California BidHub

UCLA Capital Programs Bids in California

15512,17107

Bid Title Issuing Agency Location Gov Level Published Date Closing Date
Deferred Maintenance FY2021-22 - NRB Addendum 1 UCLA Capital Programs California S&L 6/23/2026 7/21/2026
MP200 Suite B114 Nuc Med Equipment Installation (PREQUALIFICATIONS) UCLA Capital Programs California S&L 6/23/2026 7/08/2026
Wasserman OR Booster Chiller Installation UCLA Capital Programs California S&L 6/22/2026 7/28/2026
Young Hall - DM East Roof Repair (PREQUALIFICATIONS) UCLA Capital Programs California S&L 6/18/2026 7/07/2026
MP200 SPD Air Handling Unit Installation UCLA Capital Programs California S&L 6/16/2026 7/21/2026
5210 Pacific Concourse Dr. Tenant Improvements (BP 05 - Building Automation System (BAS)) UCLA Capital Programs California S&L 6/12/2026 7/02/2026
5210 Pacific Concourse Dr. Tenant Improvements (BP 02 - Fire Suppression) UCLA Capital Programs California S&L 6/12/2026 7/02/2026
5210 Pacific Concourse Dr. Tenant Improvements (BP 03 - Plumbing) UCLA Capital Programs California S&L 6/12/2026 7/02/2026
5210 Pacific Concourse Dr. Tenant Improvements (BP 06 - Electrical, Communications, Electronic Safety and Security) UCLA Capital Programs California S&L 6/12/2026 7/02/2026
5210 Pacific Concourse Dr. Tenant Improvements (BP 04 - Heating, Ventilation, and Air Conditioning) UCLA Capital Programs California S&L 6/12/2026 7/02/2026
901 Levering Student Housing (BP 08 - 30 - Multiple Trades) PREQUALIFICATION (opens in new tab, PDF) UCLA Capital Programs California S&L 6/08/2026 6/19/2026
Los Angeles Tennis Center Seismic Remediation UCLA Capital Programs California S&L 5/20/2026 6/16/2026
PS-8 Level 4 Waterproofing and Refurbishment (RE-BID) UCLA Capital Programs California S&L 5/19/2026 6/02/2026
901 Levering Student Housing (BP 05 - Phase2A Electrical) UCLA Capital Programs California S&L 5/15/2026 6/09/2026
901 Levering Student Housing (BP 02 - Demolition and Abatement) UCLA Capital Programs California S&L 5/15/2026 6/09/2026
901 Levering Student Housing (BP 04 - Site Utilities) UCLA Capital Programs California S&L 5/15/2026 6/09/2026
Weyburn Terrace Sycamore Finish Refurbishment Addendum 1 UCLA Capital Programs California S&L 5/14/2026 5/19/2026
Hazardous Material Abatement & Demolition Unit Price Job Order - Facilities Management 2026 UCLA Capital Programs California S&L 5/12/2026 6/09/2026
5210 Pacific Concourse Dr. Tenant Improvements (BP 01 - Demolition and Abatement) PREQUALIFICATION UCLA Capital Programs California S&L 5/08/2026 5/19/2026
5210 Pacific Concourse Dr. Tenant Improvements (BP 02 - 06 - Multiple Trades) PREQUALIFICATION UCLA Capital Programs California S&L 5/08/2026 5/20/2026
901 Levering Student Housing (BP 03 - Shoring/Mass Excavation) (opens in new tab, PDF) UCLA Capital Programs California S&L 5/04/2026 5/28/2026
901 Levering Student Housing (BP 01 - Pre-Fabricated Facade) Re-Solicit UCLA Capital Programs California S&L 4/29/2026 5/15/2026
Sproul Hall First Floor Mailroom Conversion UCLA Capital Programs California S&L 4/22/2026 5/26/2026
Weyburn Terrace Sycamore Finish Refurbishment UCLA Capital Programs California S&L 4/21/2026 5/19/2026
Weyburn Terrace Aloe Court Finish Refurbishment UCLA Capital Programs California S&L 4/21/2026 5/26/2026
Weyburn Terrrace Magnolia Finish Refurbishment UCLA Capital Programs California S&L 4/21/2026 5/26/2026
MP200 Suite 163 Office Reconfiguration UCLA Capital Programs California S&L 4/21/2026 5/26/2026
Sproul Hall Rooftop Boiler Tank Replacement UCLA Capital Programs California S&L 4/21/2026 5/19/2026
Big Ten Network Phase 2 UCLA Capital Programs California S&L 4/13/2026 5/11/2026
UCLA Wooden Locker Installation UCLA Capital Programs California S&L 4/06/2026 4/21/2026
