| Direct-Embedded Aluminum Streetlight Poles |
Clark Public Utilities |
Washington |
S&L |
6/29/2026 |
7/17/2026 |
| LED Cobrahead Luminaires |
Clark Public Utilities |
Washington |
S&L |
6/29/2026 |
7/08/2026 |
| SOQ for Water Quality Consultant - Carol J Curtis Wellfield PFAS Pilot Testing |
Clark Public Utilities |
Washington |
S&L |
6/25/2026 |
7/16/2026 |
| Step Voltage Regulators - Single Phase |
Clark Public Utilities |
Washington |
S&L |
6/18/2026 |
7/10/2026 |
| Endpoint Installation Services (EPI) |
Clark Public Utilities |
Washington |
S&L |
6/18/2026 |
8/12/2026 |
| Direct-Embedded Aluminum Streetlight Poles |
Clark Public Utilities |
Washington |
S&L |
6/16/2026 |
7/08/2026 |
| LED Cobrahead Luminaires |
Clark Public Utilities |
Washington |
S&L |
6/12/2026 |
7/01/2026 |
| Community Solar - Port of Ridgefield |
Clark Public Utilities |
Washington |
S&L |
5/13/2026 |
6/05/2026 |
| Envelope Management Program |
Clark Public Utilities |
Washington |
S&L |
4/29/2026 |
5/08/2026 |
| Ellsworth Substation Expansion |
Clark Public Utilities |
Washington |
S&L |
4/29/2026 |
5/13/2026 |
| Generator Circuit Breaker Overhaul Kit |
Clark Public Utilities |
Washington |
S&L |
4/22/2026 |
5/01/2026 |
| Statement of Qualifications - New RRGP Warehouse Facility |
Clark Public Utilities |
Washington |
S&L |
4/15/2026 |
5/07/2026 |
| OH & UG Conversion: NE Livingston Rd & NE Hancock Rd |
Clark Public Utilities |
Washington |
S&L |
4/15/2026 |
4/29/2026 |
| Envelope Management Program |
Clark Public Utilities |
Washington |
S&L |
4/10/2026 |
4/30/2026 |
| SOQ for Engineering Design of the 99th Street Water Transmission Phase 3 |
Clark Public Utilities |
Washington |
S&L |
4/09/2026 |
4/23/2026 |
| Ellsworth Substation Expansion |
Clark Public Utilities |
Washington |
S&L |
4/09/2026 |
4/22/2026 |
| OH & UG Work: E Mill Plain Blvd & Macarthur Blvd |
Clark Public Utilities |
Washington |
S&L |
4/09/2026 |
4/14/2026 |
| Generator Circuit Breaker Overhaul Kit |
Clark Public Utilities |
Washington |
S&L |
4/09/2026 |
4/24/2026 |
| SOQ for Engineering Design of the 99th Street Water Transmission Phase 3 |
Clark Public Utilities |
Washington |
S&L |
4/02/2026 |
4/23/2026 |
| Ellsworth Substation Expansion |
Clark Public Utilities |
Washington |
S&L |
4/01/2026 |
4/22/2026 |
| OH & UG Work: E Mill Plain Blvd & Macarthur Blvd |
Clark Public Utilities |
Washington |
S&L |
3/31/2026 |
4/14/2026 |
| Generator Circuit Breaker Overhaul Kit |
Clark Public Utilities |
Washington |
S&L |
3/25/2026 |
4/24/2026 |
| Generator Circuit Breaker Overhaul Kit |
Clark Public Utilities |
Washington |
S&L |
3/24/2026 |
4/10/2026 |
| Ellsworth Substation Expansion |
Clark Public Utilities |
Washington |
S&L |
3/11/2026 |
4/08/2026 |
| Water Main Replacement: NE Axford Rd |
Clark Public Utilities |
Washington |
S&L |
3/10/2026 |
3/25/2026 |
| Replacement 15kV Drawout Vacuum Circuit Breakers |
Clark Public Utilities |
Washington |
S&L |
3/09/2026 |
3/18/2026 |
| OH & UG Work: E Mill Plain Blvd & Macarthur Blvd |
Clark Public Utilities |
Washington |
S&L |
3/03/2026 |
3/17/2026 |
| Replacement 15kV Drawout Vacuum Circuit Breakers |
Clark Public Utilities |
Washington |
S&L |
2/25/2026 |
3/11/2026 |
| Flagging and Traffic Control Services |
Clark Public Utilities |
Washington |
S&L |
2/18/2026 |
3/04/2026 |
| Water Transmission Main Phase 2 - NW/NE 99th Street |
Clark Public Utilities |
Washington |
S&L |
2/12/2026 |
3/12/2026 |
| Statement of Qualifications - Technical Services Office Remodel |
Clark Public Utilities |
