| 26-D-00030 Ybor Pumping Station Force Main Repairs Design |
City of Tampa |
Florida |
S&L |
6/22/2026 |
6/30/2026 |
| 26-C-00024; HFC AWTP Final Sedimentation Tanks No. 1-6 Inlet Baffle Replacement |
City of Tampa |
Florida |
S&L |
6/16/2026 |
7/07/2026 |
| 26-C-00013 Hubert Avenue Park Improvements |
City of Tampa |
Florida |
S&L |
6/16/2026 |
7/14/2026 |
| 26-C-00027 Stormwater Pond Dredging and Restoration Contract FY26 |
City of Tampa |
Florida |
S&L |
6/15/2026 |
6/23/2026 |
| 26-C-00024; HFC AWTP Final Sedimentation Tanks No. 1-6 Inlet Baffle Replacement |
City of Tampa |
Florida |
S&L |
6/04/2026 |
7/07/2026 |
| 26-C-00024; HFC AWTP Final Sedimentation Tanks No. 1-6 Inlet Baffle Replacement |
City of Tampa |
Florida |
S&L |
6/02/2026 |
7/07/2026 |
| 26-C-00031 Stormwater Pipe Point Repair and Replacement Contract FY26 |
City of Tampa |
Florida |
S&L |
5/25/2026 |
7/07/2026 |
| 26-C-00027 Stormwater Pond Dredging and Restoration Contract FY26 |
City of Tampa |
Florida |
S&L |
5/21/2026 |
6/23/2026 |
| 26-C-00024; HFC AWTP Final Sedimentation Tanks No. 1-6 Inlet Baffle Replacement |
City of Tampa |
Florida |
S&L |
5/21/2026 |
7/07/2026 |
| 26-D-00036 Franklin Street Action Plan |
City of Tampa |
Florida |
S&L |
5/20/2026 |
6/04/2026 |
| 26-D-00036 Franklin Street Action Plan |
City of Tampa |
Florida |
S&L |
5/06/2026 |
5/18/2026 |
| 26-C-00022 Howard F. Curren AWTP Aquifer Recharge Wells Pumping System Design-Build |
City of Tampa |
Florida |
S&L |
4/27/2026 |
6/11/2026 |
| 26-C-00025 Washington Street Park and Curtis Hixon Park Improvements Design-Build |
City of Tampa |
Florida |
S&L |
4/21/2026 |
5/21/2026 |
| 26-C-00025 Washington Street Park and Curtis Hixon Park Improvements Design-Build |
City of Tampa |
Florida |
S&L |
4/20/2026 |
5/04/2026 |
| 26-C-00021 Asphalt Restoration Contract (2026) |
City of Tampa |
Florida |
S&L |
3/31/2026 |
4/21/2026 |
| 26-C-00016 Cold Milling of Existing Asphaltic Concrete Roadways (Small Areas) |
City of Tampa |
Florida |
S&L |
3/25/2026 |
4/14/2026 |
| 26-C-00016 Cold Milling of Existing Asphaltic Concrete Roadways (Small Areas) |
City of Tampa |
Florida |
S&L |
3/19/2026 |
4/14/2026 |
| 26-D-00019 Water Production Master Plan |
City of Tampa |
Florida |
S&L |
3/02/2026 |
3/12/2026 |
| 26-D-00011 Smart Mobility General Engineering Contract |
City of Tampa |
Florida |
S&L |
2/26/2026 |
4/02/2026 |
| 25-C-00032 Howard F. Curren AWTP Main Switchgear Replacement and Standby Power Facility Improvements Design-Build |
City of Tampa |
Florida |
S&L |
2/18/2026 |
3/26/2026 |
| 25-C-00032 Howard F. Curren AWTP Main Switchgear Replacement and Standby Power Facility Improvements Design Build Design-Build |
City of Tampa |
Florida |
S&L |
2/16/2026 |
3/26/2026 |
| 26-C-00012 Rivergate Parking Garage Level B1 Improvements |
City of Tampa |
Florida |
S&L |
2/13/2026 |
3/03/2026 |
| 25-C-00041; FY25 - Stormwater Improvement Projects (Clark, Annona and Woodmere) |
City of Tampa |
Florida |
S&L |
2/10/2026 |
2/24/2026 |
