Bid Title Issuing Agency Location Gov Level Published Date Closing Date
Scope: Bridge preservation for two bridges on the circumferential highway over the Merrimack River and CSX railroad. Addendum 1 State Government of New Hampshire New Hampshire S&L 7/02/2026 7/09/2026
Scope: Bridge preservation for two bridges on the circumferential highway over the Merrimack River and CSX railroad. State Government of New Hampshire New Hampshire S&L 6/16/2026 7/09/2026
Scope: Convert Intersections into All-Way Stops State Government of New Hampshire New Hampshire S&L 6/04/2026 6/25/2026
Scope: Culvert replacement of an approximate 4x4 concrete/stone box culvert. State Government of New Hampshire New Hampshire S&L 6/02/2026 6/11/2026
Scope: Culvert replacement of an approximate 4x4 concrete/stone box culvert. State Government of New Hampshire New Hampshire S&L 5/20/2026 6/11/2026
Scope: Replacement of culverts conveying normal tidal flows under Squamscott Road with concrete box culverts. Addendum 1 State Government of New Hampshire New Hampshire S&L 5/15/2026 5/21/2026
Replacement of culverts conveying normal tidal flows under Squamscott Road with concrete box culverts. State Government of New Hampshire New Hampshire S&L 5/12/2026 5/21/2026
Scope: Replacement of culverts conveying normal tidal flows under Squamscott Road with concrete box culverts. State Government of New Hampshire New Hampshire S&L 4/28/2026 5/21/2026
Scope: Repair damaged beam guardrail on the Central & Eastern Turnpike Addendum 1 State Government of New Hampshire New Hampshire S&L 4/20/2026 5/07/2026
Scope: Repair damaged beam guardrail on Tier 1 roadways within District 2 & 5. State Government of New Hampshire New Hampshire S&L 4/14/2026 5/07/2026
Scope: Repair damaged beam guardrail on the Central & Eastern Turnpike. State Government of New Hampshire New Hampshire S&L 4/14/2026 5/07/2026
Scope: Repair damaged beam guardrail on Tier 1 roadways in Districts 1 & 3. State Government of New Hampshire New Hampshire S&L 4/14/2026 5/07/2026
Statewide Tier 2 Resurfacing (north) 45071 .pdf Scope: Resurfacing various tier 2 roadways. State Government of New Hampshire New Hampshire S&L 4/07/2026 4/30/2026
Scope: Rehabilitation of the bridge carrying NH Route 12 over NHRR, bridge replacement of the bridge carrying NH 12 over… State Government of New Hampshire New Hampshire S&L 4/07/2026 4/09/2026
Scope: Rehabilitation of the bridge carrying NH Route 12 over NHRR, bridge replacement of the bridge carrying NH 12 over… State Government of New Hampshire New Hampshire S&L 4/03/2026 4/09/2026
Scope: Rehabilitation of the bridge carrying NH Route 12 over NHRR, bridge replacement of the bridge carrying NH 12 over… State Government of New Hampshire New Hampshire S&L 4/01/2026 4/09/2026
Scope: Removal and replacement of box beam guardrail with doubled faced thrie beam guardrail and updated end units. State Government of New Hampshire New Hampshire S&L 3/25/2026 4/16/2026
Scope: Rehabilitation of the bridge carrying NH Route 12 over NHRR, bridge replacement of the bridge carrying NH 12 over… State Government of New Hampshire New Hampshire S&L 3/17/2026 4/09/2026
Scope: Painting the steel beam bridges carrying Walnut Avenue over I-95 NB & SB, Post Road over I-95 NB &… State Government of New Hampshire New Hampshire S&L 3/13/2026 3/26/2026
Scope: Crack sealing various tier 2 roads through the central & eastern part of the State. Addendum 1 State Government of New Hampshire New Hampshire S&L 3/12/2026 3/26/2026
Scope: Reconstruct NH123A roadway and slope stabilization, repair damage resulting from 2021 storm events. Addendum 1 State Government of New Hampshire New Hampshire S&L 3/10/2026 3/19/2026
Painting bridges: N. Hampton 078/070, N. Hampton 089/123; I-95 Bridge Painting State Government of New Hampshire New Hampshire S&L 3/03/2026 3/19/2026
Crack sealing various Tier 2 roads through the central and eastern part of the State. State Government of New Hampshire New Hampshire S&L 3/03/2026 3/26/2026
NH 123A Roadway and slope stabilization repair at approximately MM 2.0 (B58 project storm STM77350); NH 123A Roadway and slope… State Government of New Hampshire New Hampshire S&L 3/02/2026 3/19/2026
Reconstruct NH123A roadway and slope stabilization, repair damage resulting from 2021 storm events. State Government of New Hampshire New Hampshire S&L 2/25/2026 3/19/2026
Painting the steel beam bridges carrying Walnut Avenue over I-95 NB & SB, Post Road over I-95 NB & SB… State Government of New Hampshire New Hampshire S&L 2/25/2026 3/19/2026