RFQ-UCLA Parking Lot 36 Transit Hub UCLA Capital Programs California S&L 4/01/2026 4/29/2026
UCLA BSRB ROOM B-64 DRY HEAT STERILIZER INSTALLATION (RE-BID) UCLA Capital Programs California S&L 3/31/2026 4/28/2026
BSRB ROOM B-64 DRY HEAT STERILIZER INSTALLATION (RE-BID) UCLA Capital Programs California S&L 3/31/2026 4/28/2026
UCLA Wooden Locker Installation UCLA Capital Programs California S&L 3/31/2026 4/07/2026
UCLA Westwood Center Suite 300 Reconfiguration - Low Voltage Cabling UCLA Capital Programs California S&L 3/26/2026 4/14/2026
901 Levering Student Housing (BP 05 - Phase 2A Electrical) PREQUALIFICATION UCLA Capital Programs California S&L 3/26/2026 4/17/2026
901 Levering Student Housing (BP 06 - 32 - Multiple Trades) PREQUALIFICATION UCLA Capital Programs California S&L 3/26/2026 4/21/2026
UCLA PS-8 Level 4 Waterproofing and Refurbishment UCLA Capital Programs California S&L 3/26/2026 4/14/2026
901 Levering Student Housing (BP 01 - Pre-Fabricated Facade) UCLA Capital Programs California S&L 3/26/2026 4/23/2026
901 Levering Student Housing (BP 02 - Demolition and Abatement) PREQUALIFICATION UCLA Capital Programs California S&L 3/26/2026 4/17/2026
901 Levering Student Housing (BP 04 - Site Utilities) PREQUALIFICATION UCLA Capital Programs California S&L 3/26/2026 4/17/2026
RIEBER TERRACE FINISH REFURBISHMENT UCLA Capital Programs California S&L 3/24/2026 6/25/2026
901 Levering Student Housing (BP 03 - Shoring/Mass Excavation) PREQUALIFICATION UCLA Capital Programs California S&L 3/23/2026 4/07/2026
UCLA Los Angeles Tennis Center Seismic Remediation (PREQUALIFICATION) UCLA Capital Programs California S&L 3/20/2026 4/02/2026
RRUMC Nurse Call Replacement UCLA Capital Programs California S&L 3/20/2026 4/07/2026
Los Angeles Tennis Center Seismic Remediation (PREQUALIFICATIONS) RE-SOLICITATION UCLA Capital Programs California S&L 3/20/2026 4/02/2026
UCLA Hedrick Summit, Rieber Terrace, and Rieber Vista Accessibility Upgrades UCLA Capital Programs California S&L 3/16/2026 4/14/2026
PS-2 Level 7 Waterproofing and Refurbishment Addendum 1 UCLA Capital Programs California S&L 3/16/2026 4/21/2026
RFQ-UCLA Campus Metering & Cogen IT Controls UCLA Capital Programs California S&L 3/16/2026 4/06/2026
Hedrick Summit, Rieber Terrace, and Rieber Vista Accessibility Upgrades UCLA Capital Programs California S&L 3/16/2026 4/14/2026
RRUMC 4th Floor Patient Care Reconfiguration - BP11 - Demolition, Concrete, Framing and Drywall UCLA Capital Programs California S&L 3/14/2026 3/26/2026
PS-2 Level 7 Waterproofing and Refurbishment Addendum 1 UCLA Capital Programs California S&L 3/13/2026 4/21/2026
BSRB ROOM B-64 DRY HEAT STERILIZER INSTALLATION UCLA Capital Programs California S&L 3/13/2026 3/24/2026
RRUMC Rooms 2576, 2566, 2560, 2538, & 2526 (ORs 2,4,6,12,16) Lights Replacement UCLA Capital Programs California S&L 3/13/2026 3/31/2026
Wooden Locker Installation Addendum 3 UCLA Capital Programs California S&L 3/13/2026 4/07/2026
RRUMC Nurse Call Replacement UCLA Capital Programs California S&L 3/13/2026 4/07/2026
UCLA RRUMC 4th Floor Patient Care Reconfiguration - BP11 - Demolition, Concrete, Framing and Drywall UCLA Capital Programs California S&L 3/13/2026 3/26/2026
PS-8 Level 4 Waterproofing and Refurbishment UCLA Capital Programs California S&L 3/13/2026 4/07/2026
Hedrick Summit, Rieber Terrace and Rieber Vista Vanity Replacements Addendum 1 UCLA Capital Programs California S&L 3/13/2026 3/31/2026
DE NEVE ACACIA AND BIRCH FINISH REFURBISHMENT UCLA Capital Programs California S&L 3/13/2026 3/26/2026
UCLA Westwood Center Suite 300 Reconfiguration - Low Voltage Cabling UCLA Capital Programs California S&L 3/13/2026 3/31/2026
UCLA PS-2 Level 7 Waterproofing and Refurbishment UCLA Capital Programs California S&L 3/12/2026 4/21/2026
Wooden Locker Installation Addendum 3 UCLA Capital Programs California S&L 3/10/2026 4/07/2026
