| Site Grading (Superior 115kV Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
7/03/2026 |
7/17/2026 |
| Workers' Compensation Third-Party Administrator Services |
Nebraska Public Power District |
Nebraska |
S&L |
7/01/2026 |
7/30/2026 |
| Prefabricated Control Building for a 345kV Substation, Princeton Road Station |
Nebraska Public Power District |
Nebraska |
S&L |
6/19/2026 |
7/09/2026 |
| Combustion Turbine - Generator Step-Up 345kV/19.5kV 350 MVA Power Transformers for Beatrice Power Station |
Nebraska Public Power District |
Nebraska |
S&L |
6/17/2026 |
7/20/2026 |
| 115kV Low Tension Dead-End Tubular Structure (Seward Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
6/16/2026 |
6/29/2026 |
| Unit 1 Boiler Reheat Superheater Replacement Installation (Sheldon Station) |
Nebraska Public Power District |
Nebraska |
S&L |
6/12/2026 |
7/14/2026 |
| Substation Modifications (Keystone 345kV Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
6/11/2026 |
7/10/2026 |
| Substation Control Panels (North Platte Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
6/11/2026 |
6/26/2026 |
| Procurement of Nutanix Hardware & Software Maintenance Renewal |
Nebraska Public Power District |
Nebraska |
S&L |
5/29/2026 |
6/08/2026 |
| Prefabricated Control Building for a 345kV Substation, Princeton Road Station |
Nebraska Public Power District |
Nebraska |
S&L |
5/21/2026 |
6/25/2026 |
| Provide Independent Audits of the Basic Financial Statements, Other Post-Employment Benefit Plan, and Retirement Plans |
Nebraska Public Power District |
Nebraska |
S&L |
5/15/2026 |
6/15/2026 |
| Above-Grade Substation Construction Services for a Multi Year Term |
Nebraska Public Power District |
Nebraska |
S&L |
5/14/2026 |
6/02/2026 |
| Prefabricated Control Building for 115kV Substation (Seward Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
5/13/2026 |
5/27/2026 |
| Foreign Material Exclusion and Firewatch Services (Cooper Nuclear Station) |
Nebraska Public Power District |
Nebraska |
S&L |
5/05/2026 |
5/26/2026 |
| Reheat Outlet Header & Stub Tube Replacement, Unit 1 Boiler at Gerald Gentleman Station |
Nebraska Public Power District |
Nebraska |
S&L |
5/04/2026 |
5/21/2026 |
| Above-Grade Substation Construction Services for a Multi Year Term |
Nebraska Public Power District |
Nebraska |
S&L |
5/01/2026 |
5/27/2026 |
| Substation Modifications (Crooked Creek 230kV Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
4/30/2026 |
5/28/2026 |
| Distribution Transformers for a Multi Year Term |
Nebraska Public Power District |
Nebraska |
S&L |
4/30/2026 |
5/13/2026 |
| ACSR Cable |
Nebraska Public Power District |
Nebraska |
S&L |
4/28/2026 |
5/12/2026 |
| Substation Structural Steel for a Multi Year Term |
Nebraska Public Power District |
Nebraska |
S&L |
4/27/2026 |
5/13/2026 |
| Procurement of Hardware (Nutanix Hardware Refresh 2026) |
Nebraska Public Power District |
Nebraska |
S&L |
4/22/2026 |
4/28/2026 |
| Prefabricated Control Building for 115kV Substation (Princeton Road Station) |
Nebraska Public Power District |
Nebraska |
S&L |
4/10/2026 |
4/29/2026 |
| Ash Disposal Facility West Cell Modification at Gerald Gentleman Station |
Nebraska Public Power District |
Nebraska |
S&L |
4/08/2026 |
5/05/2026 |
| Main Condenser Retube at Cooper Nuclear Station |
Nebraska Public Power District |
Nebraska |
S&L |
4/02/2026 |
7/24/2026 |
| Condenser Neck Feedwater Heater Re-bundle or Replacement at Cooper Nuclear Station |
Nebraska Public Power District |
Nebraska |
S&L |
4/01/2026 |
7/24/2026 |
| Removal and Installation of Shield Wire Insulators and Aerial Numbers on Transmission Lines |
