| Scope: Bridge preservation for two bridges on the circumferential highway over the Merrimack River and CSX railroad. Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
7/02/2026 |
7/09/2026 |
| Scope: Bridge preservation for two bridges on the circumferential highway over the Merrimack River and CSX railroad. |
State Government of New Hampshire |
New Hampshire |
S&L |
6/16/2026 |
7/09/2026 |
| Scope: Convert Intersections into All-Way Stops |
State Government of New Hampshire |
New Hampshire |
S&L |
6/04/2026 |
6/25/2026 |
| Scope: Culvert replacement of an approximate 4x4 concrete/stone box culvert. |
State Government of New Hampshire |
New Hampshire |
S&L |
6/02/2026 |
6/11/2026 |
| Scope: Culvert replacement of an approximate 4x4 concrete/stone box culvert. |
State Government of New Hampshire |
New Hampshire |
S&L |
5/20/2026 |
6/11/2026 |
| Scope: Replacement of culverts conveying normal tidal flows under Squamscott Road with concrete box culverts. Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
5/15/2026 |
5/21/2026 |
| Replacement of culverts conveying normal tidal flows under Squamscott Road with concrete box culverts. |
State Government of New Hampshire |
New Hampshire |
S&L |
5/12/2026 |
5/21/2026 |
| Scope: Replacement of culverts conveying normal tidal flows under Squamscott Road with concrete box culverts. |
State Government of New Hampshire |
New Hampshire |
S&L |
4/28/2026 |
5/21/2026 |
| Scope: Repair damaged beam guardrail on the Central & Eastern Turnpike Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/20/2026 |
5/07/2026 |
| Scope: Repair damaged beam guardrail on Tier 1 roadways within District 2 & 5. |
State Government of New Hampshire |
New Hampshire |
S&L |
4/14/2026 |
5/07/2026 |
| Scope: Repair damaged beam guardrail on the Central & Eastern Turnpike. |
State Government of New Hampshire |
New Hampshire |
S&L |
4/14/2026 |
5/07/2026 |
| Scope: Repair damaged beam guardrail on Tier 1 roadways in Districts 1 & 3. |
State Government of New Hampshire |
New Hampshire |
S&L |
4/14/2026 |
5/07/2026 |
| Statewide Tier 2 Resurfacing (north) 45071 .pdf Scope: Resurfacing various tier 2 roadways. |
State Government of New Hampshire |
New Hampshire |
S&L |
4/07/2026 |
4/30/2026 |
| Scope: Rehabilitation of the bridge carrying NH Route 12 over NHRR, bridge replacement of the bridge carrying NH 12 over… |
State Government of New Hampshire |
New Hampshire |
S&L |
4/07/2026 |
4/09/2026 |
| Scope: Rehabilitation of the bridge carrying NH Route 12 over NHRR, bridge replacement of the bridge carrying NH 12 over… |
State Government of New Hampshire |
New Hampshire |
S&L |
4/03/2026 |
4/09/2026 |
| Scope: Rehabilitation of the bridge carrying NH Route 12 over NHRR, bridge replacement of the bridge carrying NH 12 over… |
State Government of New Hampshire |
New Hampshire |
S&L |
4/01/2026 |
4/09/2026 |
| Scope: Removal and replacement of box beam guardrail with doubled faced thrie beam guardrail and updated end units. |
State Government of New Hampshire |
New Hampshire |
S&L |
3/25/2026 |
4/16/2026 |
| Scope: Rehabilitation of the bridge carrying NH Route 12 over NHRR, bridge replacement of the bridge carrying NH 12 over… |
State Government of New Hampshire |
New Hampshire |
S&L |
3/17/2026 |
4/09/2026 |
| Scope: Painting the steel beam bridges carrying Walnut Avenue over I-95 NB & SB, Post Road over I-95 NB &… |
State Government of New Hampshire |
New Hampshire |
S&L |
3/13/2026 |
3/26/2026 |
| Scope: Crack sealing various tier 2 roads through the central & eastern part of the State. Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
3/12/2026 |
3/26/2026 |
| Scope: Reconstruct NH123A roadway and slope stabilization, repair damage resulting from 2021 storm events. Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
3/10/2026 |
3/19/2026 |
| Painting bridges: N. Hampton 078/070, N. Hampton 089/123; I-95 Bridge Painting |
State Government of New Hampshire |
New Hampshire |
S&L |
3/03/2026 |
3/19/2026 |
| Crack sealing various Tier 2 roads through the central and eastern part of the State. |
State Government of New Hampshire |
New Hampshire |
S&L |
3/03/2026 |
3/26/2026 |
| NH 123A Roadway and slope stabilization repair at approximately MM 2.0 (B58 project storm STM77350); NH 123A Roadway and slope… |
State Government of New Hampshire |
New Hampshire |
S&L |
3/02/2026 |
3/19/2026 |
| Reconstruct NH123A roadway and slope stabilization, repair damage resulting from 2021 storm events. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/25/2026 |
3/19/2026 |
| Painting the steel beam bridges carrying Walnut Avenue over I-95 NB & SB, Post Road over I-95 NB & SB… |
State Government of New Hampshire |
New Hampshire |
S&L |