Hedrick Summit, Rieber Terrace and Rieber Vista Vanity Replacements Addendum 1 UCLA Capital Programs California S&L 3/06/2026 3/31/2026
UCLA PS-2 Level 7 Waterproofing and Refurbishment UCLA Capital Programs California S&L 3/06/2026 4/14/2026
PS-2 Level 7 Waterproofing and Refurbishment UCLA Capital Programs California S&L 3/06/2026 4/14/2026
UCLA Westwood Center Suite 300 Reconfiguration - Low Voltage Cabling UCLA Capital Programs California S&L 3/05/2026 3/31/2026
UCLA Westwood Center Suite 300 Reconfiguration - Low Voltage Cabling UCLA Capital Programs California S&L 3/05/2026 3/31/2026
RRUMC Rooms 2576, 2566, 2560, 2538, & 2526 (ORs 2,4,6,12,16) Lights Replacement UCLA Capital Programs California S&L 3/05/2026 3/31/2026
UCLA PS-8 Level 4 Waterproofing and Refurbishment UCLA Capital Programs California S&L 3/03/2026 4/07/2026
PS-8 Level 4 Waterproofing and Refurbishment UCLA Capital Programs California S&L 3/03/2026 4/07/2026
RFQ-UCLA Various Capital Improvements, MEP Engineer Services, No. 8403562 UCLA Capital Programs California S&L 2/26/2026 3/16/2026
901 Levering Student Housing (BP 01 - Pre-Fabricated Facade) PREQUALIFICATION UCLA Capital Programs California S&L 2/26/2026 3/13/2026
UCLA RRUMC Rooms 2576, 2566, 2560, 2538, & 2526 (ORs 2,4,6,12,16) Lights Replacement UCLA Capital Programs California S&L 2/25/2026 3/31/2026
RRUMC Rooms 2576, 2566, 2560, 2538, & 2526 (ORs 2,4,6,12,16) Lights Replacement UCLA Capital Programs California S&L 2/25/2026 3/31/2026
Telecomm Structured Cabling JOC- Campus and Off-Campus Leased Facilities 2026 Addendum 2 UCLA Capital Programs California S&L 2/25/2026 3/03/2026
Telecomm Structured Cabling JOC- Campus and Off-Campus Leased Facilities 2026 UCLA Capital Programs California S&L 2/24/2026 3/03/2026
UCLA BSRB ROOM B-64 DRY HEAT STERILIZER INSTALLATION UCLA Capital Programs California S&L 2/24/2026 3/24/2026
RRUMC Nurse Call Replacement UCLA Capital Programs California S&L 2/24/2026 4/07/2026
BSRB ROOM B-64 DRY HEAT STERILIZER INSTALLATION UCLA Capital Programs California S&L 2/24/2026 3/24/2026
UCLA De Neve Acacia and Birch Finish Refurbishment UCLA Capital Programs California S&L 2/24/2026 3/26/2026
UCLA Hedrick Summit, Rieber Terrace and Rieber Vista Vanity Replacements UCLA Capital Programs California S&L 2/24/2026 3/31/2026
UCLA Rieber Terrace Finish Refurbishment UCLA Capital Programs California S&L 2/24/2026 3/24/2026
DE NEVE ACACIA AND BIRCH FINISH REFURBISHMENT UCLA Capital Programs California S&L 2/24/2026 3/26/2026
Hedrick Summit, Rieber Terrace and Rieber Vista Vanity Replacements UCLA Capital Programs California S&L 2/24/2026 3/31/2026
UCLA RRUMC Nurse Call Replacement UCLA Capital Programs California S&L 2/23/2026 4/07/2026
UCLA Various Capital Improvements, MEP Engineer Services, No. 8403562 UCLA Capital Programs California S&L 2/20/2026 3/16/2026
UCLA Young Hall 5th Floor Lab Renovations (Rooms 5073, 5076, 5077, 5085, 5086, 5090, 5096) UCLA Capital Programs California S&L 2/20/2026 3/05/2026
RRUMC 4th Floor Patient Care Reconfiguration (Multiple BPs) PREQUALIFICATION UCLA Capital Programs California S&L 2/19/2026 3/06/2026
UCLA UWVMC 2nd Floor Lab Analyzer Replacement UCLA Capital Programs California S&L 2/13/2026 2/23/2026
MP200 2nd Floor Oncology Improvements (BP13 - Signage) RE-BID UCLA Capital Programs California S&L 2/05/2026 2/09/2026
BIG Ten Network Phase 2 - Broadcast Integrator (PREQUALIFICATIONS) RE-SOLICITATION UCLA Capital Programs California S&L 2/05/2026 2/19/2026
UCLA BIG Ten Network Phase 2 - Broadcast Integrator (PREQUALIFICATION) RE-SOLICITATION UCLA Capital Programs California S&L 2/05/2026 2/19/2026
MP200 2nd Floor Oncology Improvements (BP13 - Signage) RE-BID UCLA Capital Programs California S&L 2/03/2026 2/09/2026