Constructing a new vehicle fueling facility and removing the existing fueling facility on NH 10 at the Marlow Shed Addendum… State Government of New Hampshire New Hampshire S&L 2/19/2026 2/26/2026
Pavement marking maintenance via contractor. Limited to stenciled and transverse markings State Government of New Hampshire New Hampshire S&L 2/19/2026 3/12/2026
Constructing a new vehicle fueling facility and removing the existing fueling facility on NH 10 at the Marlow Shed Addendum… State Government of New Hampshire New Hampshire S&L 2/13/2026 2/26/2026
Scope: Resurfacing various 2, 3 and 4 roadways in District 5. State Government of New Hampshire New Hampshire S&L 2/13/2026 2/24/2026
High mast light conversions to LED Addendum 2 State Government of New Hampshire New Hampshire S&L 2/13/2026 2/19/2026
Constructing a new vehicle fueling facility and removing the existing fueling facility on NH 10 at the Marlow Shed Addendum… State Government of New Hampshire New Hampshire S&L 2/12/2026 2/19/2026
Resurfacing various tier 2, 3 and 4 roadways in District 1. State Government of New Hampshire New Hampshire S&L 2/06/2026 2/24/2026
Resurfacing various tier 2, 3 and 4 roadways in District 4. State Government of New Hampshire New Hampshire S&L 2/06/2026 3/03/2026
Resurfacing various tier 2, 3 and 4 roadways in District 3. State Government of New Hampshire New Hampshire S&L 2/06/2026 3/03/2026
High mast light conversions to LED Addendum 1 State Government of New Hampshire New Hampshire S&L 2/05/2026 2/12/2026
Resurfacing various tier 2, 3 and 4 roadways in District 4. State Government of New Hampshire New Hampshire S&L 2/04/2026 3/03/2026
Resurfacing various 2, 3 and 4 roadways in District 4. State Government of New Hampshire New Hampshire S&L 2/04/2026 3/03/2026
Resurfacing various tier 2, 3 and 4 roadways in District 1. State Government of New Hampshire New Hampshire S&L 2/04/2026 2/24/2026
Resurfacing various 2, 3 and 4 roadways in District 5. State Government of New Hampshire New Hampshire S&L 2/04/2026 2/24/2026
Resurfacing various tier 2, 3 and 4 roadways in District 2. State Government of New Hampshire New Hampshire S&L 2/04/2026 2/26/2026
Resurfacing various 2, 3 and 4 roadways in District 5. State Government of New Hampshire New Hampshire S&L 2/04/2026 2/24/2026
Resurfacing various tier 2, 3 and 4 roadways in District 6. State Government of New Hampshire New Hampshire S&L 2/04/2026 2/26/2026
Resurfacing various tier 2, 3 and 4 roadways in District 2. State Government of New Hampshire New Hampshire S&L 2/04/2026 2/26/2026
Resurfacing various 2, 3 and 4 roadways in District 6. State Government of New Hampshire New Hampshire S&L 2/04/2026 2/26/2026
Replace 2 bridges - NH 11 over NHRR(ABD) (206/137) and NH 11 over Sucker Brook (208/137). Addendum 1 State Government of New Hampshire New Hampshire S&L 1/30/2026 2/05/2026
High mast light conversions to LED State Government of New Hampshire New Hampshire S&L 1/29/2026 2/12/2026
Rehabilitation of 84" cmp under NH 9 just east of Exit 3 I-393, and 84" cmp under NH 106 just… State Government of New Hampshire New Hampshire S&L 1/28/2026 1/29/2026
Constructing a new vehicle fueling facility and removing the existing fueling facility on NH 10 at the Marlow Shed State Government of New Hampshire New Hampshire S&L 1/27/2026 2/19/2026
Scope: Rehabilitation of 84" cmp under NH 9 just east of Exit 3 I-393, and 84" cmp under NH 106… State Government of New Hampshire New Hampshire S&L 1/22/2026 1/29/2026
High mast light conversions to LED State Government of New Hampshire New Hampshire S&L 1/21/2026 2/12/2026
Replace 2 bridges - NH 11 over NHRR(ABD) (206/137) and NH 11 over Sucker Brook (208/137). State Government of New Hampshire New Hampshire S&L 1/14/2026 2/05/2026
Placement of approximately 2.4 million feet of pavement markings along the Turnpike system. State Government of New Hampshire New Hampshire S&L 1/14/2026 2/05/2026
Rehabilitation of 84" cmp under NH 9 just east of Exit 3 I-393, and 84" cmp under NH 106 just… State Government of New Hampshire New Hampshire S&L 1/06/2026 1/29/2026
Construction of new traffic monitoring locations for SMART Grant demonstration project using i-LST State Government of New Hampshire New Hampshire S&L 12/15/2025 12/18/2025
Scope: Resurfacing various Tiet 2 roadways Addendum 1 State Government of New Hampshire New Hampshire S&L 12/05/2025 12/18/2025