| 26-D-00017 Howard F. Curren Advanced Wastewater Treatment Plant (HFC AWTP) Supervisory Control and Data Acquisition (SCADA) Migration and Fiber Replacement… |
City of Tampa |
Florida |
S&L |
2/05/2026 |
3/19/2026 |
| 26-D-00019 Water Production Master Plan |
City of Tampa |
Florida |
S&L |
2/02/2026 |
3/12/2026 |
| 25-C-00041; FY25 - Stormwater Improvement Projects (Clark, Annona and Woodmere) |
City of Tampa |
Florida |
S&L |
1/30/2026 |
2/17/2026 |
| 25-C-00020; Sherwood Heights Pumpstation Force Main Relocation |
City of Tampa |
Florida |
S&L |
1/29/2026 |
2/10/2026 |
| 26-C-00005 Cold Milling of Existing Asphaltic Concrete Roadways FY26 |
City of Tampa |
Florida |
S&L |
1/15/2026 |
1/27/2026 |
| 25-C-00020; Sherwood Heights Pumpstation Force Main Relocation |
City of Tampa |
Florida |
S&L |
1/15/2026 |
2/03/2026 |
| 25-C-00041; FY25 - Stormwater Improvement Projects (Clark, Annona and Woodmere) |
City of Tampa |
Florida |
S&L |
1/12/2026 |
2/10/2026 |
| 26-C-00010 Citywide Water System Maintenance and Emergency Repairs |
City of Tampa |
Florida |
S&L |
1/09/2026 |
1/20/2026 |
| 25-C-00041; FY25 - Stormwater Improvement Projects (Clark, Annona and Woodmere) |
City of Tampa |
Florida |
S&L |
12/29/2025 |
1/20/2026 |
| 26-C-00010 Citywide Water System Maintenance and Emergency Repairs |
City of Tampa |
Florida |
S&L |
12/26/2025 |
1/20/2026 |
| 26-C-00010 Citywide Water System Maintenance and Emergency Repairs |
City of Tampa |
Florida |
S&L |
12/23/2025 |
1/20/2026 |
| 26-C-00005 Cold Milling of Existing Asphaltic Concrete Roadways FY26 |
City of Tampa |
Florida |
S&L |
12/23/2025 |
1/20/2026 |
| 25-C-00020; Sherwood Heights Pumpstation Force Main Relocation |
City of Tampa |
Florida |
S&L |
12/18/2025 |
1/20/2026 |
| 25-C-00020; Sherwood Heights Pumpstation Force Main Relocation |
City of Tampa |
Florida |
S&L |
12/17/2025 |
1/20/2026 |
| 26-C-00006 Citywide Resurfacing Contract |
City of Tampa |
Florida |
S&L |
12/12/2025 |
12/16/2025 |
| 24-C-00032 TPD Howard Ave. Annex Bldg |
City of Tampa |
Florida |
S&L |
12/11/2025 |
12/16/2025 |
| 24-C-00032 TPD Howard Ave. Annex Bldg |
City of Tampa |
Florida |
S&L |
12/09/2025 |
12/16/2025 |
| 26-C-00004 Water Main Replacement - Armory Gardens & Jefferson |
City of Tampa |
Florida |
S&L |
12/05/2025 |
1/13/2026 |
| 26-C-00006 Citywide Resurfacing Contract |
City of Tampa |
Florida |
S&L |
12/03/2025 |
12/16/2025 |
| 24-C-00032 TPD Howard Ave. Annex Bldg |
City of Tampa |
Florida |
S&L |
12/02/2025 |
12/16/2025 |
| 24-C-00032 TPD Howard Ave. Annex Bldg |
City of Tampa |
Florida |
S&L |
11/25/2025 |
12/09/2025 |
| 25-C-00035 TFR Fire Safety Prop Design-Build |
City of Tampa |
Florida |
S&L |
11/20/2025 |
12/18/2025 |
| 25-C-00031 Citywide ADA Improvements Design-Build |
City of Tampa |
Florida |
S&L |
11/13/2025 |
12/11/2025 |
| 25-D-00400 C ; Work Order Agreements For Professional Services As Needed |
City of Tampa |
Florida |
S&L |
11/12/2025 |
1/08/2026 |
| 25-C-00031 Citywide ADA Improvements Design-Build |
City of Tampa |
Florida |
S&L |
11/10/2025 |
12/11/2025 |
| 26-C-00006 Citywide Resurfacing Contract |
City of Tampa |
Florida |
S&L |