UCLA Wooden Locker Installation UCLA Capital Programs California S&L 2/03/2026 3/10/2026
UWVMC 2nd Floor Lab Analyzer Replacement Addendum 1 UCLA Capital Programs California S&L 2/03/2026 2/17/2026
Powell Library Room 30 Compact Shelving Renovation (Re-Bid) UCLA Capital Programs California S&L 2/03/2026 2/17/2026
Wooden Locker Installation UCLA Capital Programs California S&L 2/03/2026 3/10/2026
Telecomm Structured Cabling JOC- Campus and Off-Campus Leased Facilities 2026 UCLA Capital Programs California S&L 2/03/2026 3/03/2026
MP200 2nd Floor Oncology Improvements (BP12 - Fire Extinguishers, Bathroom Access, Metal Lockers, and etc) RE-BID UCLA Capital Programs California S&L 2/03/2026 2/09/2026
UCLA Telecomm Structured Cabling JOC- Campus and Off-Campus Leased Facilities 2026 UCLA Capital Programs California S&L 2/03/2026 3/03/2026
RFQ-UCLA Various Capital Improvements | Parking Structures UCLA Capital Programs California S&L 2/02/2026 2/24/2026
MP200 2nd Floor Oncology Improvements (BP19 - Dumbwaiter) - RE-BID UCLA Capital Programs California S&L 1/30/2026 2/04/2026
Powell Library Room 30 Compact Shelving Renovation (Re-Bid) UCLA Capital Programs California S&L 1/27/2026 2/17/2026
RFQ-UCLA Mildred E. Mathias Botanical Garden Amphitheater Renovation UCLA Capital Programs California S&L 1/21/2026 2/10/2026
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP07A - Waterproofing, Roofing, Sheet Metal) UCLA Capital Programs California S&L 1/20/2026 1/30/2026
UCLA Mildred E. Mathias Botanical Garden Amphitheater Renovation UCLA Capital Programs California S&L 1/20/2026 2/10/2026
Young Hall 5th Floor Lab Renovation (Rooms 5073, 5076, 5077, 5085, 5086, 5090, 5096) UCLA Capital Programs California S&L 1/16/2026 2/24/2026
Los Angeles Tennis Center Seismic Remediation (PREQUALIFICATIONS) UCLA Capital Programs California S&L 1/16/2026 2/03/2026
UCLA Campus Wide Hydrodynamic Separator Installation UCLA Capital Programs California S&L 1/16/2026 1/27/2026
UCLA Los Angeles Tennis Center Seismic Remediation (PREQUALIFICATIONS) UCLA Capital Programs California S&L 1/16/2026 2/03/2026
UCLA Young Hall 5th Floor Lab Renovations (Rooms 5073, 5076, 5077, 5085, 5086, 5090, 5096) UCLA Capital Programs California S&L 1/14/2026 2/24/2026
UWVMC 2nd Floor Lab Analyzer Replacement Addendum 1 UCLA Capital Programs California S&L 1/14/2026 2/17/2026
Young Hall 5th Floor Lab Renovation (Rooms 5073, 5076, 5077, 5085, 5086, 5090, 5096) UCLA Capital Programs California S&L 1/14/2026 2/24/2026
Tiverton House Roof Replacement UCLA Capital Programs California S&L 1/13/2026 1/27/2026
UWVMC 2nd Floor Lab Analyzer Replacement Addendum 1 UCLA Capital Programs California S&L 1/13/2026 2/17/2026
UCLA UWVMC 2nd Floor Lab Analyzer Replacement UCLA Capital Programs California S&L 1/13/2026 2/17/2026
RFQ-UCLA Health-Various Capital Improvements | Infrastructure Equipment Replacement Projects UCLA Capital Programs California S&L 1/12/2026 2/03/2026
UCLA Campus Wide Hydrodynamic Separator Installation UCLA Capital Programs California S&L 1/12/2026 1/20/2026
UCLA Powell Library Room 30 Compact Shelving Renovation (RE-BID) UCLA Capital Programs California S&L 1/09/2026 2/17/2026
Powell Library Room 30 Compact Shelving Renovation (Re-Bid) UCLA Capital Programs California S&L 1/09/2026 2/17/2026
Mid-Wilshire Medical Office Building Seismic and Program Improvements - Phase 2B (BP10B - Signage) RE-BID UCLA Capital Programs California S&L 1/08/2026 1/23/2026
UCLA Acosta Operations Center UCLA Capital Programs California S&L 1/08/2026 1/20/2026
Mid-Wilshire Medical Office Building Seismic and Program Improvements - Phase 2B (BP32C - Landscaping) RE-BID UCLA Capital Programs California S&L 1/08/2026 2/09/2026
Tiverton House Roof Replacement UCLA Capital Programs California S&L 12/19/2025 1/27/2026