Scope: Removal of New Hampton Bridge located on Jackson Pond Road over NHRR, historically known as Smith's Crossing Addendum 1 State Government of New Hampshire New Hampshire S&L 12/03/2025 12/11/2025
Scope: Construction of new traffic monitoring locations for SMART Grant demonstration project using i-LST State Government of New Hampshire New Hampshire S&L 11/26/2025 12/18/2025
Scope: Resurfacing various Tiet 2 roadways State Government of New Hampshire New Hampshire S&L 11/26/2025 12/18/2025
Scope: Resurfacing six sections on the F.E. Everett Turnpike in Nashua and Merrimack State Government of New Hampshire New Hampshire S&L 11/19/2025 12/11/2025
Scope: Removal of New Hampton Bridge located on Jackson Pond Road over NHRR, historically known as Smith's Crossing State Government of New Hampshire New Hampshire S&L 11/19/2025 12/11/2025
Score: Resurfacing and preservation of various roadway sections on the Eastern Turnpike located on I-95 State Government of New Hampshire New Hampshire S&L 11/19/2025 12/11/2025
Scope: Replace Wire Road and Baboosic Lake Road Bridges over the FE Everett Turnpike Addendum 2 State Government of New Hampshire New Hampshire S&L 11/19/2025 11/20/2025
Scope: Pavement resurfacing on one section along I-93 northbound in Manchester & Hooksett in District 5 - Addendum 6 State Government of New Hampshire New Hampshire S&L 11/17/2025 11/20/2025
Scope: Pavement resurfacing on one section along I-93 northbound in Manchester & Hooksett in District 5 Addendum 5 State Government of New Hampshire New Hampshire S&L 11/14/2025 11/20/2025
Scope: Replace Wire Road and Baboosic Lake Road Bridges over the FE Everett Turnpike Addendum 2 State Government of New Hampshire New Hampshire S&L 11/14/2025 11/20/2025
Resurfacing NB I-93 from Exit 6 northerly to I-293. Includes interchanges 6, 7, 8, 9, 10, and I-293 State Government of New Hampshire New Hampshire S&L 11/07/2025 11/13/2025
Scope: Pavement resurfacing on one section along I-93 northbound in Manchester & Hooksett in District 5 Addendum 3 State Government of New Hampshire New Hampshire S&L 11/06/2025 11/20/2025
Scope: Replace Wire Road and Baboosic Lake Road Bridges over the FE Everett Turnpike Addendum 1 State Government of New Hampshire New Hampshire S&L 11/06/2025 11/20/2025
Scope: Pavement resurfacing on two sections in four towns in District 3. Addendum 2 State Government of New Hampshire New Hampshire S&L 11/05/2025 11/13/2025
Scope: Pavement resurfacing on one section along I-93 northbound in Manchester & Hooksett in District 5 Addendum 3 State Government of New Hampshire New Hampshire S&L 11/05/2025 11/13/2025
Scope: Pavement rehabilitation located along I-93 in Franconia Addendum 4 State Government of New Hampshire New Hampshire S&L 11/03/2025 11/06/2025
Scope:? Replace Wire Road and Baboosic Lake Road Bridges over the FE Everett Turnpike State Government of New Hampshire New Hampshire S&L 10/29/2025 11/20/2025
Scope: Pavement rehabilitation located along I-93 in Franconia Addendum 3 State Government of New Hampshire New Hampshire S&L 10/28/2025 11/06/2025
Scope: Pavement rehabilitation located along I-93 in Franconia Addendum 2 State Government of New Hampshire New Hampshire S&L 10/24/2025 10/30/2025
Scope: Pavement resurfacing on one section along I-93 northbound in Manchester & Hooksett in District 5 State Government of New Hampshire New Hampshire S&L 10/22/2025 11/13/2025
Scope: Pavement resurfacing on two sections in four towns in District 3. Addendum 1 State Government of New Hampshire New Hampshire S&L 10/22/2025 11/13/2025
Scope: Pavement rehabilitation located along I-93 in Franconia Addendum 1 State Government of New Hampshire New Hampshire S&L 10/16/2025 10/30/2025
Scope: Resurfacing of Tier 1 roadway locations along I-93 in the Towns of Salem, Windham, Derry and Londonderry Addendum 1 State Government of New Hampshire New Hampshire S&L 10/15/2025 10/16/2025
Scope: Pavement resurfacing on four sections in five Towns in Districts 3 & 5 State Government of New Hampshire New Hampshire S&L 10/15/2025 11/06/2025
Scope: Resurfacing of Tier 1 roadways in Towns in Districts 3 and 5 Addendum 2 State Government of New Hampshire New Hampshire S&L 10/13/2025 10/16/2025
Scope: Resurfacing of Tier 1 roadways in Towns in Districts 3 and 5 Addendum 1 State Government of New Hampshire New Hampshire S&L 10/09/2025 10/16/2025
Scope: Resurfacing of Tier 1 roadway locations along I-93 in the Towns of Salem, Windham, Derry and Londonderry Addendum 1 State Government of New Hampshire New Hampshire S&L 10/09/2025 10/16/2025
