Fish Exclusion Barrier Extension, Easter Lake Park, Polk County
Project Information
- Bid Title
- Fish Exclusion Barrier Extension, Easter Lake Park, Polk County
- Issuing Agency
- State Government of Iowa
- Location
- Iowa
- Published Date
- Feb 9, 2026
- Closing Date
- Feb 11, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 25-05-77-05
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid InformationBid Number
25-05-77-05
Solicitation
Fish Exclusion Barrier Extension, Easter Lake Park, Polk County
Solicitation Type
Request for Quotes
County
Polk
DescriptionDescription
This project includes a 20' extension of the existing fish exclusion barrier in the spillway at Easter Lake in Polk County, Iowa. *** For bid package documentation, including bid proposal, please contact Jason Kruse at (515) 250-3707 or jason.kruse@dnr.iowa.gov
BID CLOSING DATE AND TIME: 2/26/2026 AT 3:00 PM CST
***Bids must be submitted as per the General Information and Instructions to Bidders.******Bids MUST be submitted electronically****Agency InformationNumber
542
Name
Natural Resources, Dept Of
Address 1
6200 Park Ave
Address 2
City/State/Zip
Des Moines, IA 50321
Contact InformationContact Name
Darin Galbraith
Contact Title
Procurement Specialist
Contact Email
Contact Phone Number
(515) 344-0055
Contact Phone Extension
Contact Other Number
Contact Fax NumberValid DatesFrom
2/9/2026 4:06:00 PM
Until
2/11/2026 4:06:00 PM
Documents/Attachments - Attachment Preview
-
IOWA DEPARTMENT OF NATURAL RESOURCESGENERAL INFORMATION AND INSTRUCTIONS TO BIDDERSFORFISH EXCLUSION BARRIER EXTENSION, 25-05-77-05COMPETITIVE QUOTATIONPlease read and familiarize yourself with all of these Instructions before preparing your proposal.1. To be considered a responsible and responsive bidder, all the information requested on the Proposal Form,Attachment A, must be completed and received by the Iowa Department of Natural Resources by 3:00pm,Thursday, February 26, 2026. If you are signing on behalf of a corporation, include your title in the signature line.Keep a copy of the proposal as your record of your submitted proposal.2. Email your proposal to constructionbids@dnr.iowa.gov. All proposals must be submitted electronically. No paperproposals will be accepted. Include the following information in the subject line: Project Name, Contract Number,and Bid Letting Date.Contact for the competitive quotation process is as follows:Darin Galbraith, Procurement Specialistconstructionbids@dnr.iowa.gov515-344-0055Contact for questions on plans and specifications is as follows:Jason Kruse, District Engineer806 Trail Ridge PlIndianola, IA 50125Jason.kruse@dnr.iowa.gov515-250-37073. DO NOT alter the proposal with alternates, qualifications, reservations, or stipulations. If the bid is not a lump sum,clearly identify unit prices. In event of any inconsistency between the Proposed Bid Total and the bid total derivedfrom provided unit prices, unit prices will prevail. (See Article 4.)4. Your proposal will be audited, extensions and totals verified, and notification of decision of award will be madepromptly after the closing date for receipt of proposals shown above. The lowest responsive, responsible bidder willbe eligible for award of a subsequent contract. The DEPARTMENT reserves the unconditional right not to award acontract for the project described in these instructions and related attachments.5. Both successful and unsuccessful bidders will be notified of the result of the bidding. If you are the successful bidder,an award letter and contract documents will be sent to you with detailed instructions for completion. By submittinga proposal, you agree and understand that acceptance of your proposal by the DEPARTMENT constitutes a bindingagreement to enter into a contract and that the offer contained in your proposal shall be valid for a period of 45days from the deadline for submission of proposals.Rev.2-3-2026COMPETITIVE QUOTATION (MINOR) PUBLIC IMPROVEMENT CONTRACTATTACHMENT APROPOSAL FormPROJECT: FISH EXCLUSION BARRIER EXTENSIONLOCATION: EASTER LAKE PARKITEMNO.DESCRIPTION1Fish Barrier Extension, CompleteCONTRACT NO.: 25-05-77-05ESTIMATEDQUANTITYLump SumUNIT PRICE*AMOUNTDOLLARS CENTS DOLLARS CENTS*Unit Prices Prevail; Amount equals Estimated Quantity multiplied by Unit PriceProposed Bid Total: $By virtue of statutory authority, preference will be given to products grown and coal produced within the State of Iowa.SignatureDateLegal Name of CompanyPrinted NameStreet AddressTitleCity, State, Zip CodeIowa Contractor Registration NumberPhone No.Email AddressBidder Acknowledges Receipt of Any Issued Addenda (Number and Date): ______________________________________NameSubcontractor InformationIowa ContractorRegistration NumberEmail AddressThis Proposal will become void if not accepted by the DEPARTMENT within 45 days of the deadline for submission ofproposals described in the General Information and Instructions to Bidders for this project.Rev.2-3-2026COMPETITIVE QUOTATION (MINOR) PUBLIC IMPROVEMENT CONTRACTThis following is an EXAMPLE of the contract that will be sent to the successful bidder; and, which the Contractor will berequired to sign, prior to performing work under this project.Contract No.: 25-05-77-05IOWA DEPARTMENT OF NATURAL RESOURCESCOMPETITIVE QUOTATION (MINOR) PUBLIC IMPROVEMENT CONTRACTAGREEMENT, entered into between the Iowa Department of Natural Resources, an agency of the State of Iowa,hereinafter called the DEPARTMENT, andName:Address:Address:City, State, Zip:Phone:E-Mail Address:Contact Person:hereinafter called the CONTRACTOR.WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made