| Pavement milling, hot mix asphalt overlay, with drainage and safety improvements. And other incidental work. |
State Government of Maine |
Maine |
S&L |
5/20/2025 |
5/21/2025 |
| Woodland Fish Passage System: This Project partially removes and replaces an existing fish ladder and includes construction of a new… |
State Government of Maine |
Maine |
S&L |
5/17/2025 |
6/25/2025 |
| Pavement milling, hot mix asphalt overlay with drainage, safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
5/15/2025 |
6/04/2025 |
| On-call Mastic Melter Plug Joint & Crack Sealer Machine. |
State Government of Maine |
Maine |
S&L |
5/15/2025 |
6/04/2025 |
| Large culvert replacements and other incidental work. |
State Government of Maine |
Maine |
S&L |
5/15/2025 |
6/04/2025 |
| Manufacture and delivery of hot-dip galvanized steel bridge rail with anchor bolts and hardware and other incidental work. |
State Government of Maine |
Maine |
S&L |
5/15/2025 |
6/04/2025 |
| Bridge wearing surface replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
5/15/2025 |
6/04/2025 |
| Large culvert replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
5/15/2025 |
6/04/2025 |
| On-call plumbing services and other incidental work. |
State Government of Maine |
Maine |
S&L |
5/15/2025 |
6/04/2025 |
| Drainage improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
5/15/2025 |
6/04/2025 |
| On-call electrical services and other incidental work. |
State Government of Maine |
Maine |
S&L |
5/15/2025 |
6/04/2025 |
| Maintenance and repair of generators and other incidental work. |
State Government of Maine |
Maine |
S&L |
5/15/2025 |
6/04/2025 |
| Pavement milling, hot mis asphalt overlay, with drainage and safety improvements. And other incidental work. |
State Government of Maine |
Maine |
S&L |
5/14/2025 |
5/21/2025 |
| Pavement milling, cold in-place recycling, hot mix asphalt overlay with drainage and safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
5/01/2025 |
5/21/2025 |
| Ultra-thin bonding wearing course with drainage and safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
5/01/2025 |
5/21/2025 |
| ELEVATOR SERVICE, REPAIR, AND |
State Government of Maine |
Maine |
S&L |
5/01/2025 |
5/21/2025 |
| ADA ramp improvements with safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/25/2025 |
5/14/2025 |
| Pavement milling, hot mis asphalt overlay, with drainage and safety improvements. And other incidental work. |
State Government of Maine |
Maine |
S&L |
4/25/2025 |
5/14/2025 |
| Highway Rehabilitation, pavement milling, hot mix asphalt with safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/25/2025 |
5/14/2025 |
| Mill and Fill and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/25/2025 |
5/14/2025 |
| Construction of salt storage building and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/25/2025 |
5/14/2025 |
| Maxwell Bridge #2524 replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/25/2025 |
5/14/2025 |
| ADA Ramp improvements with safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/25/2025 |
5/14/2025 |
| On call painted pavement markings and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/24/2025 |
5/14/2025 |
| Supply and deliver Flashing LED Signs, Wrong Way, Do Not Enter, Enter Here and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/24/2025 |
5/14/2025 |
| Pavement milling, cold in place recycling, hot mix asphalt and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/18/2025 |
5/07/2025 |
| Large culvert replacements and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/18/2025 |
5/07/2025 |
| Ultra-thin bonded wearing course and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/18/2025 |
5/07/2025 |
| ADA Ramp improvements with safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/17/2025 |
5/07/2025 |
| Ultra-thin bonded wearing course with safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/17/2025 |
4/30/2025 |
| Cyclical resurfacing with drainage improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/17/2025 |
4/23/2025 |
| Union Street Resurfacing. This is a locally administered project. Please direct all correspondence to https://bangormaine.gov/Bids.aspx |