11/07/2025 |
12/16/2025 |
| 24-C-00032 TPD Howard Ave. Annex Bldg |
City of Tampa |
Florida |
S&L |
11/06/2025 |
12/02/2025 |
| 25-C-00031 Citywide ADA Improvements Design-Build |
City of Tampa |
Florida |
S&L |
11/06/2025 |
12/11/2025 |
| 24-C-00032 TPD Howard Ave. Annex Bldg |
City of Tampa |
Florida |
S&L |
10/28/2025 |
12/02/2025 |
| 25-D-00030 Picnic Island Park Nature Based Solutions |
City of Tampa |
Florida |
S&L |
10/22/2025 |
10/30/2025 |
| 25-C-00035 TFR Fire Safety Prop Design-Build |
City of Tampa |
Florida |
S&L |
10/17/2025 |
11/20/2025 |
| 25-C-00044; Ybor City CRA 7th Avenue Street Resurfacing (Phase II) |
City of Tampa |
Florida |
S&L |
10/17/2025 |
10/28/2025 |
| 26 -D-00007 Construction Engineering and Inspection Services |
City of Tampa |
Florida |
S&L |
10/17/2025 |
11/20/2025 |
| 25-C-00019; Drew Park Lois Avenue and Grady Avenue Landscape and Streetscape |
City of Tampa |
Florida |
S&L |
9/30/2025 |
10/21/2025 |
| 25-C-00031 Citywide ADA Improvements Design-Build |
City of Tampa |
Florida |
S&L |
9/29/2025 |
11/06/2025 |
| 25-C-00022 K-Bar Ranch Park Improvements. Design-Build |
City of Tampa |
Florida |
S&L |
9/29/2025 |
11/06/2025 |
| 25-C-00038; Citywide Water Meter Replacement |
City of Tampa |
Florida |
S&L |
9/26/2025 |
10/07/2025 |
| 26-C-00002 Ballast Point Public Pier Replacement Design-Build |
City of Tampa |
Florida |
S&L |
9/25/2025 |
10/30/2025 |
| 25-D-00030 Picnic Island Park Nature Based Solutions |
City of Tampa |
Florida |
S&L |
9/25/2025 |
10/30/2025 |
| 25-C-00038; Citywide Water Meter Replacement |
City of Tampa |
Florida |
S&L |
9/24/2025 |
9/30/2025 |
| 25-C-00044; Ybor City CRA 7th Avenue Street Resurfacing (Phase II) |
City of Tampa |
Florida |
S&L |
9/24/2025 |
10/28/2025 |
| 25-C-00007; Wastewater Tuberculated Gravity Pipeline Rehabilitation by Cured-in-Place Pipe Lining |
City of Tampa |
Florida |
S&L |
9/24/2025 |
9/30/2025 |
| 25-C-00044; Ybor City CRA 7th Avenue Street Resurfacing (Phase II) |
City of Tampa |
Florida |
S&L |
9/18/2025 |
10/28/2025 |
| 25-C-00007; Wastewater Tuberculated Gravity Pipeline Rehabilitation by Cured-in-Place Pipe Lining |
City of Tampa |
Florida |
S&L |
9/18/2025 |
9/30/2025 |
| 25-D-00042 Water Resources Master Plan |
City of Tampa |
Florida |
S&L |
9/18/2025 |
10/23/2025 |
| 25-C-00019; Drew Park Lois Avenue and Grady Avenue Landscape and Streetscape |
City of Tampa |
Florida |
S&L |
9/17/2025 |
10/21/2025 |
| 25-C-00038; Citywide Water Meter Replacement |
City of Tampa |
Florida |
S&L |
9/17/2025 |
9/30/2025 |
| 25-C-00007; Wastewater Tuberculated Gravity Pipeline Rehabilitation by Cured-in-Place Pipe Lining |
City of Tampa |
Florida |
S&L |
9/16/2025 |
9/30/2025 |
| 25-D-00043; Howard F. Curren AWTP Master Plan Update |
City of Tampa |
Florida |
S&L |
9/15/2025 |
10/16/2025 |
| 25-C-00038; Citywide Water Meter Replacement |
City of Tampa |
Florida |
S&L |
9/11/2025 |
9/23/2025 |
| 25-D-00043; Howard F. Curren AWTP Master Plan Update |
City of Tampa |
Florida |
S&L |
9/11/2025 |
10/16/2025 |