Scope: Signalize the intersection of NH Route 106 with South Village Road and Chichester Road Addendum 1 State Government of New Hampshire New Hampshire S&L 10/08/2025 10/09/2025
Scope: Pavement resurfacing of two sections in for towns in District 2 and 4 Addendum 2 State Government of New Hampshire New Hampshire S&L 10/07/2025 10/09/2025
Pavement preservation project to keep these sections of roadway in pavement preservation mode State Government of New Hampshire New Hampshire S&L 10/06/2025 10/09/2025
Intersection Improvements State Government of New Hampshire New Hampshire S&L 10/03/2025 10/09/2025
Rehab (4R) of I-93 from MM 111.6 (south of Exit 35) to MM 116.1. Includes ramps at 35, 36, &… State Government of New Hampshire New Hampshire S&L 10/02/2025 10/23/2025
Scope: Pavement rehabilitation located along I-93 in Franconia State Government of New Hampshire New Hampshire S&L 9/30/2025 10/23/2025
Scope: Bridge preservation that carries NH 132 (East Side Drive) over I-393, US 202 and US 4 State Government of New Hampshire New Hampshire S&L 9/30/2025 10/23/2025
Scope: Replacement of cable guardrail and other guardrail upgrades on US Route 3 in Pittsburg State Government of New Hampshire New Hampshire S&L 9/30/2025 10/23/2025
Scope: Construct permanent grooved durable pavement markings on I-93 from Tilton to Ashland Addendum 2 State Government of New Hampshire New Hampshire S&L 9/26/2025 10/02/2025
Scope: Reconstruction and widening of NH Route 125 Addendum 1 State Government of New Hampshire New Hampshire S&L 9/26/2025 10/02/2025
Scope: Address preservation needs for the Rockingham Flyover Bridge carrying Rockingham Mall Entrance Addendum 1 State Government of New Hampshire New Hampshire S&L 9/26/2025 10/02/2025
Scope: Resurfacing of Tier 1 roadway locations along I-93 in the Towns of Salem, Windham, Derry and Londonderry State Government of New Hampshire New Hampshire S&L 9/24/2025 10/16/2025
Scope: Resurfacing of Tier 1 roadways in Towns in Districts 3 and 5 State Government of New Hampshire New Hampshire S&L 9/24/2025 10/16/2025
Scope: Pavement resurfacing of two sections in for towns in District 2 and 4 State Government of New Hampshire New Hampshire S&L 9/24/2025 10/09/2025
Intersection Improvements State Government of New Hampshire New Hampshire S&L 9/22/2025 10/09/2025
Scope: Signalize the intersection of NH Route 106 with South Village Road and Chichester Road State Government of New Hampshire New Hampshire S&L 9/18/2025 10/09/2025
Scope: Pavement resurfacing of two sections in for towns in District 2 and 4 State Government of New Hampshire New Hampshire S&L 9/17/2025 10/09/2025
Preservation of 4 bridges in Littleton carrying I-93 over Ammonoosuc River and NHRR (ASBD) (Note: This is a three (3)… State Government of New Hampshire New Hampshire S&L 9/17/2025 9/25/2025
Scope: Construct permanent grooved durable pavement markings on I-93 from Tilton to Ashland Addendum 1 State Government of New Hampshire New Hampshire S&L 9/16/2025 9/18/2025
Scope: Operational and safety improvements at the intersection of NH 28 & Stonehenge Road Addendum 1 State Government of New Hampshire New Hampshire S&L 9/10/2025 9/18/2025
Scope: Reconstruction and widening of NH Route 125 State Government of New Hampshire New Hampshire S&L 9/10/2025 10/02/2025
Scope: Address preservation needs for the Rockingham Flyover Bridge carrying Rockingham Mall Entrance State Government of New Hampshire New Hampshire S&L 9/10/2025 10/02/2025
Scope: Replacement of stone box culvert under NH 109A, just north of Willow Avenue State Government of New Hampshire New Hampshire S&L 9/10/2025 10/02/2025
Scope:? Preservation of 4 bridges in Littleton carrying I-93 over Ammonoosuc River and NHRR (ASBD)? ?( Note: This is a… State Government of New Hampshire New Hampshire S&L 9/02/2025 9/25/2025
Scope: Operational and safety improvements at the intersection of NH 28 & Stonehenge Road State Government of New Hampshire New Hampshire S&L 8/27/2025 9/18/2025
Scope: Construct permanent grooved durable pavement markings on I-93 from Tilton to Ashland State Government of New Hampshire New Hampshire S&L 8/27/2025 9/18/2025
Scope: NH Veterans home replace three air handling units Addendum 5 State Government of New Hampshire New Hampshire S&L 8/19/2025 8/27/2025
Tilton 81358B Scope: NH Veterans home replace three air handling units Addendum 4 State Government of New Hampshire New Hampshire S&L 8/13/2025 8/20/2025
Scope: NH Veterans home replace three air handling units Addendum 3 State Government of New Hampshire New Hampshire S&L 8/07/2025 8/20/2025