State Government of Maine |
Maine |
S&L |
4/17/2025 |
5/07/2025 |
| ADA Ramp improvements with safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/17/2025 |
5/07/2025 |
| RECTANGULAR RAPID FLASHING |
State Government of Maine |
Maine |
S&L |
4/17/2025 |
5/07/2025 |
| ADA Ramp improvements with safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/17/2025 |
5/07/2025 |
| Install a traffic signal at the intersection of Route 1, Cross Road and Cochran Road, plus other incidental work. |
State Government of Maine |
Maine |
S&L |
4/12/2025 |
4/23/2025 |
| Slope stabilization and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/11/2025 |
4/30/2025 |
| Pavement milling, full depth reclamation, hot mix asphalt with drainage and safety improvements. And other incidental work. |
State Government of Maine |
Maine |
S&L |
4/11/2025 |
4/16/2025 |
| Highway rehabilitation including placement of recycled asphalt pavement, HMA overlay and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/10/2025 |
4/23/2025 |
| Highway rehabilitation including full depth reclamation with cement, HMA overlay and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/10/2025 |
4/23/2025 |
| Large Culvert Replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/10/2025 |
4/16/2025 |
| Crooked river bridge joint and wearing surface plus other incidental work. |
State Government of Maine |
Maine |
S&L |
4/10/2025 |
4/30/2025 |
| Rest area maintenance, cleaning and light carpentry. |
State Government of Maine |
Maine |
S&L |
4/10/2025 |
4/30/2025 |
| Pavement milling, hot mix asphalt, ultra-thin bonded wearing course with drainage and safety improvements, and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/04/2025 |
4/23/2025 |
| Crack Sealing and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/03/2025 |
4/16/2025 |
| Cyclical Pavement Resurfacing and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/03/2025 |
4/09/2025 |
| Screening stockpiles of bituminous pavement and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/03/2025 |
4/16/2025 |
| Hot mix asphalt overlay with safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/03/2025 |
4/16/2025 |
| On Call Guardrail Work and other incidental work. |
State Government of Maine |
Maine |
S&L |
4/02/2025 |
4/16/2025 |
| Pavement milling, hot mix asphalt overlay with drainage and safety improvements, and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/28/2025 |
4/16/2025 |
| Install a traffic signal at the intersection of Route 1, Cross Road and Cochran Road, plus other incidental work. |
State Government of Maine |
Maine |
S&L |
3/28/2025 |
4/16/2025 |
| Highway rehabilitation with Plant Mixed Recycled Asphalt Pavement and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/27/2025 |
4/16/2025 |
| Pavement markings, stenciling and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/27/2025 |
4/16/2025 |
| EQUIPMENT ATHEY LOADER OR LEE-BOY FORCE FEED LOADER Seasonal Use Without an Operator |
State Government of Maine |
Maine |
S&L |
3/27/2025 |
4/16/2025 |
| Rest Area Maintenance, cleaning and light carpentry. |
State Government of Maine |
Maine |
S&L |
3/27/2025 |
4/16/2025 |
| Large culvert improvements and other incidental work |
State Government of Maine |
Maine |
S&L |
3/27/2025 |
4/16/2025 |
| PMRAP with variable depth shim, 3/4" overlay and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/27/2025 |
4/09/2025 |
| Pavement markings, stenciling and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/27/2025 |
4/16/2025 |
| Cyclical resurfacing with drainage improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/27/2025 |
4/16/2025 |
| Pavement marking & stenciling and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/27/2025 |
4/16/2025 |
| Full depth reclamation treated with emulsion, 1 1/2" HMA overlay and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/27/2025 |
4/16/2025 |
| On-call plumbing services and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/27/2025 |
4/16/2025 |
| White painted pavement marking lines. And other incidental work. |