| 25-D-00034 Professional Engineering Consulting Services for the Department of Solid Waste and Environmental Program |
City of Tampa |
Florida |
S&L |
9/05/2025 |
9/18/2025 |
| 25-C-00007; Wastewater Tuberculated Gravity Pipeline Rehabilitation by Cured-in-Place Pipe Lining |
City of Tampa |
Florida |
S&L |
9/05/2025 |
9/23/2025 |
| 25-D-00042 Water Resources Master Plan |
City of Tampa |
Florida |
S&L |
9/05/2025 |
9/18/2025 |
| 25-C-00038; Citywide Water Meter Replacement |
City of Tampa |
Florida |
S&L |
9/05/2025 |
9/16/2025 |
| 25-D-00043; Howard F. Curren AWTP Master Plan Update |
City of Tampa |
Florida |
S&L |
9/05/2025 |
9/11/2025 |
| 25-C-00007; Wastewater Tuberculated Gravity Pipeline Rehabilitation by Cured-in-Place Pipe Lining |
City of Tampa |
Florida |
S&L |
8/25/2025 |
9/23/2025 |
| 25-D-00042 Water Resources Master Plan |
City of Tampa |
Florida |
S&L |
8/15/2025 |
9/18/2025 |
| 25-D-00034 Professional Engineering Consulting Services for the Department of Solid Waste and Environmental Program |
City of Tampa |
Florida |
S&L |
8/15/2025 |
9/18/2025 |
| 25-C-00007; Wastewater Tuberculated Gravity Pipeline Rehabilitation by Cured-in-Place Pipe Lining |
City of Tampa |
Florida |
S&L |
8/14/2025 |
9/23/2025 |
| 25-C-00038; Citywide Water Meter Replacement |
City of Tampa |
Florida |
S&L |
8/08/2025 |
9/16/2025 |
| 25-D-00043; Howard F. Curren AWTP Master Plan Update |
City of Tampa |
Florida |
S&L |
8/08/2025 |
9/11/2025 |
| 25-D-00039 Wastewater Pumping Station Rehabilitations Design Services |
City of Tampa |
Florida |
S&L |
8/07/2025 |
8/21/2025 |
| 25-D-00039 Wastewater Pumping Station Rehabilitations Design Services |
City of Tampa |
Florida |
S&L |
7/18/2025 |
8/21/2025 |
| 25-C-00026; Development Section Annual Contractor Agreement |
City of Tampa |
Florida |
S&L |
7/17/2025 |
7/15/2026 |
| 25-C-00026; Development Section Annual Contractor Agreement |
City of Tampa |
Florida |
S&L |
7/15/2025 |
7/15/2026 |
| 25-C-00026; Development Section Annual Contractor Agreement |
City of Tampa |
Florida |
S&L |
7/11/2025 |
7/15/2026 |
| 25-D-00034 Professional Engineering Consulting Services for the Department of Solid Waste and Environmental Program |
City of Tampa |
Florida |
S&L |
7/11/2025 |
8/14/2025 |
| 25-D-00015 Bermuda Boulevard Roadway and Seawall Improvements Project |
City of Tampa |
Florida |
S&L |
7/10/2025 |
7/24/2025 |
| 25-C-00026; Development Section Annual Contractor Agreement |
City of Tampa |
Florida |
S&L |
7/07/2025 |
7/15/2026 |
| 25-D-00015 Bermuda Boulevard Roadway and Seawall Improvements Project |
City of Tampa |
Florida |
S&L |
6/23/2025 |
7/24/2025 |
| 24-C-00015; El Prado Sidewalk S Omar Ave to Lois Ave & Lois Ave to Bayshore Blvd |
City of Tampa |
Florida |
S&L |
6/20/2025 |
6/24/2025 |
| 25-C-00026; Development Section Annual Contractor Agreement |
City of Tampa |
Florida |
S&L |
6/17/2025 |
7/08/2026 |
| 24-C-00015; El Prado Sidewalk S Omar Ave to Lois Ave & Lois Ave to Bayshore Blvd |
City of Tampa |
Florida |
S&L |
6/11/2025 |
6/24/2025 |
| 24-C-00015; El Prado Sidewalk S Omar Ave to Lois Ave & Lois Ave to Bayshore Blvd |