UCLA Tiverton House Roof Replacement UCLA Capital Programs California S&L 12/19/2025 1/27/2026
Campus Wide Hydrodynamic Separator Installation UCLA Capital Programs California S&L 12/19/2025 1/13/2026
Big Ten Network Phase 2 - Broadcast Integrator (PREQUALIFICATIONS) UCLA Capital Programs California S&L 12/19/2025 1/14/2026
Campus Wide Hydrodynamic Separator Installation Addendum 3 UCLA Capital Programs California S&L 12/16/2025 1/13/2026
UCLA Campus Wide Hydrodynamic Separator Installation UCLA Capital Programs California S&L 12/15/2025 1/13/2026
MP200 Emergency Power Equipment Replacemen (Re-Bid) UCLA Capital Programs California S&L 12/12/2025 1/06/2026
UCLA MP200 Emergency Power Equipment Replacement (Re-Bid) UCLA Capital Programs California S&L 12/12/2025 1/13/2026
UCLA RRUMC Room 1604J CT Replacement UCLA Capital Programs California S&L 12/05/2025 12/11/2025
UCLA 901 Levering Student Housing UCLA Capital Programs California S&L 12/04/2025 12/11/2025
MP200 2nd Floor Oncology Improvements (BP02 - Existing Conditions, Reinforced Concrete, Pavers and Small Appliances) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP10 - Resilient Flooring) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP15 - Electrical and Fire Alarm) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
UCLA Campus Wide Hydrodynamic Separator Installation UCLA Capital Programs California S&L 12/04/2025 12/16/2025
MP200 2nd Floor Oncology Improvements (BP03 - Final Clean) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP11 - Painting, Coating, and Wall Covering) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP16 - Plumbing) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP19 - Dumbwaiter) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP04 - Structural Steel and Misc. Metals) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP12 - Fire Extinguishers, Bathroom Access, Metal Lockers, and Misc. Specialties) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP18 - Fire Protection) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP06 - Waterproofing, Roofing & Flashing) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP05 - Finish Carpentry, Solid Surface Countertops & Banquet Seating) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP08 - Drywall, Framing, Insulation, Acoustical Ceilings & Exterior Plaster) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP13 - Signage) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP17 - Warm-Air Heating, Ventilating and Air-Conditioning) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP01 - Selective Demolition) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP07 - Doors, Door Frames & Hardware) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP09 - Ceramic Tile) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
MP200 2nd Floor Oncology Improvements (BP14 - Window Treatment) UCLA Capital Programs California S&L 12/04/2025 1/07/2026
Acosta Operations Center UCLA Capital Programs California S&L 12/03/2025 1/13/2026
UCLA Acosta Operations Center UCLA Capital Programs California S&L 12/03/2025 1/13/2026
UCLA 5210 Pacific Concourse Drive Tenant Improvements UCLA Capital Programs California S&L 12/02/2025 1/15/2026
5210 Pacific Concourse Dr. Tenant Improvements UCLA Capital Programs California S&L 12/01/2025 1/15/2026
UCLA RRUMC Room 1604J CT Replacement UCLA Capital Programs California S&L 11/24/2025 12/10/2025
UCLA MP200 Room B265-39 Linac B Equipment Replacement UCLA Capital Programs California S&L 11/21/2025 12/09/2025
UCLA MP200 Emergency Power Equipment Replacement UCLA Capital Programs California S&L 11/20/2025 11/25/2025
RRUMC Room 1604J CT Replacement UCLA Capital Programs California S&L 11/20/2025 12/02/2025