2/25/2026 |
3/19/2026 |
| Constructing a new vehicle fueling facility and removing the existing fueling facility on NH 10 at the Marlow Shed Addendum… |
State Government of New Hampshire |
New Hampshire |
S&L |
2/19/2026 |
2/26/2026 |
| Pavement marking maintenance via contractor. Limited to stenciled and transverse markings |
State Government of New Hampshire |
New Hampshire |
S&L |
2/19/2026 |
3/12/2026 |
| Constructing a new vehicle fueling facility and removing the existing fueling facility on NH 10 at the Marlow Shed Addendum… |
State Government of New Hampshire |
New Hampshire |
S&L |
2/13/2026 |
2/26/2026 |
| Scope: Resurfacing various 2, 3 and 4 roadways in District 5. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/13/2026 |
2/24/2026 |
| High mast light conversions to LED Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/13/2026 |
2/19/2026 |
| Constructing a new vehicle fueling facility and removing the existing fueling facility on NH 10 at the Marlow Shed Addendum… |
State Government of New Hampshire |
New Hampshire |
S&L |
2/12/2026 |
2/19/2026 |
| Resurfacing various tier 2, 3 and 4 roadways in District 1. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/06/2026 |
2/24/2026 |
| Resurfacing various tier 2, 3 and 4 roadways in District 4. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/06/2026 |
3/03/2026 |
| Resurfacing various tier 2, 3 and 4 roadways in District 3. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/06/2026 |
3/03/2026 |
| High mast light conversions to LED Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/05/2026 |
2/12/2026 |
| Resurfacing various tier 2, 3 and 4 roadways in District 4. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/04/2026 |
3/03/2026 |
| Resurfacing various 2, 3 and 4 roadways in District 4. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/04/2026 |
3/03/2026 |
| Resurfacing various tier 2, 3 and 4 roadways in District 1. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/04/2026 |
2/24/2026 |
| Resurfacing various 2, 3 and 4 roadways in District 5. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/04/2026 |
2/24/2026 |
| Resurfacing various tier 2, 3 and 4 roadways in District 2. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/04/2026 |
2/26/2026 |
| Resurfacing various 2, 3 and 4 roadways in District 5. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/04/2026 |
2/24/2026 |
| Resurfacing various tier 2, 3 and 4 roadways in District 6. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/04/2026 |
2/26/2026 |
| Resurfacing various tier 2, 3 and 4 roadways in District 2. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/04/2026 |
2/26/2026 |
| Resurfacing various 2, 3 and 4 roadways in District 6. |
State Government of New Hampshire |
New Hampshire |
S&L |
2/04/2026 |
2/26/2026 |
| Replace 2 bridges - NH 11 over NHRR(ABD) (206/137) and NH 11 over Sucker Brook (208/137). Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
1/30/2026 |
2/05/2026 |
| High mast light conversions to LED |
State Government of New Hampshire |
New Hampshire |
S&L |
1/29/2026 |
2/12/2026 |
| Rehabilitation of 84" cmp under NH 9 just east of Exit 3 I-393, and 84" cmp under NH 106 just… |
State Government of New Hampshire |
New Hampshire |
S&L |
1/28/2026 |
1/29/2026 |
| Constructing a new vehicle fueling facility and removing the existing fueling facility on NH 10 at the Marlow Shed |
State Government of New Hampshire |
New Hampshire |
S&L |
1/27/2026 |
2/19/2026 |
| Scope: Rehabilitation of 84" cmp under NH 9 just east of Exit 3 I-393, and 84" cmp under NH 106… |
State Government of New Hampshire |
New Hampshire |
S&L |
1/22/2026 |
1/29/2026 |
| High mast light conversions to LED |
State Government of New Hampshire |
New Hampshire |
S&L |
1/21/2026 |
2/12/2026 |
| Replace 2 bridges - NH 11 over NHRR(ABD) (206/137) and NH 11 over Sucker Brook (208/137). |
State Government of New Hampshire |
New Hampshire |
S&L |
1/14/2026 |
2/05/2026 |
| Placement of approximately 2.4 million feet of pavement markings along the Turnpike system. |
State Government of New Hampshire |
New Hampshire |
S&L |
1/14/2026 |
2/05/2026 |
| Rehabilitation of 84" cmp under NH 9 just east of Exit 3 I-393, and 84" cmp under NH 106 just… |
State Government of New Hampshire |
New Hampshire |
S&L |
1/06/2026 |
1/29/2026 |
| Construction of new traffic monitoring locations for SMART Grant demonstration project using i-LST |
State Government of New Hampshire |
New Hampshire |
S&L |
12/15/2025 |
12/18/2025 |
| Scope: Resurfacing various Tiet 2 roadways Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
12/05/2025 |
12/18/2025 |