City of Tampa |
Florida |
S&L |
6/09/2025 |
6/17/2025 |
| 25-C-00026; Development Section Annual Contractor Agreement |
City of Tampa |
Florida |
S&L |
6/05/2025 |
7/08/2026 |
| 24-C-00038; Howard F. Curren AWTP Parking Lot Addition |
City of Tampa |
Florida |
S&L |
6/04/2025 |
6/10/2025 |
| 25-D-00027 FACILITIES MANAGEMENT MASTER PLANNING SERVICES |
City of Tampa |
Florida |
S&L |
6/03/2025 |
6/12/2025 |
| 24-C-00015; El Prado Sidewalk S Omar Ave to Lois Ave & Lois Ave to Bayshore Blvd |
City of Tampa |
Florida |
S&L |
5/22/2025 |
6/10/2025 |
| 24-C-00038; Howard F. Curren AWTP Parking Lot Addition |
City of Tampa |
Florida |
S&L |
5/21/2025 |
6/10/2025 |
| 25-C-00024 Howard F. Curren AWTP High Purity Oxygen Generation Facility Replacement Design Build |
City of Tampa |
Florida |
S&L |
5/16/2025 |
6/19/2025 |
| 25-C-00024 Howard F. Curren AWTP High Purity Oxygen Generation Facility Replacement Design Build |
City of Tampa |
Florida |
S&L |
5/15/2025 |
6/19/2025 |
| 24-C-00015; El Prado Sidewalk S Omar Ave to Lois Ave & Lois Ave to Bayshore Blvd |
City of Tampa |
Florida |
S&L |
5/09/2025 |
5/27/2025 |
| 24-C-00038; Howard F. Curren AWTP Parking Lot Addition |
City of Tampa |
Florida |
S&L |
5/09/2025 |
6/10/2025 |
| 24-C-00038; Howard F. Curren AWTP Parking Lot Addition |
City of Tampa |
Florida |
S&L |
5/08/2025 |
6/10/2025 |
| 24-C-00002; E/W Green Spine Cycle Track - PH 2A from Howard Ave. to Rome Ave. |
City of Tampa |
Florida |
S&L |
5/05/2025 |
5/13/2025 |
| 25-D-00027 FACILITIES MANAGEMENT MASTER PLANNING SERVICES |
City of Tampa |
Florida |
S&L |
5/01/2025 |
6/12/2025 |
| 24-C-00015; El Prado Sidewalk S Omar Ave to Lois Ave & Lois Ave to Bayshore Blvd |
City of Tampa |
Florida |
S&L |
4/25/2025 |
5/13/2025 |
| 24-C-00002; E/W Green Spine Cycle Track - PH 2A from Howard Ave. to Rome Ave. |
City of Tampa |
Florida |
S&L |
4/24/2025 |
5/13/2025 |
| 24-C-00021 Pam Iorio Parking Garage Elevator and Associated Modifications Design-Build |
City of Tampa |
Florida |
S&L |
4/24/2025 |
5/29/2025 |
| 25-D-00028 Howard F. Curren AWTP Electrical System Improvements Design Services |
City of Tampa |
Florida |
S&L |
4/11/2025 |
5/08/2025 |
| 25-C-00024 Howard F. Curren AWTP High Purity Oxygen Generation Facility Replacement Design Build |
City of Tampa |
Florida |
S&L |
4/11/2025 |
5/15/2025 |
| 25-D-00029 West Tampa CRA Grid Reestablishment Survey and Design Services |
City of Tampa |
Florida |
S&L |
4/09/2025 |
5/15/2025 |
| 24-C-00039 Manhattan Ave. Stormwater Improvements (Vasconia St. to Obispo St.) - Phase 1 |
City of Tampa |
Florida |
S&L |
4/07/2025 |
4/22/2025 |
| 25-C-00024 Howard F. Curren AWTP High Purity Oxygen Generation Facility Replacement Design Build |
City of Tampa |
Florida |
S&L |
4/03/2025 |
5/15/2025 |
| 25-D-00028 Howard F. Curren AWTP Electrical System Improvements Design Services |
City of Tampa |
Florida |
S&L |
4/03/2025 |
5/08/2025 |
| 24-C-00015; El Prado Sidewalk S Omar Ave to Lois Ave & Lois Ave to Bayshore Blvd |
City of Tampa |
Florida |
S&L |
4/02/2025 |
4/29/2025 |