UCLA Big Ten Network Phase 2 - Broadcast Integrator (PREQUALIFICATION) UCLA Capital Programs California S&L 11/18/2025 1/14/2026
MP200 Room B265-39 Linac B Equipment Replacement UCLA Capital Programs California S&L 11/18/2025 12/02/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP10B - Signage) UCLA Capital Programs California S&L 11/17/2025 11/21/2025
RRUMC Room 1604J CT Replacement UCLA Capital Programs California S&L 11/13/2025 12/02/2025
Canyon Point HVAC Replacement UCLA Capital Programs California S&L 11/10/2025 12/09/2025
UCLA Parking Structure 18 Switzer Plaza Stabilization UCLA Capital Programs California S&L 11/10/2025 12/16/2025
PS-18 Switzer Plaza Stabilization UCLA Capital Programs California S&L 11/10/2025 12/16/2025
UCLA Big Ten Network Phase 2 - Broadcast Integrator (PREQUALIFICATION) UCLA Capital Programs California S&L 11/10/2025 12/12/2025
Big Ten Network Phase 2 - Broadcast Integrator (PREQUALIFICATIONS) UCLA Capital Programs California S&L 11/10/2025 12/12/2025
UCLA Canyon Point HVAC Replacement UCLA Capital Programs California S&L 11/10/2025 12/09/2025
RRUMC Room 1604J CT Replacement UCLA Capital Programs California S&L 11/03/2025 12/02/2025
UCLA MP200 Room B265-39 Linac B Equipment Replacement UCLA Capital Programs California S&L 11/03/2025 12/02/2025
RFQ- 200 Medical Plaza, Third Floor Master Plan Study UCLA Capital Programs California S&L 10/30/2025 11/21/2025
901 Levering Student Housing UCLA Capital Programs California S&L 10/28/2025 12/09/2025
Campus Wide Hydrodynamic Separator Installation UCLA Capital Programs California S&L 10/28/2025 12/09/2025
MP200 Room B265-39 Linac B Equipment Replacement UCLA Capital Programs California S&L 10/28/2025 12/02/2025
UCLA 901 Levering Student Housing UCLA Capital Programs California S&L 10/28/2025 12/09/2025
UCLA MP200 Room B265-39 Linac B Equipment Replacement (907547.01) UCLA Capital Programs California S&L 10/28/2025 12/02/2025
Campus Wide Hydrodynamic Separator Installation UCLA Capital Programs California S&L 10/27/2025 12/09/2025
UCLA Campus Wide Hydrodynamic Separator Installation UCLA Capital Programs California S&L 10/27/2025 12/09/2025
UCLA RRUMC Nurse Call Replacement (PRIME PREQUALIFICATION) UCLA Capital Programs California S&L 10/24/2025 11/04/2025
UCLA Transit Yard EV Bus Charging Stations Installation UCLA Capital Programs California S&L 10/22/2025 10/30/2025
Powell Library Room 30 Compact Shelving Renovation UCLA Capital Programs California S&L 10/21/2025 11/18/2025
RRUMC Room 1604J CT Replacement UCLA Capital Programs California S&L 10/21/2025 12/02/2025
UCLA RRUMC Room 1604J CT Replacement UCLA Capital Programs California S&L 10/21/2025 12/02/2025
UCLA Transit Yard EV Bus Charging Stations Installation UCLA Capital Programs California S&L 10/20/2025 10/28/2025
UCLA RRUMC Nurse Call Replacement (PRIME PREQUALIFICATION) UCLA Capital Programs California S&L 10/17/2025 10/28/2025
UCLA RRUMC Nurse Call Replacement (ELECTRICAL SUB PREQUALIFICATION) UCLA Capital Programs California S&L 10/17/2025 10/28/2025
Young Hall 5th Floor Lab Renovation (Rooms 5073, 5076, 5077, 5085, 5086, 5090, 5096) UCLA Capital Programs California S&L 10/16/2025 10/30/2025
UCLA Young Hall 5th Floor Lab Renovations (Rooms 5073, 5076, 5077, 5085, 5086, 5090, 5096) UCLA Capital Programs California S&L 10/16/2025 10/30/2025
RRUMC Nurse Call Replacement (PRIME PREQUALIFICATION) UCLA Capital Programs California S&L 10/16/2025 10/23/2025
MP200 Emergency Power Equipment Replacement UCLA Capital Programs California S&L 10/15/2025 11/18/2025
UCLA MP200 Emergency Power Equipment Replacement UCLA Capital Programs California S&L 10/15/2025 11/18/2025
Powell Library Room 30 Compact Shelving Renovation UCLA Capital Programs California S&L 10/14/2025 11/18/2025
UCLA Powell Library Room 30 Compact Shelving Renovation UCLA Capital Programs California S&L 10/14/2025 11/18/2025