| Scope: Removal of New Hampton Bridge located on Jackson Pond Road over NHRR, historically known as Smith's Crossing Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
12/03/2025 |
12/11/2025 |
| Scope: Construction of new traffic monitoring locations for SMART Grant demonstration project using i-LST |
State Government of New Hampshire |
New Hampshire |
S&L |
11/26/2025 |
12/18/2025 |
| Scope: Resurfacing various Tiet 2 roadways |
State Government of New Hampshire |
New Hampshire |
S&L |
11/26/2025 |
12/18/2025 |
| Scope: Resurfacing six sections on the F.E. Everett Turnpike in Nashua and Merrimack |
State Government of New Hampshire |
New Hampshire |
S&L |
11/19/2025 |
12/11/2025 |
| Scope: Removal of New Hampton Bridge located on Jackson Pond Road over NHRR, historically known as Smith's Crossing |
State Government of New Hampshire |
New Hampshire |
S&L |
11/19/2025 |
12/11/2025 |
| Score: Resurfacing and preservation of various roadway sections on the Eastern Turnpike located on I-95 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/19/2025 |
12/11/2025 |
| Scope: Replace Wire Road and Baboosic Lake Road Bridges over the FE Everett Turnpike Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/19/2025 |
11/20/2025 |
| Scope: Pavement resurfacing on one section along I-93 northbound in Manchester & Hooksett in District 5 - Addendum 6 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/17/2025 |
11/20/2025 |
| Scope: Pavement resurfacing on one section along I-93 northbound in Manchester & Hooksett in District 5 Addendum 5 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/14/2025 |
11/20/2025 |
| Scope: Replace Wire Road and Baboosic Lake Road Bridges over the FE Everett Turnpike Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/14/2025 |
11/20/2025 |
| Resurfacing NB I-93 from Exit 6 northerly to I-293. Includes interchanges 6, 7, 8, 9, 10, and I-293 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/07/2025 |
11/13/2025 |
| Scope: Pavement resurfacing on one section along I-93 northbound in Manchester & Hooksett in District 5 Addendum 3 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/06/2025 |
11/20/2025 |
| Scope: Replace Wire Road and Baboosic Lake Road Bridges over the FE Everett Turnpike Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/06/2025 |
11/20/2025 |
| Scope: Pavement resurfacing on two sections in four towns in District 3. Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/05/2025 |
11/13/2025 |
| Scope: Pavement resurfacing on one section along I-93 northbound in Manchester & Hooksett in District 5 Addendum 3 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/05/2025 |
11/13/2025 |
| Scope: Pavement rehabilitation located along I-93 in Franconia Addendum 4 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/03/2025 |
11/06/2025 |
| Scope:? Replace Wire Road and Baboosic Lake Road Bridges over the FE Everett Turnpike |
State Government of New Hampshire |
New Hampshire |
S&L |
10/29/2025 |
11/20/2025 |
| Scope: Pavement rehabilitation located along I-93 in Franconia Addendum 3 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/28/2025 |
11/06/2025 |
| Scope: Pavement rehabilitation located along I-93 in Franconia Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/24/2025 |
10/30/2025 |
| Scope: Pavement resurfacing on one section along I-93 northbound in Manchester & Hooksett in District 5 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/22/2025 |
11/13/2025 |
| Scope: Pavement resurfacing on two sections in four towns in District 3. Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/22/2025 |
11/13/2025 |
| Scope: Pavement rehabilitation located along I-93 in Franconia Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/16/2025 |
10/30/2025 |
| Scope: Resurfacing of Tier 1 roadway locations along I-93 in the Towns of Salem, Windham, Derry and Londonderry Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/15/2025 |
10/16/2025 |
| Scope: Pavement resurfacing on four sections in five Towns in Districts 3 & 5 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/15/2025 |
11/06/2025 |
| Scope: Resurfacing of Tier 1 roadways in Towns in Districts 3 and 5 Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/13/2025 |
10/16/2025 |
| Scope: Resurfacing of Tier 1 roadways in Towns in Districts 3 and 5 Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/09/2025 |
10/16/2025 |
| Scope: Resurfacing of Tier 1 roadway locations along I-93 in the Towns of Salem, Windham, Derry and Londonderry Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/09/2025 |
10/16/2025 |
| Scope: Signalize the intersection of NH Route 106 with South Village Road and Chichester Road Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/08/2025 |
10/09/2025 |