Scope: NH Veterans home replace three air handling units Addendum 2 State Government of New Hampshire New Hampshire S&L 8/06/2025 8/13/2025
Scope: Remove the superstructure of the existing General Sullivan Bridge Addendum 2 State Government of New Hampshire New Hampshire S&L 8/04/2025 8/21/2025
Scope: Preservation efforts on 2-span bridge carrying NH 107 over Lamprey River State Government of New Hampshire New Hampshire S&L 7/29/2025 8/21/2025
Install median barrier on I-95 from MM 8.0 to MM 13.0 State Government of New Hampshire New Hampshire S&L 7/25/2025 7/31/2025
Scope: NH Veterans home replace three air handling units Addendum 1 State Government of New Hampshire New Hampshire S&L 7/23/2025 8/13/2025
Scope: NH Veterans home replace three air handling units State Government of New Hampshire New Hampshire S&L 7/15/2025 8/13/2025
Replcmt of 13' jack arch bridge at Pricilla Bk. 140/097 and 48" cmp/4x4 conc box just to the south State Government of New Hampshire New Hampshire S&L 7/10/2025 7/17/2025
Scope: Install median barrier on I-95 from MM 8.0 to 13.0 State Government of New Hampshire New Hampshire S&L 7/08/2025 7/31/2025
Scope: Signal pole and mast arm replacement, US Route 1 & Ocean Road State Government of New Hampshire New Hampshire S&L 7/08/2025 7/31/2025
Scope: Remove the superstructure of the existing General Sullivan Bridge Addendum 1 State Government of New Hampshire New Hampshire S&L 7/01/2025 8/11/2025
Reconstruction of the roadway damaged by slope failure due to heavy rain event State Government of New Hampshire New Hampshire S&L 6/24/2025 6/26/2025
Scope: Remove the superstructure of the existing General Sullivan Bridge State Government of New Hampshire New Hampshire S&L 6/23/2025 8/11/2025
Scope:? Replacement of 13' jack arch bridge at Pricilla Bk. 140/097 and 48" cmp/4x4 concrete box just to the south State Government of New Hampshire New Hampshire S&L 6/23/2025 7/17/2025
Score: Turnpike guardrail on Blue Star and Spaulding Turnpike. 43 locations with about 23,500 LF of GR State Government of New Hampshire New Hampshire S&L 6/17/2025 7/10/2025
Sunapee 44438A Scope: Reconstruction of the roadway damaged by slope failure due to heavy rain event Addendum 1 State Government of New Hampshire New Hampshire S&L 6/12/2025 6/26/2025
Scope: Resurfacing of various tier 2, 3 and 4 roadways in District 3 and 6 Addendum 1 State Government of New Hampshire New Hampshire S&L 6/05/2025 6/12/2025
Scope: Reconstruction of the roadway damaged by slope failure due to heavy rain event State Government of New Hampshire New Hampshire S&L 6/04/2025 6/26/2025
Scope:? Construction the NH Seacoast Greenway, from Drakeside Road north to the Hampton/North Hampton town line State Government of New Hampshire New Hampshire S&L 5/27/2025 6/19/2025
Scope: Construct salt storage building Addendum 2 State Government of New Hampshire New Hampshire S&L 5/22/2025 5/28/2025
Scope: Resurfacing of various tier 2, 3 and 4 roadways in District 3 and 6 State Government of New Hampshire New Hampshire S&L 5/22/2025 6/12/2025
Scope: Resurfacing of various tier 2, 3 and 4 roadways in District 3 and 6 State Government of New Hampshire New Hampshire S&L 5/20/2025 6/12/2025
Scope: Install median barrier on I-95 from MM 8.0 to MM 13.0 Addendum 1 State Government of New Hampshire New Hampshire S&L 5/20/2025 5/29/2025
Scope: Construct salt storage building Addendum 1 State Government of New Hampshire New Hampshire S&L 5/20/2025 5/28/2025
Scope: Turnpike drainage replacing 7 pipes at 6 locations on Spaulding TPK in Milton Addendum 1 State Government of New Hampshire New Hampshire S&L 5/16/2025 5/22/2025
Scope: Replacement of 3 cmp pipes under NH 124 at Perkins Pond State Government of New Hampshire New Hampshire S&L 5/08/2025 5/29/2025
Scope: Install median barrier on I-95 from MM 8.0 to MM 13.0 State Government of New Hampshire New Hampshire S&L 5/07/2025 5/29/2025
Scope: Replacement of a crossing 3 cmp pipes under Route 124 at Perkins Pond State Government of New Hampshire New Hampshire S&L 5/07/2025 5/29/2025
Scope: Construct salt storage building State Government of New Hampshire New Hampshire S&L 5/07/2025 5/28/2025
Turnpike Drainage replacing 7 pipes at 6 location on Spaulding Tpk. in Milton State Government of New Hampshire New Hampshire S&L 4/30/2025 5/22/2025
Scope: Turnpike drainage replacing 7 pipes at 6 locations on Spaulding TPK in Milton State Government of New Hampshire New Hampshire S&L 4/29/2025 5/22/2025