Nebraska Public Power District |
Nebraska |
S&L |
4/01/2026 |
5/05/2026 |
| Substation Commissioning and Testing for a Multi Year Term |
Nebraska Public Power District |
Nebraska |
S&L |
3/31/2026 |
4/27/2026 |
| Arresters - AWARDED TO: Border States Electric |
Nebraska Public Power District |
Nebraska |
S&L |
3/26/2026 |
3/20/2026 |
| Maintenance Services for the Main Condensate Pump, Main Condensate Booster Pump, Rebuild and Replace Reactor Recirculation Pump Seals A&B at… |
Nebraska Public Power District |
Nebraska |
S&L |
3/25/2026 |
4/06/2026 |
| Disassembly, Reassembly, Vacuum Fill, Commission, and Testing of a Power Transformer (Hoskins 345kV and Crooked Creek 230kV Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
3/20/2026 |
4/21/2026 |
| Machinist Support for 2026 Fall Refueling Outage (Cooper Nuclear Station) - AWARDED TO: Continental Field Systems, Inc. |
Nebraska Public Power District |
Nebraska |
S&L |
3/18/2026 |
2/19/2026 |
| Check Point Annual Software Renewal |
Nebraska Public Power District |
Nebraska |
S&L |
3/17/2026 |
3/24/2026 |
| Installation of Buried Fiber Optic Cable |
Nebraska Public Power District |
Nebraska |
S&L |
3/10/2026 |
4/14/2026 |
| Optical Ground Wire |
Nebraska Public Power District |
Nebraska |
S&L |
3/10/2026 |
3/31/2026 |
| Substation Control Panels (Keystone Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
3/10/2026 |
3/30/2026 |
| Maintenance Services for the Main Condensate Pump, Main Condensae Booster Pump, Rebuild and Replace Reactor Recirculation Pump Seals A&B at… |
Nebraska Public Power District |
Nebraska |
S&L |
3/09/2026 |
4/06/2026 |
| Arresters |
Nebraska Public Power District |
Nebraska |
S&L |
3/06/2026 |
3/20/2026 |
| Mechanical Technician Staff Augmentation Services for Cooper Nuclear Station |
Nebraska Public Power District |
Nebraska |
S&L |
2/25/2026 |
3/06/2026 |
| Underground Conduit & Electrical Structure Placement (York, NE) |
Nebraska Public Power District |
Nebraska |
S&L |
2/23/2026 |
3/06/2026 |
| Renewal Energy for Steele Flats Wind Farm |
Nebraska Public Power District |
Nebraska |
S&L |
2/20/2026 |
3/06/2026 |
| Underground Cable |
Nebraska Public Power District |
Nebraska |
S&L |
2/12/2026 |
2/27/2026 |
| Substation Control Panels (Neligh Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
2/02/2026 |
2/16/2026 |
| 345kV High Bus Support Stand Structure (Big Blue 345kV Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
1/30/2026 |
2/06/2026 |
| Inspection and Testing Services for the Fire Protection and Alarm Systems at Various Nebraska Public Power District Non-Nuclear Generating Facilities |
Nebraska Public Power District |
Nebraska |
S&L |
1/26/2026 |
3/10/2026 |
| Unit 2 Freight Elevator Modernization (Gerald Gentleman Station) |
Nebraska Public Power District |
Nebraska |
S&L |
1/23/2026 |
2/17/2026 |
| Mechanical Technician Staff Augmentation Services for Cooper Nuclear Station |
Nebraska Public Power District |
Nebraska |
S&L |
1/22/2026 |
2/26/2026 |
| Valve Replacements and Refurbishments (Cooper Nuclear Station) |
Nebraska Public Power District |
Nebraska |
S&L |
1/19/2026 |
2/05/2026 |
| Procurement of CISCO SmartNet Support |
Nebraska Public Power District |
Nebraska |
S&L |
1/16/2026 |
1/23/2026 |
| Procurement of Software Maintenance (VMware Support 2026) - CANCELLED |
Nebraska Public Power District |
Nebraska |
S&L |
1/15/2026 |
1/21/2026 |
| Machinist Support for 2026 Fall Refueling Outage (Cooper Nuclear Station) |
Nebraska Public Power District |
Nebraska |
S&L |
1/15/2026 |
2/19/2026 |
