25-U-001 24" Sewer Main Replacement, Phase II

Project Information

Bid Title
25-U-001 24" Sewer Main Replacement, Phase II
Issuing Agency
City of Bullhead City
Location
Arizona
Published Date
Oct 25, 2024
Closing Date
Nov 19, 2024
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description
25-U-001 24" Sewer Main Replacement, Phase II
  • Department: Utilities
  • Start Date: 10/25/2024 8:00 AM
  • Close Date: 11/19/2024 3:00 PM

This project consists of the removal and replacement of up to 160 feet of 24-inch sewer main located on the east side of Highway 95 North of Merrill Ave and South of Rio Rancho Blvd. The existing sewer main was constructed of 24-inch HDPE and shall be replaced with 24-inch SDR35 PVC.

This section of sewer main has been crushed due to infiltration of dirt and rock between the 36-inch ADS sleeve and the 24-inch HDPE. An emergency replacement project was initiated in December 2023 which replaced approximately 103 feet of pipe. A temporary connection was made using a concrete encasement to prevent any sewage loss, and to prevent any further damage to the existing main. This concrete encasement is located approximately 103 feet south of MH-15921 and must be removed to make connection to the existing SDR35 PVC. The pipe replacement for this project will continue from this point to the south, up to 160 feet in length. The end point of this replacement will be determined by the Bullhead City Utilities Department Project Manager.

Before starting the replacement of this pipeline, bypass pumping must be installed per the City’s bypass pumping requirements and per the bypass pumping plan provided by the contractor.

A water main bypass must be installed per plan to reduce the possibility of any water outage during this project. All temporary pipes and fittings must be disinfected during installation per ANSI/AWWA Standard C651-14. A sample port must be installed on the bypass line and a BAC-t test will be collected by the Bullhead City Water Quality Specialist. This Bac-t test must “pass” prior to opening the bypass.

The City of Bullhead City will coordinate with Mohave Electric Cooperative (MEC) to deenergize and remove the power lines within this trench-line prior to the start of excavation. The selected contractor will be responsible for preserving this conduit in place; or remove and replace the conduit as needed. The conduit shall be inspected and approved by a MEC inspector prior to backfill.

Due to the volume of sewage carried by the nearby sewage lift station and the lift station running on backup power the selected contractor must adhere to a strict schedule allowing no delays throughout the duration of this project.

25-U-001 IFB.24 in Sewer Main Replacement

Commodity Codes
  • NAICS 237110Water and Sewer Line and Related Structures Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Proposal for Parking Lot Paving

Proposal for Parking Lot Paving.pdf (269.63 Kb) Navajo Nation Western Regional Business Development

Navajo Nation

Bid Due: 7/10/2026

RFB-26-333 Shaw Field Irrigat...

Project: RFB-26-333 Shaw Field Irrigation Improvements Ref. #: RFB-26-333 Shaw Field Irrigation Improvements

City of Yuma

Bid Due: 7/16/2026