| Scope: Pavement resurfacing of two sections in for towns in District 2 and 4 Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/07/2025 |
10/09/2025 |
| Pavement preservation project to keep these sections of roadway in pavement preservation mode |
State Government of New Hampshire |
New Hampshire |
S&L |
10/06/2025 |
10/09/2025 |
| Intersection Improvements |
State Government of New Hampshire |
New Hampshire |
S&L |
10/03/2025 |
10/09/2025 |
| Rehab (4R) of I-93 from MM 111.6 (south of Exit 35) to MM 116.1. Includes ramps at 35, 36, &… |
State Government of New Hampshire |
New Hampshire |
S&L |
10/02/2025 |
10/23/2025 |
| Scope: Pavement rehabilitation located along I-93 in Franconia |
State Government of New Hampshire |
New Hampshire |
S&L |
9/30/2025 |
10/23/2025 |
| Scope: Bridge preservation that carries NH 132 (East Side Drive) over I-393, US 202 and US 4 |
State Government of New Hampshire |
New Hampshire |
S&L |
9/30/2025 |
10/23/2025 |
| Scope: Replacement of cable guardrail and other guardrail upgrades on US Route 3 in Pittsburg |
State Government of New Hampshire |
New Hampshire |
S&L |
9/30/2025 |
10/23/2025 |
| Scope: Construct permanent grooved durable pavement markings on I-93 from Tilton to Ashland Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
9/26/2025 |
10/02/2025 |
| Scope: Reconstruction and widening of NH Route 125 Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
9/26/2025 |
10/02/2025 |
| Scope: Address preservation needs for the Rockingham Flyover Bridge carrying Rockingham Mall Entrance Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
9/26/2025 |
10/02/2025 |
| Scope: Resurfacing of Tier 1 roadway locations along I-93 in the Towns of Salem, Windham, Derry and Londonderry |
State Government of New Hampshire |
New Hampshire |
S&L |
9/24/2025 |
10/16/2025 |
| Scope: Resurfacing of Tier 1 roadways in Towns in Districts 3 and 5 |
State Government of New Hampshire |
New Hampshire |
S&L |
9/24/2025 |
10/16/2025 |
| Scope: Pavement resurfacing of two sections in for towns in District 2 and 4 |
State Government of New Hampshire |
New Hampshire |
S&L |
9/24/2025 |
10/09/2025 |
| Intersection Improvements |
State Government of New Hampshire |
New Hampshire |
S&L |
9/22/2025 |
10/09/2025 |
| Scope: Signalize the intersection of NH Route 106 with South Village Road and Chichester Road |
State Government of New Hampshire |
New Hampshire |
S&L |
9/18/2025 |
10/09/2025 |
| Scope: Pavement resurfacing of two sections in for towns in District 2 and 4 |
State Government of New Hampshire |
New Hampshire |
S&L |
9/17/2025 |
10/09/2025 |
| Preservation of 4 bridges in Littleton carrying I-93 over Ammonoosuc River and NHRR (ASBD) (Note: This is a three (3)… |
State Government of New Hampshire |
New Hampshire |
S&L |
9/17/2025 |
9/25/2025 |
| Scope: Construct permanent grooved durable pavement markings on I-93 from Tilton to Ashland Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
9/16/2025 |
9/18/2025 |
| Scope: Operational and safety improvements at the intersection of NH 28 & Stonehenge Road Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
9/10/2025 |
9/18/2025 |
| Scope: Reconstruction and widening of NH Route 125 |
State Government of New Hampshire |
New Hampshire |
S&L |
9/10/2025 |
10/02/2025 |
| Scope: Address preservation needs for the Rockingham Flyover Bridge carrying Rockingham Mall Entrance |
State Government of New Hampshire |
New Hampshire |
S&L |
9/10/2025 |
10/02/2025 |
| Scope: Replacement of stone box culvert under NH 109A, just north of Willow Avenue |
State Government of New Hampshire |
New Hampshire |
S&L |
9/10/2025 |
10/02/2025 |
| Scope:? Preservation of 4 bridges in Littleton carrying I-93 over Ammonoosuc River and NHRR (ASBD)? ?( Note: This is a… |
State Government of New Hampshire |
New Hampshire |
S&L |
9/02/2025 |
9/25/2025 |
| Scope: Operational and safety improvements at the intersection of NH 28 & Stonehenge Road |
State Government of New Hampshire |
New Hampshire |
S&L |
8/27/2025 |
9/18/2025 |
| Scope: Construct permanent grooved durable pavement markings on I-93 from Tilton to Ashland |
State Government of New Hampshire |
New Hampshire |
S&L |
8/27/2025 |
9/18/2025 |
| Scope: NH Veterans home replace three air handling units Addendum 5 |
State Government of New Hampshire |
New Hampshire |
S&L |
8/19/2025 |
8/27/2025 |
| Tilton 81358B Scope: NH Veterans home replace three air handling units Addendum 4 |
State Government of New Hampshire |
New Hampshire |
S&L |
8/13/2025 |
8/20/2025 |
| Scope: NH Veterans home replace three air handling units Addendum 3 |
State Government of New Hampshire |
New Hampshire |
S&L |
8/07/2025 |
8/20/2025 |