andperformed by the parties mentioned above, the CONTRACTOR agrees with the DEPARTMENT, to commence andcomplete the project described as follows and collectively referred to as the Project:This project includes a 20’ extension of the existing fish exclusion barrier in the spillway at Easter Lake in Polk County,Iowa.Located at: Easter Lake Park in Polk County, Iowa, for the sum of $ ____________. This contract supersedes all priorcontracts or agreements between the DEPARTMENT and the CONTRACTOR for the work described in this contract. TheProject is more thoroughly and specifically described in Article 2, Scope of Work, of this contract.ARTICLE 1 - DEPARTMENT REPRESENTATIVEThe representative of the DEPARTMENT shall be Jason Kruse, District Engineer, 515-250-3707, and all communicationsfrom the CONTRACTOR should occur thereto. However, any modifications or payments must be approved by thehighest-level signatory for the DEPARTMENT, as described on the signature page.ARTICLE 2 - SCOPE OF WORKThe CONTRACTOR shall furnish, at his own proper cost and expense, all materials, equipment, labor, insurance, andother accessories and services necessary to complete, in a workmanlike manner, ready for continuous operation, theabove-mentioned project. The work shall be performed in accordance with the requirements and provisions of thefollowing documents, all of which are made a part hereof and collectively evidence and constitute the contract:● CONTRACTOR’s Proposal attached as Attachment A.● PLANS as Attachment B.It is intended that the specifications and plans, which include the Description of the Project on the first page of thisContract and supplemented as may be necessary by the DEPARTMENT, shall provide for the completion of the workspecified herein.The omission of specific reference to any minor items of material or work reasonably necessary to provide a completeRev.2-3-2026COMPETITIVE QUOTATION (MINOR) PUBLIC IMPROVEMENT CONTRACTproject, will not release the CONTRACTOR from the responsibility of furnishing or doing the items omitted.The CONTRACTOR shall leave the site free and clean of all construction equipment, materials, and rubbish. TheCONTRACTOR shall replace any defective material or workmanship in the construction at no cost to the DEPARTMENT,and shall guarantee the construction for a period of one year from the date of the Department’s final acceptance.ARTICLE 3 - TIME OF COMMENCEMENT AND COMPLETIONThe time of commencement of work under this contract shall be within a reasonable period of time after thepreconstruction conference as approved by the Department. The date of completion of the work under this contractshall be: May 31, 2026.ARTICLE 4 - BASIS OF PAYMENTThe DEPARTMENT shall make payment within 30 days of receipt of a payment request which is approved as payable bythe Department, on this contract as is indicated below, by one of the following methods:1. Lump Sum Basis- This section is applicable to this contract. Except for adjustments as provided for herein, theDEPARTMENT shall pay to the CONTRACTOR, for the performance of work, the lump sum of $____________,hereinafter called the Contract Sum. The Contract Sum shall be equitably adjusted to cover changes in the workordered by the DEPARTMENT, but not shown on the drawings or required by the specifications. Such increases ordecreases in the Contract Sum shall be determined by agreement between the DEPARTMENT and the CONTRACTOR.2. Unit Price Basis- This section is not applicable to this contract. The DEPARTMENT shall pay to the CONTRACTOR theunit price amount stated with respect to each item of work on the attached schedule for the total number of unitseach item of work completed. The number of units shown on the attached schedule is approximate only, and thefinal payment shall be made for the actual number of units that are incorporated into or made necessary by thework covered by this contract. Should the number of units of completed work of any individual item shown on theattached schedule vary by more than twenty percent (20%) from the number of units stated, either theDEPARTMENT or the CONTRACTOR may request a revision of the unit price for the item so affected, but suchchanges shall not exceed 10% of the total Contract amount. Both parties agree that under such conditions anequitable revision of the price shall be made. Changes that cannot be classified under any of the contract units maybe performed at mutually agreed upon unit prices, or on a lump sum basis.The Department, under this Contract, shall reserve the right to withhold up to 3% consistent with Iowa Code Chapter573. The Contractor may invoice the Department only for work completed. If the work extends over a period of morethan one month, the DEPARTMENT may, upon request by the CONTRACTOR, make written estimates of the value ofmaterials complete in place and the work performed. Estimates shall be on a monthly basis or on a longer period of timemutually agreed upon. No estimate, except the final estimate, shall be for less than five hundred dollars ($500). Theestimates shall be figured at the contract unit prices for contracts on a unit price basis or on a mutually agreed uponpercentage of the total work completed for contracts on a lump sum basis. Each estimate shall be filed in the form of aclaim against the DEPARTMENT. Estimates are approximate only, and shall be subject to correction in the first estimaterendered following the discovery of an error in any previous estimate. Should a reasonable doubt arise as to theintegrity of any part of the work completed prior to the final acceptance and payment, the