Plumbing Unit Price Job Order - Facilities Management 2025 UCLA Capital Programs California S&L 10/14/2025 10/21/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP32C - Landscaping) UCLA Capital Programs California S&L 10/13/2025 11/07/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP09B - Tiling) UCLA Capital Programs California S&L 10/13/2025 11/07/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP10B - Signage) UCLA Capital Programs California S&L 10/13/2025 11/07/2025
MP200 2nd Floor Oncology Improvements (BP 10 - Resilient Flooring and Base) RE-SOLICIT PREQUALIFICATION UCLA Capital Programs California S&L 10/09/2025 10/14/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP06A - Architectural Millwork) UCLA Capital Programs California S&L 10/03/2025 10/30/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP32A - Landscaping) UCLA Capital Programs California S&L 10/03/2025 11/07/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP07A - Waterproofing, Roofing, Sheet Metal) UCLA Capital Programs California S&L 10/03/2025 10/30/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP09D - Flooring) UCLA Capital Programs California S&L 10/03/2025 10/30/2025
UCLA Transit Yard EV Bus Charging Stations Installation UCLA Capital Programs California S&L 10/03/2025 10/21/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP09E - Painting) UCLA Capital Programs California S&L 10/03/2025 10/30/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP09B - Tiling) UCLA Capital Programs California S&L 10/03/2025 11/07/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP10C - Smoke Curtain) UCLA Capital Programs California S&L 10/03/2025 11/07/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP09C - Acoustical Ceilings) RE-BID UCLA Capital Programs California S&L 10/03/2025 10/10/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP10A - Specialties) UCLA Capital Programs California S&L 10/03/2025 10/30/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP05A - Structural Steel) UCLA Capital Programs California S&L 10/03/2025 10/30/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements (BP10B - Signage) UCLA Capital Programs California S&L 10/03/2025 11/07/2025
RRUMC Nurse Call Replacement (ELECTRICAL SUB PREQUALIFICATION) UCLA Capital Programs California S&L 10/01/2025 10/23/2025
UCLA RRUMC Nurse Call Replacement (PRIME PREQUALIFICATION) UCLA Capital Programs California S&L 10/01/2025 10/23/2025
University Residence Roof Replacement Addendum 1 UCLA Capital Programs California S&L 10/01/2025 10/07/2025
RRUMC Nurse Call Replacement (PRIME PREQUALIFICATION) UCLA Capital Programs California S&L 10/01/2025 10/23/2025
MP200 2nd Floor Oncology Improvements (BP11- Paint, Coating and Wall Covering) PREQUALIFICATION UCLA Capital Programs California S&L 10/01/2025 10/03/2025
UCLA RRUMC Nurse Call Replacement (ELECTRICAL SUB PREQUALIFICATION) UCLA Capital Programs California S&L 10/01/2025 10/23/2025
UCLA University Residence Roof Replacement UCLA Capital Programs California S&L 9/30/2025 10/07/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements Phase 2A (BP09D - Painting) RE-BID UCLA Capital Programs California S&L 9/30/2025 10/03/2025
Plumbing Unit Price Job Order - Facilities Management 2025 UCLA Capital Programs California S&L 9/25/2025 10/21/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements Phase 2B (BP26A - Electrical) RE-BID UCLA Capital Programs California S&L 9/25/2025 9/29/2025
Plumbing & HVAC System Insulation - Unit Price Job Order - Facilities Management 2025 UCLA Capital Programs California S&L 9/25/2025 10/07/2025
UCLA Plumbing Unit Price Job Order - Facilities Management 2025 UCLA Capital Programs California S&L 9/25/2025 10/21/2025