State Government of Maine |
Maine |
S&L |
3/27/2025 |
4/16/2025 |
| This is a locally administered project. |
State Government of Maine |
Maine |
S&L |
3/26/2025 |
4/17/2025 |
| On Call Guardrail Work and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/25/2025 |
4/02/2025 |
| This is a locally administered project. |
State Government of Maine |
Maine |
S&L |
3/24/2025 |
4/17/2025 |
| This is a locally administered project. |
State Government of Maine |
Maine |
S&L |
3/22/2025 |
4/15/2025 |
| Pavement milling, ultra-thin bonded wearing course, hot mix asphalt overlay with drainage and safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/21/2025 |
4/09/2025 |
| Pavement milling, ultra-thin wearing course with drainage improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/21/2025 |
4/09/2025 |
| Pavement milling, full depth reclamation, hot mix asphalt with drainage and safety improvements. And other incidental work. |
State Government of Maine |
Maine |
S&L |
3/21/2025 |
4/09/2025 |
| Crushing stockpiles of bituminous pavement and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/20/2025 |
4/02/2025 |
| Service, Testing and Maintenance of Fire extinguishers and Fire extinguishers and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/20/2025 |
4/02/2025 |
| PMRAP with variable depth shim, 3/4" overlay and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/20/2025 |
4/09/2025 |
| Fabricate and deliver precast concrete culvert and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/20/2025 |
4/09/2025 |
| Automated weather observing system Level III construction and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/20/2025 |
4/09/2025 |
| Cyclical Pavement Resurfacing and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/20/2025 |
4/09/2025 |
| Interstate 95/MCRR St. George River, Route 1/3 an Thoroughfare bridge paint projects plus other incidental work. |
State Government of Maine |
Maine |
S&L |
3/15/2025 |
4/02/2025 |
| Falmouth, Lewiston, Waterford & Gray Bridge Painting Projects. |
State Government of Maine |
Maine |
S&L |
3/15/2025 |
4/02/2025 |
| Interstate 95 southbound, B&A RR and Patten Road, West Etna Road, Interstate 95, Route 69 & Interstate 95 bridge paintings… |
State Government of Maine |
Maine |
S&L |
3/15/2025 |
4/02/2025 |
| ANSON, FAIRFIELD, BENTON, CLINTON, WINSLOW, WATERVILLE BRIDGE BEAM ENDS AND BEARINGS PAINT PROJECTS PLUS OTHER INCIDENTAL WORK |
State Government of Maine |
Maine |
S&L |
3/15/2025 |
4/02/2025 |
| Pavement grooving and Polyurea Painting, and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/15/2025 |
4/02/2025 |
| Cold in-place recycling, pavement milling, hot mix asphalt overlay with drainage and safety improvements, and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/14/2025 |
4/02/2025 |
| GRADER ON CALL EQUIPMENT RENTAL with an Operator |
State Government of Maine |
Maine |
S&L |
3/13/2025 |
4/02/2025 |
| ROLLERS and RC TRENCH ROLLERS ON CALL EQUIPMENT RENTAL |
State Government of Maine |
Maine |
S&L |
3/13/2025 |
4/02/2025 |
| Cyclical pavement and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/13/2025 |
4/02/2025 |
| MATERIALS Liquid Chloride Tanks |
State Government of Maine |
Maine |
S&L |
3/13/2025 |
4/02/2025 |
| Pavement milling, hot mix asphalt overlay with Drainage and Safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/13/2025 |
4/02/2025 |
| Pavement milling, hot mix asphalt overlay with drainage improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/13/2025 |
4/02/2025 |
| SHIM & OVERLAY MAINEDOT PARK & RIDE AT THE |
State Government of Maine |
Maine |
S&L |
3/13/2025 |
4/02/2025 |
| Crushing stockpiles of bituminous pavement and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/13/2025 |
3/26/2025 |
| LOADERS ON CALL EQUIPMENT RENTAL without an Operator |
State Government of Maine |
Maine |
S&L |
3/13/2025 |
4/02/2025 |
| Farrar Bridge replacement plus other incidental work. |
State Government of Maine |
Maine |
S&L |
3/08/2025 |
3/26/2025 |
| On call specialized bridge welding. |
State Government of Maine |
Maine |
S&L |