| Valve Replacements and Refurbishments (Cooper Nuclear Station) |
Nebraska Public Power District |
Nebraska |
S&L |
1/15/2026 |
1/29/2026 |
| 2026, 16,500 GVWR, 4x4, Crew Cab, Cab Chassis |
Nebraska Public Power District |
Nebraska |
S&L |
1/13/2026 |
1/30/2026 |
| 2026, Three Quarter Ton, 4x4, Pickup Truck |
Nebraska Public Power District |
Nebraska |
S&L |
1/13/2026 |
1/30/2026 |
| 2026, 19,000 GVWR, Crew Cab, 4x4 Cab Chassis |
Nebraska Public Power District |
Nebraska |
S&L |
1/13/2026 |
1/30/2026 |
| 2026, Half Ton, 4x4, Pickup Truck |
Nebraska Public Power District |
Nebraska |
S&L |
1/13/2026 |
1/30/2026 |
| Procurement of Software Subscription (Nutanix Support 2026) |
Nebraska Public Power District |
Nebraska |
S&L |
1/13/2026 |
1/21/2026 |
| 2026, One Ton, 4x4, Crew Cab, Dual Rear Wheel, Cab Chassis |
Nebraska Public Power District |
Nebraska |
S&L |
1/13/2026 |
1/30/2026 |
| Procurement of Software Maintenance (VMware Support 2026) |
Nebraska Public Power District |
Nebraska |
S&L |
1/13/2026 |
1/21/2026 |
| 2026, One Ton, 4x4, Crew Cab, Single Rear Wheel, Cab Chassis |
Nebraska Public Power District |
Nebraska |
S&L |
1/13/2026 |
1/30/2026 |
| 2026, One Ton, Single Rear Wheel, Pickup Truck |
Nebraska Public Power District |
Nebraska |
S&L |
1/13/2026 |
1/30/2026 |
| Procurement of Hardware Maintenance (Exagrid Support 2026) |
Nebraska Public Power District |
Nebraska |
S&L |
1/12/2026 |
1/19/2026 |
| Procurement of Nutanix Hardware Refresh 2026 |
Nebraska Public Power District |
Nebraska |
S&L |
1/12/2026 |
1/19/2026 |
| 2026 Distribution Line Tree Clearing and Brush Removal of Multiple Distribution Lines |
Nebraska Public Power District |
Nebraska |
S&L |
1/09/2026 |
2/10/2026 |
| Substation Control Panels (North Platte Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
1/08/2026 |
1/30/2026 |
| 60 Foot Over-Center Articulating Aerial Lift with Material Handling Jib (Fleet Services) |
Nebraska Public Power District |
Nebraska |
S&L |
12/26/2025 |
1/22/2026 |
| Digger Derrick (Fleet Services) |
Nebraska Public Power District |
Nebraska |
S&L |
12/26/2025 |
1/22/2026 |
| 60 Foot Insulated Articulating Telescoping Material Handler Category C Aerial Devices (Fleet Services) |
Nebraska Public Power District |
Nebraska |
S&L |
12/26/2025 |
1/22/2026 |
| SAP Business Data Cloud Implementation Support |
Nebraska Public Power District |
Nebraska |
S&L |
12/22/2025 |
1/30/2026 |
| Unit 2 Freight Elevator Modernization (Gerald Gentleman Station) |
Nebraska Public Power District |
Nebraska |
S&L |
12/18/2025 |
2/03/2026 |
| Valve Replacements and Refurbishments (Cooper Nuclear Station |
Nebraska Public Power District |
Nebraska |
S&L |
12/18/2025 |
1/29/2026 |
| Relocation of TL1099 around Princeton Road Station Site |
Nebraska Public Power District |
Nebraska |
S&L |
12/16/2025 |
1/15/2026 |
| OPSWAT Software License Renewal |
Nebraska Public Power District |
Nebraska |
S&L |
12/11/2025 |
12/18/2025 |
| Industrial Cleaning - Vacuuming and Hydro-Blasting Services (Sheldon Station) |
Nebraska Public Power District |
Nebraska |
S&L |
12/10/2025 |
1/20/2026 |
| Lincoln Area Office Addition |
Nebraska Public Power District |
Nebraska |
S&L |
12/10/2025 |
1/15/2026 |
| Substation Control Panels (Central City Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
12/09/2025 |
12/31/2025 |
| SAP SuccessFactors Onboarding, Offboarding, Crossboarding Implementation Services |
Nebraska Public Power District |
Nebraska |
S&L |
12/08/2025 |
1/23/2026 |
| 345kV Full Tension Dead-End Structure (Tobias 345kV Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
12/08/2025 |
12/31/2025 |