Washington |
S&L |
2/05/2026 |
2/27/2026 |
| UG Cable Replacement - Thunderbird Village (Verta) |
Clark Public Utilities |
Washington |
S&L |
2/03/2026 |
2/13/2026 |
| Underground Connect Services |
Clark Public Utilities |
Washington |
S&L |
1/28/2026 |
2/11/2026 |
| Yacolt Water System Consolidation |
Clark Public Utilities |
Washington |
S&L |
1/16/2026 |
1/29/2026 |
| Transmission Line Rebuild - Pioneer to Battle Ground |
Clark Public Utilities |
Washington |
S&L |
1/09/2026 |
1/30/2026 |
| Janitorial Services - Operations Center |
Clark Public Utilities |
Washington |
S&L |
1/08/2026 |
1/29/2026 |
| Electrodeionization System/Modules |
Clark Public Utilities |
Washington |
S&L |
12/29/2025 |
1/02/2026 |
| Butterfly Valves 30-inch |
Clark Public Utilities |
Washington |
S&L |
12/26/2025 |
12/30/2025 |
| Electrodeionization System/Modules |
Clark Public Utilities |
Washington |
S&L |
12/22/2025 |
12/29/2025 |
| Electrodeionization System/Modules |
Clark Public Utilities |
Washington |
S&L |
12/17/2025 |
12/23/2025 |
| Butterfly Valves 30-inch |
Clark Public Utilities |
Washington |
S&L |
12/16/2025 |
12/29/2025 |
| Yacolt Water System Consolidation |
Clark Public Utilities |
Washington |
S&L |
12/16/2025 |
1/22/2026 |
| Transmission Poles - Pioneer to Battle Ground Project |
Clark Public Utilities |
Washington |
S&L |
12/10/2025 |
12/30/2025 |
| Production Wells 2 & 3: Paradise Point Wellfield |
Clark Public Utilities |
Washington |
S&L |
12/04/2025 |
1/15/2026 |
| Electrodeionization System/Modules |
Clark Public Utilities |
Washington |
S&L |
11/26/2025 |
12/19/2025 |
| 94th Street Reservoir |
Clark Public Utilities |
Washington |
S&L |
11/12/2025 |
12/11/2025 |
| Scrap Metals & Materials |
Clark Public Utilities |
Washington |
S&L |
10/29/2025 |
11/21/2025 |
| 94th Street Reservoir |
Clark Public Utilities |
Washington |
S&L |
10/24/2025 |
12/03/2025 |
| Outdoor Metalclad Switchgear - Shipyard Substation |
Clark Public Utilities |
Washington |
S&L |
10/24/2025 |
11/04/2025 |
| UG Cable Replacement: SE Blairmont Dr & SE 152nd Ave |
Clark Public Utilities |
Washington |
S&L |
10/21/2025 |
11/12/2025 |
| Gas Turbine Inlet Filters |
Clark Public Utilities |
Washington |
S&L |
10/13/2025 |
10/21/2025 |
| Gas Turbine Inlet Filters |
Clark Public Utilities |
Washington |
S&L |
10/02/2025 |
10/15/2025 |
| Outdoor Metalclad Switchgear - Shipyard Substation |
Clark Public Utilities |
Washington |
S&L |
9/23/2025 |
10/28/2025 |
| Gas Turbine Inlet Filters |
Clark Public Utilities |
Washington |
S&L |
9/17/2025 |
10/08/2025 |
| Outdoor Metalclad Switchgear - Shipyard Substation |
Clark Public Utilities |
Washington |
S&L |
9/16/2025 |
10/14/2025 |
| Generator Circuit Breaker Overhaul Kit |
Clark Public Utilities |
Washington |
S&L |
9/02/2025 |
9/23/2025 |
| Well 104 Replacement |
Clark Public Utilities |
Washington |
S&L |
8/29/2025 |
9/19/2025 |
| Water Main Replacement: NE 167th & NE 170th Ave |
Clark Public Utilities |
Washington |
S&L |
8/26/2025 |
9/17/2025 |
| Well 104 Replacement |
Clark Public Utilities |
Washington |
S&L |
8/07/2025 |
9/09/2025 |
| Water Main Replacement - NE 102nd Ave (164th St-178th St) |
Clark Public Utilities |
Washington |
S&L |
7/25/2025 |
8/13/2025 |
| Meter Farm |
Clark Public Utilities |
Washington |
S&L |
7/22/2025 |
8/05/2025 |
| Well 104 Replacement |
Clark Public Utilities |
Washington |
S&L |
6/17/2025 |
7/08/2025 |
| Water Main Replacement - SE Grace & NE 142nd Ave |
Clark Public Utilities |
Washington |
S&L |
6/11/2025 |
6/25/2025 |