3/07/2025 |
3/19/2025 |
| Large Culvert Replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/06/2025 |
3/26/2025 |
| Pavement milling and ultra-thin bond wearing course, with drainage and safety improvements. And other incidental work. |
State Government of Maine |
Maine |
S&L |
3/06/2025 |
3/26/2025 |
| LIFE RAFTS/INFLATABLE BOUYANT |
State Government of Maine |
Maine |
S&L |
3/06/2025 |
3/26/2025 |
| Pavement Milling. ultra-thin bonded wearing course. Hot mix asphalt overlay with safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/03/2025 |
3/12/2025 |
| Bridge wearing surface replacements and other incidental work. |
State Government of Maine |
Maine |
S&L |
3/01/2025 |
3/19/2025 |
| Roundabout construction. And other incidental work. |
State Government of Maine |
Maine |
S&L |
3/01/2025 |
3/19/2025 |
| Pavement milling, hot mix asphalt overlay, cyclical pavement resurfacing, with safety improvements. And other incidental work. |
State Government of Maine |
Maine |
S&L |
2/28/2025 |
3/19/2025 |
| SHOULDER MACHINE |
State Government of Maine |
Maine |
S&L |
2/28/2025 |
3/19/2025 |
| SWEEPERS |
State Government of Maine |
Maine |
S&L |
2/28/2025 |
3/19/2025 |
| Cyclical pavement resurfacing and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/27/2025 |
3/19/2025 |
| SWEEPERS |
State Government of Maine |
Maine |
S&L |
2/27/2025 |
3/19/2025 |
| Veteran's Memorial Bridge (#5750) rehabilitation and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/27/2025 |
3/12/2025 |
| Cyclical pavement resurfacing, and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/27/2025 |
3/19/2025 |
| On Call Guardrail Work and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/27/2025 |
3/19/2025 |
| Cyclical pavement resurfacing. And other incidental work. |
State Government of Maine |
Maine |
S&L |
2/27/2025 |
3/19/2025 |
| On Call Maintenance Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/27/2025 |
3/19/2025 |
| SHOULDER MACHINE |
State Government of Maine |
Maine |
S&L |
2/27/2025 |
3/19/2025 |
| Ultra-thin bonded wearing course and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/27/2025 |
3/19/2025 |
| Service, Testing and Maintenance of Fire extinguishers and Fire extinguishers and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/27/2025 |
3/19/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/21/2025 |
3/12/2025 |
| Cyclical pavement resurfacing and safety improvements. And other incidental work. |
State Government of Maine |
Maine |
S&L |
2/21/2025 |
2/26/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Bridge Joint Replacement on James B Longley Memorial Bridge and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Round Pond bridge replacement and other incidental work |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Pavement milling, asphalt overlay, with drainage and safety improvements, and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| Light Capital Paving and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/20/2025 |
3/12/2025 |
| On Call electrical services. |
State Government of Maine |
Maine |
S&L |
2/15/2025 |
2/19/2025 |
| EXCAVATORS, DOZERS, WHEELED SKID STEER LOADERS and COMPACT TRACK LOADERS ON CALL EQUIPMENT RENTAL |
State Government of Maine |
Maine |
S&L |
2/15/2025 |
3/05/2025 |
| Veteran's Memorial Bridge (#5750) rehabilitation and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/13/2025 |
3/05/2025 |
| Intersection safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/13/2025 |
3/05/2025 |
| EXCAVATORS, DOZERS, WHEELED SKID STEER LOADERS and COMPACT TRACK LOADERS ON CALL EQUIPMENT RENTAL |
State Government of Maine |
Maine |
S&L |
2/13/2025 |
3/05/2025 |
| Cyclical pavement resurfacing with drainage improvements. |
State Government of Maine |
Maine |
S&L |
2/13/2025 |
3/05/2025 |
| Landscaping services statewide. |
State Government of Maine |
Maine |
S&L |
2/13/2025 |
3/05/2025 |
| Large Culvert Repair (GRP LINING SYSTEM WITH WEIRS) |
State Government of Maine |
Maine |
S&L |
2/13/2025 |
3/05/2025 |
| Pavement milling, ultra-thin bonded wearing course, with safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/13/2025 |
