Building 504 Electrical Outlets
Project Information
- Bid Title
- Building 504 Electrical Outlets
- Issuing Agency
- DEPT OF DEFENSE
- Location
- Texas
- Published Date
- Jul 13, 2026
- Closing Date
- Jul 14, 2026
- Government Level
- Federal
- Status
- Closed
- Ref. #
- FA309926Q0016
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Set Aside
- Total Small Business Set-Aside (FAR 19.5)
- Project Description
-
FollowBuilding 504 Electrical OutletsActiveContract OpportunityNotice IDFA309926Q0016Related NoticeDepartment/Ind. AgencyDEPT OF DEFENSESub-tierDEPT OF THE AIR FORCEMajor CommandAIR EDUCATION AND TRAINING COMMANDOfficeFA3099 47 CONF CCGeneral Information View ChangesLooking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Jul 13, 2026 01:58 pm CDT
- Original Published Date: Jul 10, 2026 10:29 am CDT
- Updated Date Offers Due: Jul 14, 2026 10:00 am CDT
- Original Date Offers Due: Jul 14, 2026 10:00 am CDT
- Inactive Policy: Manual
- Updated Inactive Date: Jul 14, 2026
- Original Inactive Date: Jul 14, 2026
-
Initiative:
- None
Classification- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: N061 - INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT
-
NAICS Code:
- 238210 - Electrical Contractors and Other Wiring Installation Contractors
-
Place of Performance:
Laughlin AFB , TX 78843USA
Description View ChangesThe contractor is responsible for delivering all materials, labor, tools, equipment, transportation, and supervision required to complete the installation in a single phase to minimize facility downtime. All design and construction must comply with Laughlin AFB Division 01 Specifications, Environmental Contractor Technical Specifications, UFC 1-200-01 (DoD Building Code), and NFPA 70 (National Electrical Code).
The technical execution requires a Stormwater Pollution Prevention Plan (SWPPP) to manage runoff and eliminate Foreign Object Debris (FOD). Physical works include trenching from the transformer to a distribution rack positioned ten feet behind it, followed by running 160 feet of overhead power lines on three newly installed utility poles (Poles #1, #2, and #3) to B504. These utility poles must not exceed the 28-foot height of the neighboring B502. Hydro trenching is restricted to a ten-foot stretch from the transformer to the rack and a three-foot diameter around each utility pole.
The electrical infrastructure demands 180 feet of 2 ½ inch conduit and properly sized wiring to support six 480-volt weatherproof twist-lock receptacles, complete with dedicated disconnect switches, system grounding, and bonding. The contractor must also coordinate secondary power conduit termination with the Rio Grande Electric Cooperative (RGEC) and assume all associated subcontracting costs. Following installation, the site must be restored, graded, and cleared of rocks larger than three inches.
Site visit will be scheduled for 13 July 2026 at 2:00 pm. If you have any questions direct them to the primary point of contacts email. All questions, comments and inquiries will be returned to all those parties that submitted quotes.
All quotes must include all costs associated with engineering design, labor, tools, equipment, materials, transportation, installation, testing, and site restoration. All quotes must be accompanied by technical specification sheets for all proposed hardware.
*ALL QUOTES MUST BE ON COMPANY LETTERHEAD*
*ALL QUOTES MUST REMAIN VALID UNTIL 30 SEPTEMBER 2026*
Vendors shall provide:
- Itemized pricing breakdown (design, labor, and materials).
- Manufacturer name and model numbers for proposed receptacles, disconnects, panels, and conduit.
- Lead times for materials and design submittals.
- Warranty information (covering materials and workmanship).
- Confirmation of ability to meet the 128-day Period of Performance.
- Written confirmation that the quote remains firm and valid through 30 September 2026.
Note: The selected Contractor will be required to submit physical samples of the weatherproof conduit, weatherproof receptacle boxes, receptacles, cover plates, fasteners, disconnects, and the electrical panel to the Government for review and approval upon award.