| Scope: NH Veterans home replace three air handling units Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
8/06/2025 |
8/13/2025 |
| Scope: Remove the superstructure of the existing General Sullivan Bridge Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
8/04/2025 |
8/21/2025 |
| Scope: Preservation efforts on 2-span bridge carrying NH 107 over Lamprey River |
State Government of New Hampshire |
New Hampshire |
S&L |
7/29/2025 |
8/21/2025 |
| Install median barrier on I-95 from MM 8.0 to MM 13.0 |
State Government of New Hampshire |
New Hampshire |
S&L |
7/25/2025 |
7/31/2025 |
| Scope: NH Veterans home replace three air handling units Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
7/23/2025 |
8/13/2025 |
| Scope: NH Veterans home replace three air handling units |
State Government of New Hampshire |
New Hampshire |
S&L |
7/15/2025 |
8/13/2025 |
| Replcmt of 13' jack arch bridge at Pricilla Bk. 140/097 and 48" cmp/4x4 conc box just to the south |
State Government of New Hampshire |
New Hampshire |
S&L |
7/10/2025 |
7/17/2025 |
| Scope: Install median barrier on I-95 from MM 8.0 to 13.0 |
State Government of New Hampshire |
New Hampshire |
S&L |
7/08/2025 |
7/31/2025 |
| Scope: Signal pole and mast arm replacement, US Route 1 & Ocean Road |
State Government of New Hampshire |
New Hampshire |
S&L |
7/08/2025 |
7/31/2025 |
| Scope: Remove the superstructure of the existing General Sullivan Bridge Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
7/01/2025 |
8/11/2025 |
| Reconstruction of the roadway damaged by slope failure due to heavy rain event |
State Government of New Hampshire |
New Hampshire |
S&L |
6/24/2025 |
6/26/2025 |
| Scope: Remove the superstructure of the existing General Sullivan Bridge |
State Government of New Hampshire |
New Hampshire |
S&L |
6/23/2025 |
8/11/2025 |
| Scope:? Replacement of 13' jack arch bridge at Pricilla Bk. 140/097 and 48" cmp/4x4 concrete box just to the south |
State Government of New Hampshire |
New Hampshire |
S&L |
6/23/2025 |
7/17/2025 |
| Score: Turnpike guardrail on Blue Star and Spaulding Turnpike. 43 locations with about 23,500 LF of GR |
State Government of New Hampshire |
New Hampshire |
S&L |
6/17/2025 |
7/10/2025 |
| Sunapee 44438A Scope: Reconstruction of the roadway damaged by slope failure due to heavy rain event Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
6/12/2025 |
6/26/2025 |
| Scope: Resurfacing of various tier 2, 3 and 4 roadways in District 3 and 6 Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
6/05/2025 |
6/12/2025 |
| Scope: Reconstruction of the roadway damaged by slope failure due to heavy rain event |
State Government of New Hampshire |
New Hampshire |
S&L |
6/04/2025 |
6/26/2025 |
| Scope:? Construction the NH Seacoast Greenway, from Drakeside Road north to the Hampton/North Hampton town line |
State Government of New Hampshire |
New Hampshire |
S&L |
5/27/2025 |
6/19/2025 |
| Scope: Construct salt storage building Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
5/22/2025 |
5/28/2025 |
| Scope: Resurfacing of various tier 2, 3 and 4 roadways in District 3 and 6 |
State Government of New Hampshire |
New Hampshire |
S&L |
5/22/2025 |
6/12/2025 |
| Scope: Resurfacing of various tier 2, 3 and 4 roadways in District 3 and 6 |
State Government of New Hampshire |
New Hampshire |
S&L |
5/20/2025 |
6/12/2025 |
| Scope: Install median barrier on I-95 from MM 8.0 to MM 13.0 Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
5/20/2025 |
5/29/2025 |
| Scope: Construct salt storage building Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
5/20/2025 |
5/28/2025 |
| Scope: Turnpike drainage replacing 7 pipes at 6 locations on Spaulding TPK in Milton Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
5/16/2025 |
5/22/2025 |
| Scope: Replacement of 3 cmp pipes under NH 124 at Perkins Pond |
State Government of New Hampshire |
New Hampshire |
S&L |
5/08/2025 |
5/29/2025 |
| Scope: Install median barrier on I-95 from MM 8.0 to MM 13.0 |
State Government of New Hampshire |
New Hampshire |
S&L |
5/07/2025 |
5/29/2025 |
| Scope: Replacement of a crossing 3 cmp pipes under Route 124 at Perkins Pond |
State Government of New Hampshire |
New Hampshire |
S&L |
5/07/2025 |
5/29/2025 |
| Scope: Construct salt storage building |
State Government of New Hampshire |
New Hampshire |
S&L |
5/07/2025 |
5/28/2025 |
| Turnpike Drainage replacing 7 pipes at 6 location on Spaulding Tpk. in Milton |
State Government of New Hampshire |
New Hampshire |
S&L |
4/30/2025 |
5/22/2025 |
| Scope: Turnpike drainage replacing 7 pipes at 6 locations on Spaulding TPK in Milton |
State Government of New Hampshire |
New Hampshire |
S&L |
4/29/2025 |
5/22/2025 |