| Unit 1 Air Heater Hydro-Cleaning Services at Gerald Gentleman Station |
Nebraska Public Power District |
Nebraska |
S&L |
12/03/2025 |
12/17/2025 |
| BigID Licensed Software Renewal |
Nebraska Public Power District |
Nebraska |
S&L |
12/02/2025 |
12/09/2025 |
| 345kV Full Tension Dead-End Structure (Tobias 345kV Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
12/02/2025 |
12/15/2025 |
| Procurement of a Network Management System Telecom Fiber Equipment |
Nebraska Public Power District |
Nebraska |
S&L |
11/21/2025 |
12/10/2025 |
| BigID Licensed Software Renewal |
Nebraska Public Power District |
Nebraska |
S&L |
11/18/2025 |
12/01/2025 |
| Unit 1 Circulating and Reservoir Water Pump Spare Motor at Gerald Gentleman Station |
Nebraska Public Power District |
Nebraska |
S&L |
11/18/2025 |
1/15/2026 |
| Unit 1 Circulating and Reservoir Water Pump Spare Motor at Gerald Gentleman Station |
Nebraska Public Power District |
Nebraska |
S&L |
11/17/2025 |
12/03/2025 |
| Underdrain Rehabilitation Mile Post 5.43 |
Nebraska Public Power District |
Nebraska |
S&L |
11/13/2025 |
12/10/2025 |
| Expression of Interest for Engineering, Procurement and Construction Contractor (SCCT Facility) |
Nebraska Public Power District |
Nebraska |
S&L |
11/07/2025 |
12/04/2025 |
| Tree Removal and Land Grubbing at Princeton Road Station Site |
Nebraska Public Power District |
Nebraska |
S&L |
11/07/2025 |
12/02/2025 |
| Electrode Boiler Chemcial Cleaning at Cooper Nuclear Station |
Nebraska Public Power District |
Nebraska |
S&L |
11/06/2025 |
12/04/2025 |
| Tree Trimming and Vegetation Control of Multiple 345kV Transmission Lines |
Nebraska Public Power District |
Nebraska |
S&L |
11/05/2025 |
12/04/2025 |
| Tree Trimming and Vegetation Control of Multiple Transmission Lines |
Nebraska Public Power District |
Nebraska |
S&L |
11/04/2025 |
12/02/2025 |
| H-Frame Crossarm Assemblies |
Nebraska Public Power District |
Nebraska |
S&L |
11/03/2025 |
11/12/2025 |
| Cable and Wire |
Nebraska Public Power District |
Nebraska |
S&L |
10/28/2025 |
11/21/2025 |
| Medium Voltage Capacitor Banks and Replacement Units |
Nebraska Public Power District |
Nebraska |
S&L |
10/28/2025 |
11/19/2025 |
| Perform Eddy Current Testing Services During Spring Unit 1 Outage (Gerald Gentleman Station) |
Nebraska Public Power District |
Nebraska |
S&L |
10/24/2025 |
11/12/2025 |
| Unit 1 Main Condenser, Cooling Water Heat Exchanger and Boiler Feed Pump Condenser Tube Cleaning at Gerald Gentleman Station |
Nebraska Public Power District |
Nebraska |
S&L |
10/24/2025 |
11/12/2025 |
| Unit 1 Circulating and Reservoir Water Pump Spare Motor at Gerald Gentleman Station |
Nebraska Public Power District |
Nebraska |
S&L |
10/23/2025 |
11/19/2025 |
| Walkdown Opportunity - Unit 1 Forced Draft (FD) Fan Overhaul at Sheldon Station |
Nebraska Public Power District |
Nebraska |
S&L |
10/22/2025 |
12/19/2025 |
| Hallam Combustion Turbine "B" Engine Overhaul at Sheldon Station |
Nebraska Public Power District |
Nebraska |
S&L |
10/15/2025 |
11/05/2025 |
| Vehicle Maintenance Services (Brownville) |
Nebraska Public Power District |
Nebraska |
S&L |
10/08/2025 |
10/27/2025 |
| 69 x 34.5 kV - 12.47 kV 12.5 MVA Power Transformer |
Nebraska Public Power District |
Nebraska |
S&L |
10/03/2025 |
11/04/2025 |
| Substation Modifications (McCool 345kV Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
10/02/2025 |
10/31/2025 |
| Substation Control Panels (Guide Rock Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
10/01/2025 |
10/10/2025 |
| Septic Tank Pumping (Cooper Nuclear Station) |
Nebraska Public Power District |