| 25-D-00002 DESIGN ASSISTANCE SERVICES AND DEVELOPMENT CONSULTATION FOR CRA COMMERCIAL PRE-DEVELOPMENT GRANTS |
City of Tampa |
Florida |
S&L |
4/02/2025 |
4/10/2025 |
| 25-D-00023 Utility Locating Services ? Water Department |
City of Tampa |
Florida |
S&L |
4/01/2025 |
4/03/2025 |
| 24-C-00039 Manhattan Ave. Stormwater Improvements (Vasconia St. to Obispo St.) - Phase 1 |
City of Tampa |
Florida |
S&L |
3/27/2025 |
4/08/2025 |
| 24-C-00015; El Prado Sidewalk S Omar Ave to Lois Ave & Lois Ave to Bayshore Blvd |
City of Tampa |
Florida |
S&L |
3/20/2025 |
4/29/2025 |
| 24-C-00002; E/W Green Spine Cycle Track - PH 2A from Howard Ave. to Rome Ave. |
City of Tampa |
Florida |
S&L |
3/20/2025 |
4/29/2025 |
| 24-C-00021 Pam Iorio Parking Garage Elevator and Associated Modifications Design-Build |
City of Tampa |
Florida |
S&L |
3/20/2025 |
4/24/2025 |
| 25-D-00023 Utility Locating Services ? Water Department |
City of Tampa |
Florida |
S&L |
3/19/2025 |
4/03/2025 |
| 24-C-00039 Manhattan Ave. Stormwater Improvements (Vasconia St. to Obispo St.) - Phase 1 |
City of Tampa |
Florida |
S&L |
3/17/2025 |
4/01/2025 |
| 24-C-00039 Manhattan Ave. Stormwater Improvements (Vasconia St. to Obispo St.) - Phase 1 |
City of Tampa |
Florida |
S&L |
3/13/2025 |
3/25/2025 |
| 24-C-00039 Manhattan Ave. Stormwater Improvements (Vasconia St. to Obispo St.) - Phase 1 |
City of Tampa |
Florida |
S&L |
3/07/2025 |
3/25/2025 |
| 24-C-00039 Manhattan Ave. Stormwater Improvements (Vasconia St. to Obispo St.) - Phase 1 |
City of Tampa |
Florida |
S&L |
3/06/2025 |
3/25/2025 |
| 25-D-00002 DESIGN ASSISTANCE SERVICES AND DEVELOPMENT CONSULTATION FOR CRA COMMERCIAL PRE-DEVELOPMENT GRANTS |
City of Tampa |
Florida |
S&L |
3/06/2025 |
4/10/2025 |
| 25-D-00021 Howard F. Curren AWTP Junction Chamber No.1 Odor Control System Replacement Design |
City of Tampa |
Florida |
S&L |
3/06/2025 |
4/03/2025 |
| 25-D-00021 Howard F. Curren AWTP Junction Chamber No.1 Odor Control System Replacement Design |
City of Tampa |
Florida |
S&L |
2/28/2025 |
4/03/2025 |
| 25-D-00021 Howard F. Curren AWTP Junction Chamber No.1 Odor Control System Replacement Design |
City of Tampa |
Florida |
S&L |
2/27/2025 |
4/03/2025 |
| 25-D-00023 Utility Locating Services ? Water Department |
City of Tampa |
Florida |
S&L |
2/27/2025 |
3/17/2025 |
| 25-C-00010; 30th Street (USF) Force Main Relocation |
City of Tampa |
Florida |
S&L |
2/20/2025 |
3/25/2025 |
| 24-C-00039 Manhattan Ave. Stormwater Improvements (Vasconia St. to Obispo St.) - Phase 1 |
City of Tampa |
Florida |
S&L |
2/18/2025 |
3/11/2025 |
| 25-D-00400 B Additional Firms for Work Order Agreements For AE Services As Needed |
City of Tampa |
Florida |
S&L |
2/11/2025 |
4/24/2025 |
| 24-C-00039 Manhattan Ave. Stormwater Improvements (Vasconia St. to Obispo St.) - Phase 1 |
City of Tampa |
Florida |
S&L |
2/10/2025 |
3/11/2025 |
| 25-D-00400 B ; Work Order Agreements For Professional Services As Needed |
City of Tampa |
Florida |
S&L |
2/10/2025 |
4/24/2025 |
| 25-C-00013; Citywide Wastewater Collection Systems Repair FY25 - REBID |
City of Tampa |
Florida |
S&L |