Scope: Fuel system replacement at Jefferson Patrol Shed #108 Addendum 2 State Government of New Hampshire New Hampshire S&L 4/21/2025 4/24/2025
Scope: Fuel system replacement at Jefferson Patrol Shed #108 Addendum 1 State Government of New Hampshire New Hampshire S&L 4/16/2025 4/24/2025
Scope: Bridge washing along Turnpikes & District Roads Addendum 1 State Government of New Hampshire New Hampshire S&L 4/16/2025 5/01/2025
Scope: Entry life safety improvements Addendum 1 State Government of New Hampshire New Hampshire S&L 4/14/2025 4/16/2025
Scope: Replace red listed bridge carrying NH 152 over North River Addendum 1 State Government of New Hampshire New Hampshire S&L 4/10/2025 4/17/2025
Scope: Bridge washing along Turnpikes & District Roads State Government of New Hampshire New Hampshire S&L 4/08/2025 5/01/2025
Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts I & III Addendum 2 State Government of New Hampshire New Hampshire S&L 4/07/2025 4/10/2025
Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts II & III Addendum 2 State Government of New Hampshire New Hampshire S&L 4/07/2025 4/10/2025
Scope: Resurfacing of various tier 2, 3 & 4 roadways in Districts II & IV Addendum 1 State Government of New Hampshire New Hampshire S&L 4/07/2025 4/10/2025
Scope: NH Hospital replace underground storage tanks Addendum 3 State Government of New Hampshire New Hampshire S&L 4/07/2025 4/09/2025
Scope: NH Hospital replace underground storage tanks Addendum 2 State Government of New Hampshire New Hampshire S&L 4/04/2025 4/09/2025
Scope: Fuel system replacement at Jefferson Patrol Shed #108 State Government of New Hampshire New Hampshire S&L 4/01/2025 4/24/2025
Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts I & III Addendum 1 State Government of New Hampshire New Hampshire S&L 4/01/2025 4/10/2025
Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts II & III Addendum 1 State Government of New Hampshire New Hampshire S&L 4/01/2025 4/10/2025
Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts I & III State Government of New Hampshire New Hampshire S&L 3/28/2025 4/10/2025
Scope: Rebid NHSP door and celling replacement Addendum 1 State Government of New Hampshire New Hampshire S&L 3/28/2025 4/23/2025
Scope: Replace red listed bridge carrying NH 152 over North River State Government of New Hampshire New Hampshire S&L 3/26/2025 4/17/2025
Scope: Entry life safety improvements State Government of New Hampshire New Hampshire S&L 3/26/2025 4/16/2025
Scope: NH Hospital replace underground storage tanks Addendum 1 State Government of New Hampshire New Hampshire S&L 3/20/2025 4/02/2025
Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts I & III State Government of New Hampshire New Hampshire S&L 3/18/2025 4/10/2025
Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts II & III State Government of New Hampshire New Hampshire S&L 3/18/2025 4/10/2025
Scope: Resurfacing of various tier 2, 3 & 4 roadways in Districts II & IV State Government of New Hampshire New Hampshire S&L 3/18/2025 4/10/2025
Scope: Pavement preservation project to keep sections of roadway in pavement preservation mode Addendum 1 State Government of New Hampshire New Hampshire S&L 3/13/2025 3/20/2025
Scope: Pavement preservation project to keep the sections of roadway in pavement preservation mode Addendum 1 State Government of New Hampshire New Hampshire S&L 3/13/2025 3/20/2025
Scope: NH Hospital replace underground storage tanks State Government of New Hampshire New Hampshire S&L 3/12/2025 4/02/2025
Scope: Thayer Building roof replacement State Government of New Hampshire New Hampshire S&L 3/12/2025 4/02/2025
Scope: Rebid NHSP door and celling replacement State Government of New Hampshire New Hampshire S&L 3/12/2025 4/02/2025
Scope: Pavement marking maintenance via contractor. Limited to stenciled and transverse markings State Government of New Hampshire New Hampshire S&L 3/12/2025 3/20/2025
Scope: Installation of sinusoidal rumble strips along NH 16 State Government of New Hampshire New Hampshire S&L 3/11/2025 4/03/2025
Scope: Intersection improvements at US 202, NH 9 and NH 127 Addendum 1 State Government of New Hampshire New Hampshire S&L 3/06/2025 3/13/2025
Scope: Pavement preservation project to keep sections of roadway in pavement preservation mode State Government of New Hampshire New Hampshire S&L 3/04/2025 3/20/2025
Scope: Construct permanent grooved durable polyurea pavement markings on NH 16 from Milton to Ossipee State Government of New Hampshire New Hampshire S&L 3/04/2025 3/27/2025