| Scope: Fuel system replacement at Jefferson Patrol Shed #108 Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/21/2025 |
4/24/2025 |
| Scope: Fuel system replacement at Jefferson Patrol Shed #108 Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/16/2025 |
4/24/2025 |
| Scope: Bridge washing along Turnpikes & District Roads Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/16/2025 |
5/01/2025 |
| Scope: Entry life safety improvements Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/14/2025 |
4/16/2025 |
| Scope: Replace red listed bridge carrying NH 152 over North River Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/10/2025 |
4/17/2025 |
| Scope: Bridge washing along Turnpikes & District Roads |
State Government of New Hampshire |
New Hampshire |
S&L |
4/08/2025 |
5/01/2025 |
| Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts I & III Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/07/2025 |
4/10/2025 |
| Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts II & III Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/07/2025 |
4/10/2025 |
| Scope: Resurfacing of various tier 2, 3 & 4 roadways in Districts II & IV Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/07/2025 |
4/10/2025 |
| Scope: NH Hospital replace underground storage tanks Addendum 3 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/07/2025 |
4/09/2025 |
| Scope: NH Hospital replace underground storage tanks Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/04/2025 |
4/09/2025 |
| Scope: Fuel system replacement at Jefferson Patrol Shed #108 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/01/2025 |
4/24/2025 |
| Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts I & III Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/01/2025 |
4/10/2025 |
| Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts II & III Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
4/01/2025 |
4/10/2025 |
| Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts I & III |
State Government of New Hampshire |
New Hampshire |
S&L |
3/28/2025 |
4/10/2025 |
| Scope: Rebid NHSP door and celling replacement Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
3/28/2025 |
4/23/2025 |
| Scope: Replace red listed bridge carrying NH 152 over North River |
State Government of New Hampshire |
New Hampshire |
S&L |
3/26/2025 |
4/17/2025 |
| Scope: Entry life safety improvements |
State Government of New Hampshire |
New Hampshire |
S&L |
3/26/2025 |
4/16/2025 |
| Scope: NH Hospital replace underground storage tanks Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
3/20/2025 |
4/02/2025 |
| Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts I & III |
State Government of New Hampshire |
New Hampshire |
S&L |
3/18/2025 |
4/10/2025 |
| Scope: Resurfacing of various tier 2, 3 and 4 roadways in Districts II & III |
State Government of New Hampshire |
New Hampshire |
S&L |
3/18/2025 |
4/10/2025 |
| Scope: Resurfacing of various tier 2, 3 & 4 roadways in Districts II & IV |
State Government of New Hampshire |
New Hampshire |
S&L |
3/18/2025 |
4/10/2025 |
| Scope: Pavement preservation project to keep sections of roadway in pavement preservation mode Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
3/13/2025 |
3/20/2025 |
| Scope: Pavement preservation project to keep the sections of roadway in pavement preservation mode Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
3/13/2025 |
3/20/2025 |
| Scope: NH Hospital replace underground storage tanks |
State Government of New Hampshire |
New Hampshire |
S&L |
3/12/2025 |
4/02/2025 |
| Scope: Thayer Building roof replacement |
State Government of New Hampshire |
New Hampshire |
S&L |
3/12/2025 |
4/02/2025 |
| Scope: Rebid NHSP door and celling replacement |
State Government of New Hampshire |
New Hampshire |
S&L |
3/12/2025 |
4/02/2025 |
| Scope: Pavement marking maintenance via contractor. Limited to stenciled and transverse markings |
State Government of New Hampshire |
New Hampshire |
S&L |
3/12/2025 |
3/20/2025 |
| Scope: Installation of sinusoidal rumble strips along NH 16 |
State Government of New Hampshire |
New Hampshire |
S&L |
3/11/2025 |
4/03/2025 |
| Scope: Intersection improvements at US 202, NH 9 and NH 127 Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
3/06/2025 |
3/13/2025 |
| Scope: Pavement preservation project to keep sections of roadway in pavement preservation mode |
State Government of New Hampshire |
New Hampshire |
S&L |
3/04/2025 |
3/20/2025 |
| Scope: Construct permanent grooved durable polyurea pavement markings on NH 16 from Milton to Ossipee |
State Government of New Hampshire |
New Hampshire |
S&L |
3/04/2025 |
3/27/2025 |
| Scope: Construct permanent grooved durable polyurea pavement markings on I-93 from Plymouth to Thornton |