Nebraska |
S&L |
9/30/2025 |
11/28/2025 |
| Substation Control Panels (Creighton Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
9/23/2025 |
10/01/2025 |
| Renewal Energy for Steele Flats Wind Farm |
Nebraska Public Power District |
Nebraska |
S&L |
9/18/2025 |
10/02/2025 |
| Procurement of Varonis SaaS Software Renewal |
Nebraska Public Power District |
Nebraska |
S&L |
9/16/2025 |
9/24/2025 |
| Proofpoint Annual Software Renewal |
Nebraska Public Power District |
Nebraska |
S&L |
9/16/2025 |
9/24/2025 |
| Maintenance and Modification Support Services at Cooper Nuclear Station |
Nebraska Public Power District |
Nebraska |
S&L |
9/16/2025 |
10/15/2025 |
| 125 Foot Insulated Class "A" Aerial Device |
Nebraska Public Power District |
Nebraska |
S&L |
9/16/2025 |
10/08/2025 |
| Procurement of Varonis SaaS Software Renewal |
Nebraska Public Power District |
Nebraska |
S&L |
9/12/2025 |
9/19/2025 |
| Craft Labor and Maintenance Modification Support Energy Supply Facilities |
Nebraska Public Power District |
Nebraska |
S&L |
9/09/2025 |
10/14/2025 |
| Unit 2 Cooling Water Heat Exchanger Replacement for Gerald Gentleman Station |
Nebraska Public Power District |
Nebraska |
S&L |
9/09/2025 |
10/14/2025 |
| Kearney Canal Replacement of Irrigation Taps No. 4 and No. 13 |
Nebraska Public Power District |
Nebraska |
S&L |
9/08/2025 |
9/30/2025 |
| Uninterruptible Power Supply Installation (Doniphan Control Center) |
Nebraska Public Power District |
Nebraska |
S&L |
8/28/2025 |
9/15/2025 |
| 125 Foot Insulated Class "A" Aerial Device |
Nebraska Public Power District |
Nebraska |
S&L |
8/27/2025 |
9/24/2025 |
| ACSR Cable |
Nebraska Public Power District |
Nebraska |
S&L |
8/27/2025 |
9/09/2025 |
| Uniterruptible Power Supply Installation (Doniphan Control Center) |
Nebraska Public Power District |
Nebraska |
S&L |
8/18/2025 |
9/15/2025 |
| Remove Old Highway 25 Bridge |
Nebraska Public Power District |
Nebraska |
S&L |
8/18/2025 |
9/04/2025 |
| Vehicle Maintenance Services (South Sioux City) |
Nebraska Public Power District |
Nebraska |
S&L |
8/08/2025 |
8/18/2025 |
| Vehicle Maintenance Services (Norfolk) |
Nebraska Public Power District |
Nebraska |
S&L |
8/08/2025 |
8/18/2025 |
| Electronic Safety Analysis Report Update and Management |
Nebraska Public Power District |
Nebraska |
S&L |
8/01/2025 |
9/02/2025 |
| Concrete Work on the Canal South of Keystone Nebraska |
Nebraska Public Power District |
Nebraska |
S&L |
8/01/2025 |
8/29/2025 |
| Paxton Siphon Crossing and Drain Extension, and Hershey Drain Culvert Replacement |
Nebraska Public Power District |
Nebraska |
S&L |
7/31/2025 |
8/12/2025 |
| Refurbishment of the Unit 2 Forced Draft Fan Rotor Assembly at Gerald Gentleman Station |
Nebraska Public Power District |
Nebraska |
S&L |
7/29/2025 |
8/26/2025 |
| Refurbishment of the Unit 1 Induced Draft Fan Rotor Assembly at Gerald Gentleman Station |
Nebraska Public Power District |
Nebraska |
S&L |
7/29/2025 |
8/26/2025 |
| North Platte Hydro Tailrace Drainage Improvements |
Nebraska Public Power District |
Nebraska |
S&L |
7/22/2025 |
8/12/2025 |
| Air Core Reactor, 8.314KV, 1179A, 9800KVA |
Nebraska Public Power District |
Nebraska |
S&L |
7/15/2025 |
8/04/2025 |
| Paxton Siphon Crossing and Drain Extension, and Hershey Drain Culvert Replacment |
Nebraska Public Power District |
Nebraska |
S&L |
7/15/2025 |
8/12/2025 |
| Spencer Hydro / Dam Decommissioning |
Nebraska Public Power District |
Nebraska |
S&L |
7/15/2025 |
8/05/2025 |
| Installation of Buried Fiber Optic Cable at Lake Maloney |
Nebraska Public Power District |
Nebraska |