Scope: Construct permanent grooved durable polyurea pavement markings on I-93 from Plymouth to Thornton State Government of New Hampshire New Hampshire S&L 3/04/2025 3/27/2025
Scope: Culvert replacement, carrying an un-named perennial stream under NH Route 11 State Government of New Hampshire New Hampshire S&L 3/04/2025 3/27/2025
Scope: Pavement marking maintenance via contractor. Limited to stenciled and transverse markings State Government of New Hampshire New Hampshire S&L 2/26/2025 3/20/2025
Scope: Pavement preservation project to keep sections of roadway in pavement preservation mode State Government of New Hampshire New Hampshire S&L 2/26/2025 3/20/2025
Scope: Pavement preservation project to keep the sections of roadway in pavement preservation mode State Government of New Hampshire New Hampshire S&L 2/26/2025 3/20/2025
Scope: Veterans Home Building Addition Addendum 4 State Government of New Hampshire New Hampshire S&L 2/21/2025 2/26/2025
Intersection Improvements at US 202, NH 9 and NH 127 State Government of New Hampshire New Hampshire S&L 2/20/2025 3/13/2025
Scope: Resurfacing various tier 2, 3 and 4 roadways in District 5 Addendum 1 State Government of New Hampshire New Hampshire S&L 2/19/2025 2/25/2025
Scope: Intersection improvements at US 202, NH 9 and NH 127 State Government of New Hampshire New Hampshire S&L 2/19/2025 3/13/2025
Scope: Replace 4' x 4' x 110' concrete box culvert under NH 135, 150' north of Locke Road Addendum 1 State Government of New Hampshire New Hampshire S&L 2/13/2025 2/20/2025
Scope: Resurfacing various tier 2, 3 and 4 roadways in Districts 1, 2 and 3 State Government of New Hampshire New Hampshire S&L 2/10/2025 2/25/2025
Scope: Veterans Home Building Addition Addendum 3 State Government of New Hampshire New Hampshire S&L 2/10/2025 2/26/2025
Scope: Veterans Home Building Addition Addendum 3 State Government of New Hampshire New Hampshire S&L 2/07/2025 2/12/2025
Scope: Veterans Home Building Addition Addendum 2 State Government of New Hampshire New Hampshire S&L 2/06/2025 2/12/2025
Scope: Resurfacing various tier 2, 3 and 4 roadways in Districts 3 and 6 State Government of New Hampshire New Hampshire S&L 2/05/2025 2/27/2025
Scope: Resurfacing various tier 2, 3 and 4 roadways in Districts 1, 2 and 3 State Government of New Hampshire New Hampshire S&L 2/05/2025 2/25/2025
Scope: Resurfacing various tier 2, 3 and 4 roadways in District 5 State Government of New Hampshire New Hampshire S&L 2/05/2025 2/25/2025
Scope: Resurfacing various tier 2, 3 and 4 roadways in Districts 2, 3 and 4 State Government of New Hampshire New Hampshire S&L 2/05/2025 2/27/2025
Bath 44094 .pdf Scope:? Replace 4' x 4' x 110' concrete box culvert under NH 135, 150' north of Locke… State Government of New Hampshire New Hampshire S&L 1/28/2025 2/20/2025
Replace or rehab 4' x 4' x 110' concerete box culvert under NH 135, 150' north of Locke Rd. State Government of New Hampshire New Hampshire S&L 1/28/2025 2/20/2025
Scope: Reconstruct Weigh-in-Motion Systems on I-93 in Salem on the mainline and at Windham Weigh Stations State Government of New Hampshire New Hampshire S&L 1/22/2025 2/13/2025
Scope: Slope stabilization that includes residential building demolition State Government of New Hampshire New Hampshire S&L 1/14/2025 2/06/2025
Scope: Turnpike statewide striping State Government of New Hampshire New Hampshire S&L 1/10/2025 1/30/2025
Scope: Veterans Home Building Addition State Government of New Hampshire New Hampshire S&L 1/09/2025 2/12/2025
Lancaster 81240RB Scope: Storage building replacement Addendum 1 State Government of New Hampshire New Hampshire S&L 1/03/2025 1/08/2025
Scope: Central Turnpike paving I-93 Turnpike & FEET Ramps State Government of New Hampshire New Hampshire S&L 12/16/2024 12/19/2024
Scope: Patrol Shed Replacement Addendum 3 State Government of New Hampshire New Hampshire S&L 12/13/2024 12/18/2024
Lancaster 81240RB .pdf Scope:? Storage building replacement State Government of New Hampshire New Hampshire S&L 12/11/2024 1/08/2025
Bridge Replacement of culvert carrying NH 125 over Little River Br No 073/084 State Government of New Hampshire New Hampshire S&L 12/10/2024 12/12/2024
Bridge Replacement of culvert carrying NH 125 over Little River Br No 073/084 State Government of New Hampshire New Hampshire S&L 12/06/2024 12/12/2024
Scope: Construction of courthouse Addendum 6? State Government of New Hampshire New Hampshire S&L 11/27/2024 12/04/2024
Londonderry 81267RD Scope: Patrol Shed Replacement Addendum 1 State Government of New Hampshire New Hampshire S&L 11/26/2024 12/18/2024