State Government of New Hampshire |
New Hampshire |
S&L |
3/04/2025 |
3/27/2025 |
| Scope: Culvert replacement, carrying an un-named perennial stream under NH Route 11 |
State Government of New Hampshire |
New Hampshire |
S&L |
3/04/2025 |
3/27/2025 |
| Scope: Pavement marking maintenance via contractor. Limited to stenciled and transverse markings |
State Government of New Hampshire |
New Hampshire |
S&L |
2/26/2025 |
3/20/2025 |
| Scope: Pavement preservation project to keep sections of roadway in pavement preservation mode |
State Government of New Hampshire |
New Hampshire |
S&L |
2/26/2025 |
3/20/2025 |
| Scope: Pavement preservation project to keep the sections of roadway in pavement preservation mode |
State Government of New Hampshire |
New Hampshire |
S&L |
2/26/2025 |
3/20/2025 |
| Scope: Veterans Home Building Addition Addendum 4 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/21/2025 |
2/26/2025 |
| Intersection Improvements at US 202, NH 9 and NH 127 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/20/2025 |
3/13/2025 |
| Scope: Resurfacing various tier 2, 3 and 4 roadways in District 5 Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/19/2025 |
2/25/2025 |
| Scope: Intersection improvements at US 202, NH 9 and NH 127 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/19/2025 |
3/13/2025 |
| Scope: Replace 4' x 4' x 110' concrete box culvert under NH 135, 150' north of Locke Road Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/13/2025 |
2/20/2025 |
| Scope: Resurfacing various tier 2, 3 and 4 roadways in Districts 1, 2 and 3 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/10/2025 |
2/25/2025 |
| Scope: Veterans Home Building Addition Addendum 3 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/10/2025 |
2/26/2025 |
| Scope: Veterans Home Building Addition Addendum 3 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/07/2025 |
2/12/2025 |
| Scope: Veterans Home Building Addition Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/06/2025 |
2/12/2025 |
| Scope: Resurfacing various tier 2, 3 and 4 roadways in Districts 3 and 6 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/05/2025 |
2/27/2025 |
| Scope: Resurfacing various tier 2, 3 and 4 roadways in Districts 1, 2 and 3 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/05/2025 |
2/25/2025 |
| Scope: Resurfacing various tier 2, 3 and 4 roadways in District 5 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/05/2025 |
2/25/2025 |
| Scope: Resurfacing various tier 2, 3 and 4 roadways in Districts 2, 3 and 4 |
State Government of New Hampshire |
New Hampshire |
S&L |
2/05/2025 |
2/27/2025 |
| Bath 44094 .pdf Scope:? Replace 4' x 4' x 110' concrete box culvert under NH 135, 150' north of Locke… |
State Government of New Hampshire |
New Hampshire |
S&L |
1/28/2025 |
2/20/2025 |
| Replace or rehab 4' x 4' x 110' concerete box culvert under NH 135, 150' north of Locke Rd. |
State Government of New Hampshire |
New Hampshire |
S&L |
1/28/2025 |
2/20/2025 |
| Scope: Reconstruct Weigh-in-Motion Systems on I-93 in Salem on the mainline and at Windham Weigh Stations |
State Government of New Hampshire |
New Hampshire |
S&L |
1/22/2025 |
2/13/2025 |
| Scope: Slope stabilization that includes residential building demolition |
State Government of New Hampshire |
New Hampshire |
S&L |
1/14/2025 |
2/06/2025 |
| Scope: Turnpike statewide striping |
State Government of New Hampshire |
New Hampshire |
S&L |
1/10/2025 |
1/30/2025 |
| Scope: Veterans Home Building Addition |
State Government of New Hampshire |
New Hampshire |
S&L |
1/09/2025 |
2/12/2025 |
| Lancaster 81240RB Scope: Storage building replacement Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
1/03/2025 |
1/08/2025 |
| Scope: Central Turnpike paving I-93 Turnpike & FEET Ramps |
State Government of New Hampshire |
New Hampshire |
S&L |
12/16/2024 |
12/19/2024 |
| Scope: Patrol Shed Replacement Addendum 3 |
State Government of New Hampshire |
New Hampshire |
S&L |
12/13/2024 |
12/18/2024 |
| Lancaster 81240RB .pdf Scope:? Storage building replacement |
State Government of New Hampshire |
New Hampshire |
S&L |
12/11/2024 |
1/08/2025 |
| Bridge Replacement of culvert carrying NH 125 over Little River Br No 073/084 |
State Government of New Hampshire |
New Hampshire |
S&L |
12/10/2024 |
12/12/2024 |
| Bridge Replacement of culvert carrying NH 125 over Little River Br No 073/084 |
State Government of New Hampshire |
New Hampshire |
S&L |
12/06/2024 |
12/12/2024 |
| Scope: Construction of courthouse Addendum 6? |
State Government of New Hampshire |
New Hampshire |
S&L |
11/27/2024 |
12/04/2024 |
| Londonderry 81267RD Scope: Patrol Shed Replacement Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/26/2024 |