S&L |
7/14/2025 |
8/11/2025 |
| Procurement of CrowdStrike Software Subscription Renewal |
Nebraska Public Power District |
Nebraska |
S&L |
7/11/2025 |
7/18/2025 |
| ACSR Conductor |
Nebraska Public Power District |
Nebraska |
S&L |
7/08/2025 |
7/18/2025 |
| H-Frame Crossarm Assemblies |
Nebraska Public Power District |
Nebraska |
S&L |
7/08/2025 |
7/11/2025 |
| 145 Foot Aerial Device |
Nebraska Public Power District |
Nebraska |
S&L |
7/07/2025 |
7/16/2025 |
| North Platte Hydropower Generation Facility Bypass Analysis |
Nebraska Public Power District |
Nebraska |
S&L |
7/03/2025 |
8/21/2025 |
| Cable, Wire and Related Materials |
Nebraska Public Power District |
Nebraska |
S&L |
7/01/2025 |
7/15/2025 |
| Main Steam Stop Valve Unit 2, Sheldon Station |
Nebraska Public Power District |
Nebraska |
S&L |
6/30/2025 |
8/04/2025 |
| Procurement of Veeam Software Subscription Renewal |
Nebraska Public Power District |
Nebraska |
S&L |
6/26/2025 |
7/08/2025 |
| Multiple Generation Power Transformers (Princeton Road Station) |
Nebraska Public Power District |
Nebraska |
S&L |
6/18/2025 |
8/01/2025 |
| Reservoir East Intake Channel and Mixing Basin Dredging (Gerald Gentleman Station) |
Nebraska Public Power District |
Nebraska |
S&L |
6/17/2025 |
7/15/2025 |
| Maintenance and Testing a 345 kV Auto Transformer (Cooper Nuclear Station) |
Nebraska Public Power District |
Nebraska |
S&L |
6/13/2025 |
7/15/2025 |
| Spencer Hydro / Dam Decommissioning |
Nebraska Public Power District |
Nebraska |
S&L |
6/12/2025 |
7/22/2025 |
| 145 Foot Aerial Device |
Nebraska Public Power District |
Nebraska |
S&L |
6/11/2025 |
7/03/2025 |
| 72.5 - 380kV Independent Pole-Operated and Power Circuit Breakers for NPPD |
Nebraska Public Power District |
Nebraska |
S&L |
6/09/2025 |
6/20/2025 |
| Multiple Generation Power Transformers (Princeton Road Station) |
Nebraska Public Power District |
Nebraska |
S&L |
6/06/2025 |
7/11/2025 |
| Evergreen Bridge Replacement |
Nebraska Public Power District |
Nebraska |
S&L |
6/06/2025 |
7/02/2025 |
| Procurement of Citrix Software Maintenance |
Nebraska Public Power District |
Nebraska |
S&L |
6/05/2025 |
6/12/2025 |
| Installation of Monitoring Wells at Sheldon Station |
Nebraska Public Power District |
Nebraska |
S&L |
6/04/2025 |
6/12/2025 |
| "A" Side Extraction Steam Pipe Upgrade (CNS) |
Nebraska Public Power District |
Nebraska |
S&L |
6/02/2025 |
7/15/2025 |
| Nutanix Software Maintenance Renewal |
Nebraska Public Power District |
Nebraska |
S&L |
6/02/2025 |
6/11/2025 |
| Procurement of Citrix Software Maintenance |
Nebraska Public Power District |
Nebraska |
S&L |
5/30/2025 |
6/09/2025 |
| Provide Engineering, Routing, Design, Right-of-Way and Construction Management Services for Various New Transmission Lines |
Nebraska Public Power District |
Nebraska |
S&L |
5/28/2025 |
7/14/2025 |
| 72.5 - 380kV Independent Pole-Operated and Power Circuit Breakers for NPPD |
Nebraska Public Power District |
Nebraska |
S&L |
5/15/2025 |
6/16/2025 |
| Installation of Monitoring Wells at Sheldon Station |
Nebraska Public Power District |
Nebraska |
S&L |
5/15/2025 |
6/05/2025 |
| Removal and Installation of Conductor Dampers |
Nebraska Public Power District |
Nebraska |
S&L |
5/13/2025 |
6/17/2025 |
| Removal and Installation of Shield Wire Insulators and Aerial Numbers on Transmission Lines |
Nebraska Public Power District |
Nebraska |
S&L |
5/05/2025 |
6/03/2025 |
| Unit 2 Boiler Reheat Superheater Replacement Installation (Sheldon Station) |
Nebraska Public Power District |
Nebraska |
S&L |
4/29/2025 |
7/15/2025 |
| Bassett Garage Building |