department will deduct fromthe first estimate rendered, after the discovery of such work, an amount equal in value to the defective or questionedwork. Further, such work will not be included in a subsequent estimate until the defects have been remedied or thecauses for doubt removed. Within a reasonable period of time after satisfactory completion of the project, a finalinspection of the work will be made by the DEPARTMENT to determine compliance with the contract, plans andspecifications, and to submit a final estimate. All prior partial estimates and payments shall be subject to correction inthe final estimate and payment. The CONTRACTOR shall sign the final estimate form acknowledging acceptance of theamount stated.Final payment shall be made as soon as possible following the expiration of statutory time for filing claims, or followingadjudication or release of claim against the amount withheld. Earlier requirements for the submission of the IowaDepartment of Revenue Contractor’s Statement of Sale and Use Tax (see ARTICLE 20), prior to final payments, are noRev.2-3-2026COMPETITIVE QUOTATION (MINOR) PUBLIC IMPROVEMENT CONTRACTlonger in effect.ARTICLE 5 - LIQUIDATED DAMAGESTime is an essential element of the contract and it is important that the work be completed by the deadline. For eachcalendar day that any work shall remain uncompleted after the end of the contract period, number of working daysallowed, or any extension granted, the amount per calendar day specified in the proposal form will be assessed, not as apenalty, but as predetermined and agreed liquidated damages.The CONTRACTOR hereby agrees that liquidated damages in the amount of $800.00 shall be retained or assessedagainst the CONTRACTOR for each day and every day the completion of the work is delayed beyond the time specifiedherein, not as a penalty, but as a mutually agreed to, predetermined amount to reimburse the DEPARTMENT for salariesand related expenses of directly involved staff and reviewers, interest charged during the period for delays and loss ofuse.The DEPARTMENT will prepare and forward to the Contractor a Change Order to account for such liquidated damages.The final payment will be withheld until payment shall have been made consistent with this assessment of liquidateddamages based only on the number of calendar days required to complete the work in excess of the completion date,plus authorized extensions thereto. This provision for the assessment of liquidated damages for failure to completework within the contract period does not constitute a waiver of the DEPARTMENT’S right to collect any additionaldamages other than time delays which the DEPARTMENT may sustain by failure of the Contractor to carry out the termsof the contract.If the Contractor fails to complete the work within the contract periods or any extension thereof, upon written notice tothe Contractor and surety, said contract shall be in default. The DEPARTMENT may, at its option, permit the Contractoror the Contractor’s surety to complete the work included in the contracts or may proceed to complete the work. Ineither event, the Contractor or the Contractor’s surety shall be responsible for all costs incident to the completion of thework, and also for the liquidated damages stipulated in the proposal form. The DEPARTMENT may waive such portion ofthe liquidated damages as may accrue after the work is in condition for safe and convenient use by the public.ARTICLE 6 - PERMITSIn addition to other permits that may be required for the CONTRACTOR to conduct its business in the state of Iowa, theCONTRACTOR shall apply for, pay for and obtain prior to commencing work under this contract a NPDES StormwaterDischarge Permit (DNR’s General Permit No. 2) for Construction Operation, as required by EPA regulations, for any land-disturbing activity which will disturb an area of one or more acres. The permits shall be readily available for inspection atall times. Permits are available from the DNR Storm Water Coordinator, 6200 Park Avenue, Suite 200, Des Moines, Iowa,50321. (Tel. (515) 217-0875.)The CONTRACTOR shall be required to apply for, pay for and obtain all permits required by law prior to commencingwork under this contract.ARTICLE 7 - PERFORMANCE BONDIn compliance with Chapter 573 of the Code of Iowa, contracts shall, when the contract price equals or exceeds twenty-five thousand dollars, be accompanied by a bond, with surety, conditioned for the faithful performance of the contract.The amount shall be not less than one hundred percent (100%) of the contract price. The bond shall be executed on thestandard form supplied by the DEPARTMENT. The bond, if required, shall be executed by the CONTRACTOR and by asurety authorized to do business in the State of Iowa and shall be incorporated by this reference.ARTICLE 8 - CONTRACTOR’S INSURANCEThe CONTRACTOR’S current certificate of liability and property damage insurance shall be filed with the DEPARTMENTprior to the execution of the contract and shall be maintained at such amounts throughout the prosecution of the workand until final acceptance and completion of the contract. The minimum coverage by such insurance shall be as follows:Public Liability InsuranceRev.2-3-2026Property Damage InsuranceCOMPETITIVE QUOTATION (MINOR) PUBLIC IMPROVEMENT CONTRACT
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
7th Avenue at Cedar River Wat...
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
City of Cedar Rapids
Bid Due: 7/08/2026
Ruminant Nutrition Laboratory...
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
Iowa State University
Bid Due: 7/15/2026