12/18/2024 |
| Scope: Central Turnpike paving I-92 Turnpike & FEET Ramps |
State Government of New Hampshire |
New Hampshire |
S&L |
11/25/2024 |
12/19/2024 |
| Scope: Installation of inductive loops for traffic monitoring detection |
State Government of New Hampshire |
New Hampshire |
S&L |
11/25/2024 |
12/19/2024 |
| Scope:? Patrol Shed replacement |
State Government of New Hampshire |
New Hampshire |
S&L |
11/20/2024 |
12/18/2024 |
| LONDONDERRY 512 - PATROL SHED REPLACEMENT |
State Government of New Hampshire |
New Hampshire |
S&L |
11/20/2024 |
12/18/2024 |
| Lee 41322 .pdf Scope:? Bridge replacement of culvert carrying NH 125 over Little River |
State Government of New Hampshire |
New Hampshire |
S&L |
11/19/2024 |
12/12/2024 |
| Bridge Replacement of culvert carrying NH 125 over Little River Br No 073/084 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/19/2024 |
12/12/2024 |
| Scope: Pavement preservation project to keep the sections of roadway in pavement preservation mode |
State Government of New Hampshire |
New Hampshire |
S&L |
11/13/2024 |
12/05/2024 |
| Scope: Reconfigure "Dog-Leg" intersection of US 202, NH 124 and NH 137 Addendum 3 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/08/2024 |
11/14/2024 |
| Preservation of 4 bridges in Littleton carrying I-93 over Ammonoosuc River & NHRR(ABD) Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/07/2024 |
11/14/2024 |
| Scope: NH 15 Spaulding Turnpike paving Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/07/2024 |
11/14/2024 |
| Scope: Construction of courthouse Addendum 3 |
State Government of New Hampshire |
New Hampshire |
S&L |
11/06/2024 |
11/20/2024 |
| Scope: Guardrail upgrades in Hinsdale, Winchester & Fitzwilliam, Routes 10, 12 & 119 Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/31/2024 |
11/07/2024 |
| Scope: Construction of courthouse Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/31/2024 |
11/20/2024 |
| Scope: Reconfigure "Dog-Leg" intersection of US 202, NH 124 and NH 137 Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/31/2024 |
11/14/2024 |
| Scope: NH123A culvert replacement and roadway repairs |
State Government of New Hampshire |
New Hampshire |
S&L |
10/30/2024 |
11/21/2024 |
| Scope: Construction of courthouse Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/29/2024 |
11/06/2024 |
| Scope: Pavement preservation along NH 101 in Auburn and Candia Addendum 2 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/29/2024 |
10/31/2024 |
| Scope: Resurfacing I-89 in Enfield and Lebanon Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/24/2024 |
10/31/2024 |
| Scope: Pavement preservation along NH 101 in Auburn and Candia Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/24/2024 |
10/31/2024 |
| Scope: NH 15 Spaulding Turnpike paving |
State Government of New Hampshire |
New Hampshire |
S&L |
10/23/2024 |
11/14/2024 |
| Scope: Reconfigure "Dog-Leg" intersection of US 202, NH 124 and NH 137 Addendum 1 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/23/2024 |
10/31/2024 |
| Preservation of 4 bridges in Littleton carrying I-93 over Ammonoosuc River and NHRR(ABD). |
State Government of New Hampshire |
New Hampshire |
S&L |
10/17/2024 |
11/14/2024 |
| Safety & operational improvements to Row's Corner (Maple Ave, Amesbury Rd intersection)(~.1m) |
State Government of New Hampshire |
New Hampshire |
S&L |
10/17/2024 |
10/24/2024 |
| Hinsdale-Winchester-Fitzwilliam 44187 .pdf Scope: Guardrail upgrades in Hinsdale, Winchester & Fitzwilliam, Routes 10, 12 & 119 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/15/2024 |
11/07/2024 |
| Scope: Preservation of 4 bridges in Littleton carrying I-93 over Ammonoosuc River & NHRR(ABD) |
State Government of New Hampshire |
New Hampshire |
S&L |
10/15/2024 |
11/14/2024 |
| Scope: Resurfacing I-89 in Enfield and Lebanon |
State Government of New Hampshire |
New Hampshire |
S&L |
10/09/2024 |
10/31/2024 |
| Scope: Pavement preservation along NH 101 in Auburn and Candia |
State Government of New Hampshire |
New Hampshire |
S&L |
10/09/2024 |
10/31/2024 |
| Scope: Reconfigure "Dog-Leg" intersection of US 202, NH 124 and NH 137 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/04/2024 |
10/31/2024 |
| Scope: Resurfacing of sections of NH 11, NH 25, and NH 118 |
State Government of New Hampshire |
New Hampshire |
S&L |
10/02/2024 |
10/24/2024 |
| Scope: Construction of courthouse |
State Government of New Hampshire |
New Hampshire |
S&L |
10/02/2024 |
11/06/2024 |
| Scope: Safety & operational improvements to Row's Corner (Maple Ave, Amesbury Road intersection |
State Government of New Hampshire |
New Hampshire |
S&L |
10/02/2024 |
10/24/2024 |