3/05/2025 |
| On call specialized bridge welding. |
State Government of Maine |
Maine |
S&L |
2/13/2025 |
3/05/2025 |
| Crushing stockpiles of bituminous pavement and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/13/2025 |
2/26/2025 |
| MaineDOT Headquarters Grounds Maintenance. |
State Government of Maine |
Maine |
S&L |
2/13/2025 |
3/05/2025 |
| Pavement Milling. ultra-thin bonded wearing course. Hot mix asphalt overlay with safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/13/2025 |
3/05/2025 |
| Buildings & Ground Maintenance and repair services. |
State Government of Maine |
Maine |
S&L |
2/13/2025 |
3/05/2025 |
| Roundabout construction, roadside improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/08/2025 |
2/26/2025 |
| Puddle Dock Bridge replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/07/2025 |
2/26/2025 |
| Cyclical pavement resurfacing with Drainage and Safety improvements, and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/07/2025 |
2/26/2025 |
| Intersection safety improvements at Route 4/202 and Gore Road. |
State Government of Maine |
Maine |
S&L |
2/06/2025 |
2/26/2025 |
| Pavemement milling, ultra-thin bonded wearing course, hot mix asphalt overlay with drainage and safety improvements. |
State Government of Maine |
Maine |
S&L |
2/06/2025 |
2/26/2025 |
| Bridge wearing surface replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/01/2025 |
2/19/2025 |
| Drainage improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
2/01/2025 |
2/19/2025 |
| Pavement milling. Hot mix asphalt with drainage and safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
1/31/2025 |
2/19/2025 |
| Track Excavators Seasonal use without operators. |
State Government of Maine |
Maine |
S&L |
1/31/2025 |
2/19/2025 |
| Track Excavators Seasonal use without operators. |
State Government of Maine |
Maine |
S&L |
1/30/2025 |
2/19/2025 |
| Crack sealing. And other incidental work. |
State Government of Maine |
Maine |
S&L |
1/30/2025 |
2/19/2025 |
| Track Excavators Seasonal use without operators. |
State Government of Maine |
Maine |
S&L |
1/30/2025 |
2/19/2025 |
| Crack sealing. And other incidental work. |
State Government of Maine |
Maine |
S&L |
1/30/2025 |
2/19/2025 |
| On call mulching with an operator. |
State Government of Maine |
Maine |
S&L |
1/30/2025 |
2/19/2025 |
| Crack sealing. And other incidental work. |
State Government of Maine |
Maine |
S&L |
1/30/2025 |
2/19/2025 |
| Service, Testing and Maintenance of Fire extinguishers and Fire extinguishers and other incidental work. |
State Government of Maine |
Maine |
S&L |
1/30/2025 |
2/19/2025 |
| Cyclical pavement resurfacing and safety improvements. And other incidental work. |
State Government of Maine |
Maine |
S&L |
1/30/2025 |
2/19/2025 |
| Crack sealing. And other incidental work. |
State Government of Maine |
Maine |
S&L |
1/30/2025 |
2/19/2025 |
| Track Excavators Seasonal use without operators. |
State Government of Maine |
Maine |
S&L |
1/30/2025 |
2/19/2025 |
| On Call Arborist Services and other incidental work. |
State Government of Maine |
Maine |
S&L |
1/24/2025 |
2/12/2025 |
| Large culvert repair with geopolymer, weirs and other incidental work. |
State Government of Maine |
Maine |
S&L |
1/24/2025 |
2/12/2025 |
| On Call electrical services. |
State Government of Maine |
Maine |
S&L |
1/24/2025 |
2/12/2025 |
| On Call electrical services. |
State Government of Maine |
Maine |
S&L |
1/24/2025 |
2/12/2025 |
| Large culvert replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
1/23/2025 |
2/12/2025 |
| Large culvert replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
1/23/2025 |
2/12/2025 |
| Safety Fence plus other incidental work. |
State Government of Maine |
Maine |
S&L |
1/23/2025 |
2/12/2025 |
| Construction of A Hybrid Ferry. Construction of a 207-foot LOA double-ended passenger/vehicle ferry. |
State Government of Maine |
Maine |
S&L |
1/22/2025 |
1/29/2025 |
| Culvert ends remove and reset. |
State Government of Maine |
Maine |
S&L |
1/16/2025 |
2/05/2025 |