Nebraska Public Power District |
Nebraska |
S&L |
4/28/2025 |
5/30/2025 |
| Large Bathroom Remodel |
Nebraska Public Power District |
Nebraska |
S&L |
4/28/2025 |
5/20/2025 |
| Main Steam Stop Valve Installation - Walkdown Opportunity Unit 2 Boiler Sheldon Station |
Nebraska Public Power District |
Nebraska |
S&L |
4/23/2025 |
5/15/2025 |
| Provide Transmission Line Engineering Services |
Nebraska Public Power District |
Nebraska |
S&L |
4/22/2025 |
5/27/2025 |
| Provide Substation Engineering Services |
Nebraska Public Power District |
Nebraska |
S&L |
4/22/2025 |
5/27/2025 |
| Application Maintenance Services for SAP SuccessFactors |
Nebraska Public Power District |
Nebraska |
S&L |
4/12/2025 |
5/08/2025 |
| Instrument Air Compressors (Sheldon Station) |
Nebraska Public Power District |
Nebraska |
S&L |
4/09/2025 |
4/30/2025 |
| HSM Electrical Conduit/Cable Work |
Nebraska Public Power District |
Nebraska |
S&L |
4/09/2025 |
4/18/2025 |
| Device42 IT Operations Management Software |
Nebraska Public Power District |
Nebraska |
S&L |
4/08/2025 |
4/15/2025 |
| SAP SuccessFactors Learning System Implementation Services |
Nebraska Public Power District |
Nebraska |
S&L |
4/04/2025 |
4/11/2025 |
| Reheat Superheater Replacement - Walkdown Opportunity Unit 1 Boiler at Sheldon Station |
Nebraska Public Power District |
Nebraska |
S&L |
4/04/2025 |
6/01/2025 |
| Foreign Material Exclusion (FME) Oversight and Control with Firewatch of Dry Fuel Storage Program |
Nebraska Public Power District |
Nebraska |
S&L |
4/04/2025 |
5/15/2025 |
| Assessment of Dry Fuel Storage Program |
Nebraska Public Power District |
Nebraska |
S&L |
4/04/2025 |
5/07/2025 |
| Industrial Cleaning - Grit Blasting, Vacuuming, Online Deslagging and Hydroblasting Services (Gerald Gentleman Station) |
Nebraska Public Power District |
Nebraska |
S&L |
4/01/2025 |
5/06/2025 |
| Underground Conduit & Electrical Structure Placement (Pawnee City, NE) |
Nebraska Public Power District |
Nebraska |
S&L |
4/01/2025 |
5/01/2025 |
| HSM Electrical Conduit/Cable Work |
Nebraska Public Power District |
Nebraska |
S&L |
3/28/2025 |
4/11/2025 |
| Replacement Gates at Dawson County Diversion Structure |
Nebraska Public Power District |
Nebraska |
S&L |
3/25/2025 |
4/22/2025 |
| Nutanix Software Renewal |
Nebraska Public Power District |
Nebraska |
S&L |
3/25/2025 |
4/02/2025 |
| Underground Cable |
Nebraska Public Power District |
Nebraska |
S&L |
3/25/2025 |
4/01/2025 |
| CISCO Equipment |
Nebraska Public Power District |
Nebraska |
S&L |
3/20/2025 |
3/28/2025 |
| Check Point Software Renewal |
Nebraska Public Power District |
Nebraska |
S&L |
3/13/2025 |
3/20/2025 |
| Injection Well Surface Infrastructure and Pumps (Gerald Gentleman Station) |
Nebraska Public Power District |
Nebraska |
S&L |
3/11/2025 |
4/08/2025 |
| Distribution Line Tree Clearing and Brush Removal of Multiple Distribution Lines |
Nebraska Public Power District |
Nebraska |
S&L |
3/10/2025 |
4/04/2025 |
| SAP SuccessFactors Learning System Implementation Services |
Nebraska Public Power District |
Nebraska |
S&L |
3/04/2025 |
3/28/2025 |
| Third Party Cyber Risk Analysis and Rating Program |
Nebraska Public Power District |
Nebraska |
S&L |
3/04/2025 |
3/25/2025 |
| Drilled Pier Foundations for the New Norfolk to Stanton North 115kV Transmission Line |
Nebraska Public Power District |
Nebraska |
S&L |
2/21/2025 |
3/24/2025 |
| 15 kV Generator Circuit Breaker Replacement (Beatrice Power Station) |
Nebraska Public Power District |
Nebraska |
S&L |
2/14/2025 |
2/27/2025 |
| Installation of Buried Fiber Optic Cable South of Ainsworth, Nebraska |