2/07/2025 |
3/11/2025 |
| 25-D-00002 DESIGN ASSISTANCE SERVICES AND DEVELOPMENT CONSULTATION FOR CRA COMMERCIAL PRE-DEVELOPMENT GRANTS |
City of Tampa |
Florida |
S&L |
1/31/2025 |
3/06/2025 |
| 25-D-00008 CRA Multi-District Wayfinding Signing Design |
City of Tampa |
Florida |
S&L |
1/17/2025 |
2/20/2025 |
| CRA Multi-District Wayfinding Signing Design |
City of Tampa |
Florida |
S&L |
1/16/2025 |
1/20/2025 |
| 25-C-00012; Wastewater Gravity Sewer Rehabilitation by Cured-in-Place (CIPP) - FY25 |
City of Tampa |
Florida |
S&L |
12/23/2024 |
1/07/2025 |
| 25-C-00013; Citywide Wastewater Collection Systems Repair - FY25 |
City of Tampa |
Florida |
S&L |
12/18/2024 |
1/28/2025 |
| 25-D-00008 CRA Multi-District Wayfinding Signing Design |
City of Tampa |
Florida |
S&L |
12/12/2024 |
1/16/2025 |
| 25-C-00012; Wastewater Gravity Sewer Rehabilitation by Cured-in-Place (CIPP) - FY25 |
City of Tampa |
Florida |
S&L |
11/25/2024 |
1/07/2025 |
| 24-C-00041; Ditch Rehabilitation - Grady Avenue & 43rd Street-REBID |
City of Tampa |
Florida |
S&L |
11/14/2024 |
12/17/2024 |
| RFQ-25-D-00014 Coachman Avenue Wastewater Improvements Design |
City of Tampa |
Florida |
S&L |
11/14/2024 |
12/19/2024 |
| 25-C-00005 Decentralized Fleet Maintenance Facility Solid Waste Design-Build |
City of Tampa |
Florida |
S&L |
11/14/2024 |
11/19/2024 |
| 25-C-00001 Sulphur Springs Pump Station Rehabilitation Design-Build |
City of Tampa |
Florida |
S&L |
11/07/2024 |
12/12/2024 |
| 24-C-00025 FY24 Citywide Sidewalk Improvements Design-Build |
City of Tampa |
Florida |
S&L |
11/01/2024 |
12/05/2024 |
| 23-C-00023; Swann Pump Station Generator Installation ReBid |
City of Tampa |
Florida |
S&L |
10/21/2024 |
11/26/2024 |
| 24-D-00040 New Fire Fleet Maintenance Building Assessment |
City of Tampa |
Florida |
S&L |
10/17/2024 |
10/31/2024 |
| 24-C-00030; Branch PS Collection System Sewer Rehabilitation by CIPP Lining |
City of Tampa |
Florida |
S&L |
10/16/2024 |
10/29/2024 |
| 24-C-00041; Ditch Rehabilitation - Grady Avenue & 43rd Street |
City of Tampa |
Florida |
S&L |
10/16/2024 |
10/29/2024 |
| 24-C-00025 FY24 Citywide Sidewalk Improvements Design-Build |
City of Tampa |
Florida |
S&L |
10/15/2024 |
10/31/2024 |
| 24-D-00040 New Fire Fleet Maintenance Building Assessment |
City of Tampa |
Florida |
S&L |
10/15/2024 |
10/31/2024 |
| 24-C-00030; Branch PS Collection System Sewer Rehabilitation by CIPP Lining |
City of Tampa |
Florida |
S&L |
10/07/2024 |
10/22/2024 |
| 25-C-00001 Sulphur Springs Pump Station Rehabilitation Design-Build |
City of Tampa |
Florida |
S&L |
10/03/2024 |
11/07/2024 |
| 24-C-00025 FY24 Citywide Sidewalk Improvements Design-Build |
City of Tampa |
Florida |
S&L |
9/23/2024 |
10/24/2024 |
| 24-D-00031 Streetcar Extension Project Development |
City of Tampa |
Florida |
S&L |
9/20/2024 |
10/24/2024 |
| 24-C-00041; Ditch Rehabilitation - Grady Avenue & 43rd Street |
City of Tampa |
Florida |
S&L |
9/19/2024 |
10/22/2024 |
| 24-C-00025 FY24 Citywide Sidewalk Improvements Design-Build |
City of Tampa |
Florida |
S&L |
9/19/2024 |
10/24/2024 |