Funding Availability
Release of Solicitations in Advance of Funding Availability Notice to Offeror(s)/Supplier(s): Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
The agency will consider and has the right to award the contract to the vendor whose offer represents the best value to the Government. IAW RFO 2.101, Best Value means the expected outcome of an acquisition that, in the Government's estimation, provides the greatest overall benefit in response to the requirement.
Evaluation factors include:
- Technical Acceptability: Adherence of design and hardware to commercial-grade and military code standards (NFPA 70/UFC 1-200-01).
- Requirement Compliance: Strict adherence to the SOW-specified submittal schedules and construction parameters (including overhead line height limits and hydro-trenching restrictions).
- Project Schedule: Feasibility of meeting the 128-day Period of Performance (114 days design/procurement, 14 days construction).
- Warranty: Scope and length of warranties provided on electrical components and installation workmanship.
- Past Performance: History of successful completion of similar electrical design-build or installation projects.
- Total Evaluated Price: Combined price of all design, labor, materials, testing, and GPC fees.
Basis for Award
The Government intends to award a single firm-fixed-price purchase order to the responsible vendor whose quotation
represents the best value to the government. The contracting officer has broad discretion in establishing how
quotations will be evaluated. The contracting officer may perform a comparative evaluation of quotations.
The evaluation factors are (in descending order of importance):
1. Price: The total evaluated price.
2. Past Performance: The Government will assess the relevance and quality of recent past performance.
3. Technical Approach: The feasibility and clarity of the proposed plan and timeline.
Applicable Provisions & Clauses
This acquisition is being conducted under RFO 12, treating construction as a commercial service. The following
provisions apply:
• FAR 52.212-1, Instructions to Offerors—Commercial Products and Commercial Services.
• FAR 52.212-4, Contract Terms and Conditions—Commercial Products and Commercial Services.
• FAR Part 36, Construction and Architect-Engineer Contracts, and FAR Subpart 22.4, Labor Standards for
Contracts Involving Construction (including Davis-Bacon Act requirements) remain applicable to this
requirement. The applicable Wage Determination will be incorporated into the awarded purchase order.
Due to the Statement of Work (SOW) being locked, the governemrnt will conduct a second site visit on 7/14/2026 at 9:00 am. If you are interested in attanding the site visit please email Alejandro De Hoyos at alejandro.de_hoyos@us.af.mil by close of businress on 7/13/2026.
Attachments/LinksContact InformationHistoryContracting Office Address- ADMIN ONLY NO REQTN CP 830 298 5116 171 ALABAMA AVE BLDG 7
- LAUGHLIN AFB , TX 78843-5101
- USA
Primary Point of Contact- Alejandro De Hoyos
- alejandro.de_hoyos@us.af.mil
- Phone Number 8302984014
Secondary Point of Contact- Malik Mumpfield
- malik.mumpfield@us.af.mil
- Phone Number 8302984179
- Jul 13, 2026 01:58 pm CDTCombined Synopsis/Solicitation (Updated)
- Jul 13, 2026 01:35 pm CDT Combined Synopsis/Solicitation (Updated)
- Jul 10, 2026 10:29 am CDT Combined Synopsis/Solicitation (Original)
- Commodity Codes
-
- FSC NInstallation of Equipment
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
- Related bids
-
Jul 10, 2026 [Combined Synopsis/Solicitation (Original)] Building 504 Electrical Outlets Jul 10, 2026 [Solicitation (Original)] Laughlin AFB - Bldg 308 Carpet Replacement Jul 18, 2026 [Solicitation (Updated)] Laughlin AFB - Bldg 308 Carpet Replacement
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Temporary Stagehand and Tech ...
Project: Temporary Stagehand and Tech Labor Ref. #: BYZ26-00030828 Type: CSP Status: Open
City of Dallas
Bid Due: 8/28/2026
CDBG - Minor Rehab - ITB 2026...
Project: CDBG - Minor Rehab - ITB 2026-104ER - Rodriguez Ref. #: MR
City of Lubbock
Bid Due: 8/03/2026