| Pavement Milling. Hot Mix Asphalt Overlay with Drainage and Safety Improvement and other incidental work. |
State Government of Maine |
Maine |
S&L |
1/16/2025 |
2/05/2025 |
| Bids for the Cedar Street Parking Facility Pedestrian Improvements project in the Municipality of Brunswick. |
State Government of Maine |
Maine |
S&L |
1/15/2025 |
2/20/2025 |
| Construction of Pedestrian Bridge. Construction of a pedestrian bridge on Rawson Avenue, in Camden, approximately 0.5 mile from Washington Street. |
State Government of Maine |
Maine |
S&L |
1/15/2025 |
1/31/2025 |
| Cromwell Brook #3 Bridge #0452 Replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
1/10/2025 |
1/29/2025 |
| Large culvert replacements and other incidental work. |
State Government of Maine |
Maine |
S&L |
1/10/2025 |
1/29/2025 |
| Large Culvert Replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
1/10/2025 |
1/29/2025 |
| Basement Drainage System at the Region 1 office. |
State Government of Maine |
Maine |
S&L |
1/09/2025 |
1/29/2025 |
| Large culvert #894509 and Jewett Bridge #5460 replacement. |
State Government of Maine |
Maine |
S&L |
1/09/2025 |
1/29/2025 |
| Safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
1/08/2025 |
1/15/2025 |
| College Swamp Bridge replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
1/08/2025 |
1/15/2025 |
| Mill and fill and other incidental work. |
State Government of Maine |
Maine |
S&L |
1/07/2025 |
1/15/2025 |
| Breakwater with roadway, float system, parking lot, boat launch and privy. |
State Government of Maine |
Maine |
S&L |
1/07/2025 |
1/29/2025 |
| ON CALL HAZARDOUS AND SPECIAL WASTE |
State Government of Maine |
Maine |
S&L |
1/03/2025 |
1/15/2025 |
| Large culvert replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
12/24/2024 |
1/15/2025 |
| Highway Rehabilitation & Mill and Fill. |
State Government of Maine |
Maine |
S&L |
12/24/2024 |
1/15/2025 |
| Bridge wearing surface replacement: I-95 BRIDGES #1457, #1458, #1459, #5816, #5817 |
State Government of Maine |
Maine |
S&L |
12/24/2024 |
1/15/2025 |
| DUMP TRUCKS |
State Government of Maine |
Maine |
S&L |
12/24/2024 |
1/08/2025 |
| Highway Rehabilitation & Mill and Fill. |
State Government of Maine |
Maine |
S&L |
12/21/2024 |
1/08/2025 |
| College Swamp Bridge replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
12/20/2024 |
1/08/2025 |
| Mill and fill and other incidental work. |
State Government of Maine |
Maine |
S&L |
12/20/2024 |
1/08/2025 |
| Safety improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
12/19/2024 |
1/08/2025 |
| Mitchell Bridge Replacement plus other incidental work. |
State Government of Maine |
Maine |
S&L |
12/19/2024 |
1/08/2025 |
| Breakwater with roadway, float system, parking lot, boat launch and privy. |
State Government of Maine |
Maine |
S&L |
12/19/2024 |
1/15/2025 |
| Bridge's bridge, over Wilson Stream, replacement, and other incidental work. |
State Government of Maine |
Maine |
S&L |
12/19/2024 |
1/08/2025 |
| Intersection Improvements. Installation of traffic signals with advance detection equipment. |
State Government of Maine |
Maine |
S&L |
12/19/2024 |
1/08/2025 |
| Intersection Safety Improvements and other incidental work. |
State Government of Maine |
Maine |
S&L |
12/14/2024 |
1/08/2025 |
| Meadowbrook Bridge #5856 Replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
12/14/2024 |
1/08/2025 |
| Casey Road/1-95 Bridge Deck Replacement plus other incidental work. |
State Government of Maine |
Maine |
S&L |
12/14/2024 |
1/08/2025 |
| Furnishing and installation of highway traffic cameras and other incidental work. |
State Government of Maine |
Maine |
S&L |
12/10/2024 |
12/18/2024 |
| Construction of A Hybrid Ferry. Construction of a 207-foot LOA double-ended passenger/vehicle ferry. |
State Government of Maine |
Maine |
S&L |
12/05/2024 |
1/22/2025 |
| Installation of continuous traffic count station and other incidental work. |
State Government of Maine |
Maine |
S&L |
12/03/2024 |
12/11/2024 |
| Puddle Dock Bridge replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
11/28/2024 |
12/18/2024 |
| ON CALL HAZARDOUS AND SPECIAL WASTE |
State Government of Maine |