| OH & UG Line Work - NE 179th St & NE 29th Ave |
Clark Public Utilities |
Washington |
S&L |
5/08/2025 |
5/28/2025 |
| Unarmed Security Services |
Clark Public Utilities |
Washington |
S&L |
5/02/2025 |
5/23/2025 |
| Water Main Replacement: SE Grace & NE 142nd Ave |
Clark Public Utilities |
Washington |
S&L |
4/30/2025 |
5/21/2025 |
| Statement of Qualifications - New Operations Data Center |
Clark Public Utilities |
Washington |
S&L |
4/29/2025 |
5/20/2025 |
| Underground Facilities Locating and Marking |
Clark Public Utilities |
Washington |
S&L |
4/22/2025 |
5/13/2025 |
| Install & Upfit of (3) Utility Provided Line Crew Trucks |
Clark Public Utilities |
Washington |
S&L |
4/09/2025 |
4/30/2025 |
| Distribution Wood Poles |
Clark Public Utilities |
Washington |
S&L |
4/03/2025 |
4/24/2025 |
| Water Main Replacement: SE Grace & NE 142nd Ave |
Clark Public Utilities |
Washington |
S&L |
4/01/2025 |
4/22/2025 |
| Residential Water Meters |
Clark Public Utilities |
Washington |
S&L |
3/28/2025 |
4/11/2025 |
| Paradise Point Well House 1 Reconstruction |
Clark Public Utilities |
Washington |
S&L |
3/06/2025 |
4/02/2025 |
| Testing of Backflow Preventers |
Clark Public Utilities |
Washington |
S&L |
1/30/2025 |
2/12/2025 |
| UG Cable Replacement: NE 27th Ave & NE 153rd St |
Clark Public Utilities |
Washington |
S&L |
1/29/2025 |
2/11/2025 |
| Advanced Metering Infrastructure (AMI) |
Clark Public Utilities |
Washington |
S&L |
1/25/2025 |
4/09/2025 |
| Substation Power Transformer |
Clark Public Utilities |
Washington |
S&L |
1/24/2025 |
2/07/2025 |
| 2S RESIDENTIAL REVENUE METERS |
Clark Public Utilities |
Washington |
S&L |
1/23/2025 |
2/05/2025 |
| FORMS MANAGEMENT PROGRAM |
Clark Public Utilities |
Washington |
S&L |
1/14/2025 |
1/30/2025 |
| Fluted Decorative Fiberglass Standards |
Clark Public Utilities |
Washington |
S&L |
1/09/2025 |
1/23/2025 |
| REPLACEMENT 15kV DRAWOUT VACUUM CIRCUIT BREAKERS (RUNYAN) |
Clark Public Utilities |
Washington |
S&L |
1/07/2025 |
1/24/2025 |
| Substation Power Transformer |
Clark Public Utilities |
Washington |
S&L |
12/16/2024 |
1/30/2025 |
| Fluted Decorative Fiberglass Standards |
Clark Public Utilities |
Washington |
S&L |
12/10/2024 |
12/18/2024 |
| Substation Power Transformer |
Clark Public Utilities |
Washington |
S&L |
12/06/2024 |
1/10/2025 |
| Fluted Decorative Fiberglass Standards |
Clark Public Utilities |
Washington |
S&L |
11/20/2024 |
12/17/2024 |
| Vertical Crossed Link Polyethylene Tank |
Clark Public Utilities |
Washington |
S&L |
11/19/2024 |
12/03/2024 |
| Blanket Quotation for Electric Utility Stock Material (Various Commodity Groups) |
Clark Public Utilities |
Washington |
S&L |
11/07/2024 |
12/05/2024 |
| Outdoor Metalclad Switchgear - Ellsworth Substation |
Clark Public Utilities |
Washington |
S&L |
10/23/2024 |
11/05/2024 |
| SOQ - Engineering Design of the NE 99th Street 30-Inch Water Transmission Main Project - Cougar Creek to NE 25th… |
Clark Public Utilities |
Washington |
S&L |
10/17/2024 |
10/25/2024 |
| Janitorial Services: Electric Center |
Clark Public Utilities |
Washington |
S&L |
10/09/2024 |
10/29/2024 |
| Replacement 15kV Drawout Vacuum Circuit Breakers |
Clark Public Utilities |
Washington |
S&L |
10/04/2024 |
10/25/2024 |
| Outdoor Metalclad Switchgear - Ellsworth Substation |
Clark Public Utilities |
Washington |
S&L |
10/02/2024 |
10/30/2024 |
| SOQ - Engineering Design of the NE 99th Street 30-Inch Water Transmission Main Project - Cougar Creek to NE 25th… |
Clark Public Utilities |
Washington |
S&L |
10/01/2024 |
10/22/2024 |