Open:
New Mexico State University
Bid Due: 7/08/2026
BITUMINOUS SURFACE TREATMENT ...
Interested offerors should pay special attention to the scheduled pre-proposal conference portion in
State Government of New Mexico
Bid Due: 7/09/2026