Scope: Central Turnpike paving I-92 Turnpike & FEET Ramps State Government of New Hampshire New Hampshire S&L 11/25/2024 12/19/2024
Scope: Installation of inductive loops for traffic monitoring detection State Government of New Hampshire New Hampshire S&L 11/25/2024 12/19/2024
Scope:? Patrol Shed replacement State Government of New Hampshire New Hampshire S&L 11/20/2024 12/18/2024
LONDONDERRY 512 - PATROL SHED REPLACEMENT State Government of New Hampshire New Hampshire S&L 11/20/2024 12/18/2024
Lee 41322 .pdf Scope:? Bridge replacement of culvert carrying NH 125 over Little River State Government of New Hampshire New Hampshire S&L 11/19/2024 12/12/2024
Bridge Replacement of culvert carrying NH 125 over Little River Br No 073/084 State Government of New Hampshire New Hampshire S&L 11/19/2024 12/12/2024
Scope: Pavement preservation project to keep the sections of roadway in pavement preservation mode State Government of New Hampshire New Hampshire S&L 11/13/2024 12/05/2024
Scope: Reconfigure "Dog-Leg" intersection of US 202, NH 124 and NH 137 Addendum 3 State Government of New Hampshire New Hampshire S&L 11/08/2024 11/14/2024
Preservation of 4 bridges in Littleton carrying I-93 over Ammonoosuc River & NHRR(ABD) Addendum 1 State Government of New Hampshire New Hampshire S&L 11/07/2024 11/14/2024
Scope: NH 15 Spaulding Turnpike paving Addendum 1 State Government of New Hampshire New Hampshire S&L 11/07/2024 11/14/2024
Scope: Construction of courthouse Addendum 3 State Government of New Hampshire New Hampshire S&L 11/06/2024 11/20/2024
Scope: Guardrail upgrades in Hinsdale, Winchester & Fitzwilliam, Routes 10, 12 & 119 Addendum 1 State Government of New Hampshire New Hampshire S&L 10/31/2024 11/07/2024
Scope: Construction of courthouse Addendum 2 State Government of New Hampshire New Hampshire S&L 10/31/2024 11/20/2024
Scope: Reconfigure "Dog-Leg" intersection of US 202, NH 124 and NH 137 Addendum 2 State Government of New Hampshire New Hampshire S&L 10/31/2024 11/14/2024
Scope: NH123A culvert replacement and roadway repairs State Government of New Hampshire New Hampshire S&L 10/30/2024 11/21/2024
Scope: Construction of courthouse Addendum 1 State Government of New Hampshire New Hampshire S&L 10/29/2024 11/06/2024
Scope: Pavement preservation along NH 101 in Auburn and Candia Addendum 2 State Government of New Hampshire New Hampshire S&L 10/29/2024 10/31/2024
Scope: Resurfacing I-89 in Enfield and Lebanon Addendum 1 State Government of New Hampshire New Hampshire S&L 10/24/2024 10/31/2024
Scope: Pavement preservation along NH 101 in Auburn and Candia Addendum 1 State Government of New Hampshire New Hampshire S&L 10/24/2024 10/31/2024
Scope: NH 15 Spaulding Turnpike paving State Government of New Hampshire New Hampshire S&L 10/23/2024 11/14/2024
Scope: Reconfigure "Dog-Leg" intersection of US 202, NH 124 and NH 137 Addendum 1 State Government of New Hampshire New Hampshire S&L 10/23/2024 10/31/2024
Preservation of 4 bridges in Littleton carrying I-93 over Ammonoosuc River and NHRR(ABD). State Government of New Hampshire New Hampshire S&L 10/17/2024 11/14/2024
Safety & operational improvements to Row's Corner (Maple Ave, Amesbury Rd intersection)(~.1m) State Government of New Hampshire New Hampshire S&L 10/17/2024 10/24/2024
Hinsdale-Winchester-Fitzwilliam 44187 .pdf Scope: Guardrail upgrades in Hinsdale, Winchester & Fitzwilliam, Routes 10, 12 & 119 State Government of New Hampshire New Hampshire S&L 10/15/2024 11/07/2024
Scope: Preservation of 4 bridges in Littleton carrying I-93 over Ammonoosuc River & NHRR(ABD) State Government of New Hampshire New Hampshire S&L 10/15/2024 11/14/2024
Scope: Resurfacing I-89 in Enfield and Lebanon State Government of New Hampshire New Hampshire S&L 10/09/2024 10/31/2024
Scope: Pavement preservation along NH 101 in Auburn and Candia State Government of New Hampshire New Hampshire S&L 10/09/2024 10/31/2024
Scope: Reconfigure "Dog-Leg" intersection of US 202, NH 124 and NH 137 State Government of New Hampshire New Hampshire S&L 10/04/2024 10/31/2024
Scope: Resurfacing of sections of NH 11, NH 25, and NH 118 State Government of New Hampshire New Hampshire S&L 10/02/2024 10/24/2024
Scope: Construction of courthouse State Government of New Hampshire New Hampshire S&L 10/02/2024 11/06/2024
Scope: Safety & operational improvements to Row's Corner (Maple Ave, Amesbury Road intersection State Government of New Hampshire New Hampshire S&L 10/02/2024 10/24/2024