Nebraska Public Power District |
Nebraska |
S&L |
2/13/2025 |
3/21/2025 |
| Aquatic Vegetation Control |
Nebraska Public Power District |
Nebraska |
S&L |
2/13/2025 |
2/26/2025 |
| Substation Control Panels (McCool AC/DC Distribution Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
2/04/2025 |
2/17/2025 |
| Substation Control Panels (Columbus East Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
1/30/2025 |
2/11/2025 |
| Water Systems Vegetation Control |
Nebraska Public Power District |
Nebraska |
S&L |
1/28/2025 |
2/18/2025 |
| Princeton Road Station Simple Cycle and Reciprocating Internal Combustion Engine Generation Facility Project Geotechnical Investigation |
Nebraska Public Power District |
Nebraska |
S&L |
1/23/2025 |
2/12/2025 |
| 2025 CISCO Flex Agreement Services |
Nebraska Public Power District |
Nebraska |
S&L |
1/14/2025 |
1/24/2025 |
| Telecom Parts and Accessories |
Nebraska Public Power District |
Nebraska |
S&L |
1/11/2025 |
2/04/2025 |
| Transmission Line Right-of-Way Tree Clearing (Norfolk to Stanton North 115kV Transmission Line) |
Nebraska Public Power District |
Nebraska |
S&L |
12/03/2024 |
1/14/2025 |
| Generation III and Small Modular Reactor |
Nebraska Public Power District |
Nebraska |
S&L |
12/02/2024 |
12/13/2024 |
| Refurbishment of Multiple 34.5kV Subtransmission Lines from Bridgeport Substation to Lisco Substation |
Nebraska Public Power District |
Nebraska |
S&L |
11/27/2024 |
1/14/2025 |
| Main Condenser A-2 Cleaning (Gerald Gentleman Station) |
Nebraska Public Power District |
Nebraska |
S&L |
11/20/2024 |
12/11/2024 |
| Unit 2 Boiler Feed Pump Turbine Condenser Cleaning (Gerald Gentleman Station) |
Nebraska Public Power District |
Nebraska |
S&L |
11/20/2024 |
12/11/2024 |
| Expression of Interest for Engineering, Procurement and Construction Contractor (RICE and SCCT Facility) |
Nebraska Public Power District |
Nebraska |
S&L |
11/14/2024 |
12/18/2024 |
| Reheat Vertical Outlet Replacement Unit 1 Boiler (Gerald Gentleman Station) |
Nebraska Public Power District |
Nebraska |
S&L |
11/14/2024 |
12/10/2024 |
| Reheat Superheater Replacement Unit 2 Boiler - Walkdown Opportunity (Sheldon Station) |
Nebraska Public Power District |
Nebraska |
S&L |
11/04/2024 |
11/15/2024 |
| Transmission Line Right-of-Way Tree Clearing and Vegetation Control of Multiple Transmission Lines |
Nebraska Public Power District |
Nebraska |
S&L |
11/04/2024 |
12/05/2024 |
| Unit 2 Eddy Current Testing (Gerald Gentleman Station) |
Nebraska Public Power District |
Nebraska |
S&L |
10/24/2024 |
11/13/2024 |
| Snow and Ice Removal Services (Sheridan Learning Center and the Emergency Operations Facility) |
Nebraska Public Power District |
Nebraska |
S&L |
10/23/2024 |
10/31/2024 |
| Unit 2 Air Heater Hydro Cleaning Services (Gerald Gentleman Station) |
Nebraska Public Power District |
Nebraska |
S&L |
10/22/2024 |
11/13/2024 |
| Distribution Line Construction Services |
Nebraska Public Power District |
Nebraska |
S&L |
10/14/2024 |
10/29/2024 |
| Flame-Resistant Clothing Program |
Nebraska Public Power District |
Nebraska |
S&L |
10/14/2024 |
10/29/2024 |
| Reheat Vertical Outlet Replacement Unit 1 Boiler (Gerald Gentleman Station) |
Nebraska Public Power District |
Nebraska |
S&L |
10/08/2024 |
11/12/2024 |
| Transmission Line Right-of-Way Tree Clearing and Vegetation Control of Multiple Transmission Lines |
Nebraska Public Power District |
Nebraska |
S&L |
10/02/2024 |
10/24/2024 |
| Site Demolition and Grading (Bradshaw 34.5 kV Substation) |
Nebraska Public Power District |
Nebraska |
S&L |
10/01/2024 |
10/18/2024 |