Maine |
S&L |
11/28/2024 |
12/18/2024 |
| Large Culvert Replacement and other incidental work. |
State Government of Maine |
Maine |
S&L |
11/28/2024 |
12/18/2024 |
| DUMP TRUCKS |
State Government of Maine |
Maine |
S&L |
11/28/2024 |
12/18/2024 |
| ON CALL GEOPOLYMER MANHOLE & RETAINING WALL REHABILITATION |
State Government of Maine |
Maine |
S&L |
11/28/2024 |
12/18/2024 |
| DAVITS INSPECTION & MAINTENANCE |
State Government of Maine |
Maine |
S&L |
11/28/2024 |
12/18/2024 |
| Highway Reconstruction, Bridge Rehabilitation & Lighting Replacement |
State Government of Maine |
Maine |
S&L |
11/28/2024 |
12/11/2024 |
| LEWISTON, ROUTE 202. Mill and Fill. |
State Government of Maine |
Maine |
S&L |
11/27/2024 |
1/07/2025 |
| Pedestrian & ADA Improvement Projects in the Municipality of Lewiston. |
State Government of Maine |
Maine |
S&L |
11/27/2024 |
1/07/2025 |
| Mill and fill and other incidental work. |
State Government of Maine |
Maine |
S&L |
11/22/2024 |
12/11/2024 |
| PREQUALIFICATION FOR ON CALL |
State Government of Maine |
Maine |
S&L |
11/22/2024 |
12/11/2024 |
| Fish Bridge replacement plus other incidental work. |
State Government of Maine |
Maine |
S&L |
11/21/2024 |
12/18/2024 |
| PREQUALIFICATION FOR MARINE DOCK, |
State Government of Maine |
Maine |
S&L |
11/21/2024 |
12/11/2024 |
| Furnishing and installation of highway traffic cameras and other incidental work. |
State Government of Maine |
Maine |
S&L |
11/21/2024 |
12/11/2024 |
| Farbricate and deliver precast concrete box culvert and other incidental work. |
State Government of Maine |
Maine |
S&L |
11/21/2024 |
12/11/2024 |
| PREQUALIFICATION FOR/ULTRA-VIOLET CURED IN PLACE, PIPE LINING SEVICES AND/OR RELATED WORK |
State Government of Maine |
Maine |
S&L |
11/21/2024 |
12/04/2024 |
| Installation of continuous traffic count station and other incidental work. |
State Government of Maine |
Maine |
S&L |
11/16/2024 |
12/04/2024 |
| Fish Bridge replacement plus other incidental work. |
State Government of Maine |
Maine |
S&L |
11/15/2024 |
12/11/2024 |
| Babsons Bridge #5244 Replacement plus other incidental work. |
State Government of Maine |
Maine |
S&L |
11/14/2024 |
11/20/2024 |
| WHEELED EXCAVATORS WITH FORESTRY MULCHER Without an Operator |
State Government of Maine |
Maine |
S&L |
11/14/2024 |
12/04/2024 |
| PREQUALIFICATION FOR ULTRA-VIOLET CURED IN PLACE PIPE LINING SEVICES AND/OR RELATED WORK |
State Government of Maine |
Maine |
S&L |
11/14/2024 |
12/04/2024 |
| Highway Reconstruction, Bridge Rehabilitation & Lighting Replacement |
State Government of Maine |
Maine |
S&L |
11/09/2024 |
12/04/2024 |
| Babsons Bridge #5244 Replacement plus other incidental work. |
State Government of Maine |
Maine |
S&L |
10/26/2024 |
11/13/2024 |
| SPRINKLER TESTING/INSPECTIONS AND |
State Government of Maine |
Maine |
S&L |
10/23/2024 |
11/13/2024 |
| Replacement of existing over height vehicle detection equipment. |
State Government of Maine |
Maine |
S&L |
10/19/2024 |
11/06/2024 |
| Construction of A Hybrid Ferry. Construction of a 207-foot LOA double-ended passenger/vehicle ferry. |
State Government of Maine |
Maine |
S&L |
10/19/2024 |
12/18/2024 |
| WELD ROAD BRIDGE |
State Government of Maine |
Maine |
S&L |
10/18/2024 |
10/30/2024 |
| Structural rehabilitation work at the ferry terminals on Chebeague Island, Cliff Island, Great Diamond Island, and Peaks Island. |
State Government of Maine |
Maine |
S&L |
10/16/2024 |
10/23/2024 |
| Sidewalk construction with ADA Upgrades, drainage improvements and water utility work beginning at Margaret Chase Smith Library and extending 0.35… |
State Government of Maine |
Maine |
S&L |
10/04/2024 |
10/23/2024 |
| PROPOSAL #P25-19 GRIFFIN ROAD/ KENDUSKEAG AVE SIGNAL IMPROVEMENTS PROJECT. For bid proposals and more information go to: https://www.bangormaine.gov/proposals |
State Government of Maine |
Maine |
S&L |
10/03/2024 |
10/30/2024 |
| PUMP STATION REHABILITATION: Furnish and replace septic pumps, motors, control panels, alarms, bypass system and other incidental work. |
State Government of Maine |
Maine |
S&L |
10/03/2024 |
10/23/2024 |