MP200 2nd Floor Oncology Improvements (BP 10 - Resilient Flooring and Base) RE-SOLICIT PREQUALIFICATION UCLA Capital Programs California S&L 9/24/2025 10/03/2025
MP200 2nd Floor Oncology Improvements (BP 5 - Finish Carpentry) RE-SOLICIT PREQUALIFICATION UCLA Capital Programs California S&L 9/24/2025 10/01/2025
MP200 2nd Floor Oncology Improvements (BP11- Paint, Coating and Wall Covering) PREQUALIFICATION UCLA Capital Programs California S&L 9/24/2025 10/03/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements Phase 2A (BP07B - Fireproofing) RE-BID UCLA Capital Programs California S&L 9/23/2025 10/03/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements Phase 2A (BP09C - Flooring) RE-BID UCLA Capital Programs California S&L 9/23/2025 10/03/2025
UCLA MP200 Room B114-29 Nuc Med PET CT Equipment Replacement UCLA Capital Programs California S&L 9/23/2025 9/30/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements Phase 2B (BP03B- Reinforcing Steel) RE-BID UCLA Capital Programs California S&L 9/23/2025 9/29/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements Phase 2B (BP26A - Electrical) RE-BID UCLA Capital Programs California S&L 9/23/2025 9/29/2025
MP200 2nd Floor Oncology Improvements (BP 16? Plumbing) PREQUALIFICATION Addendum 1 UCLA Capital Programs California S&L 9/23/2025 9/26/2025
UCLA Gonda Center Deep Energy Project UCLA Capital Programs California S&L 9/22/2025 9/30/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements Phase 2A (BP09D - Painting) RE-BID UCLA Capital Programs California S&L 9/19/2025 9/26/2025
UCLA Gonda Center Deep Energy Project UCLA Capital Programs California S&L 9/18/2025 9/23/2025
University Residence Roof Replacement UCLA Capital Programs California S&L 9/18/2025 9/30/2025
MP200 Room B114-29 Nuc Med PET CT Equipment Replacement Addendum 1 UCLA Capital Programs California S&L 9/16/2025 9/23/2025
MID-WILSHIRE MEDICAL OFFICE BUILDING SEISMIC IMPROVEMENTS - BP02A-DEMOLITION RE-BID UCLA Capital Programs California S&L 9/11/2025 9/18/2025
UCLA Mid-Wilshire Medical Office Building Seismic Improvements - BP02A - Demolition (RE-BID) UCLA Capital Programs California S&L 9/11/2025 9/16/2025
UCLA Westwood Center Suite 300 Reconfiguration UCLA Capital Programs California S&L 9/11/2025 10/07/2025
MP200 2nd Floor Oncology Improvements (BP 4 - Struct and Mis Steel) PREQUALIFICATION UCLA Capital Programs California S&L 9/10/2025 9/19/2025
MP200 2nd Floor Oncology Improvements (BP 16- Plumbing) PREQUALIFICATION UCLA Capital Programs California S&L 9/10/2025 9/19/2025
MP200 2nd Floor Oncology Improvements (BP 5 - Finish Carpentry) PREQUALIFICATION UCLA Capital Programs California S&L 9/10/2025 9/19/2025
UCLA Westwood Center Suite 300 Reconfiguration UCLA Capital Programs California S&L 9/10/2025 9/30/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements Phase 2B (BP33A - Site Utilities) UCLA Capital Programs California S&L 9/10/2025 9/19/2025
UCLA Westwood Center Suite 300 Reconfiguration UCLA Capital Programs California S&L 9/10/2025 9/30/2025
MP200 2nd Floor Oncology Improvements (BP 8 - Drywall, Acoustical Ceilings, and Exterior Plaster) PREQUALIFICATION UCLA Capital Programs California S&L 9/10/2025 9/19/2025
MP200 2nd Floor Oncology Improvements (BP 15 - Electrical/ Fire Alarm) PREQUALIFICATION UCLA Capital Programs California S&L 9/10/2025 9/19/2025
Transit Yard EV Bus Charging Stations Installation UCLA Capital Programs California S&L 9/10/2025 10/07/2025
MP200 2nd Floor Oncology Improvements (BP 17 - Warm-Air Heating, Ventilating and Air-Conditioning) PREQUALIFICATION UCLA Capital Programs California S&L 9/10/2025 9/19/2025
Plumbing & HVAC System Insulation - Unit Price Job Order - Facilities Management 2025 UCLA Capital Programs California S&L 9/09/2025 10/07/2025
MP200 Suite 145 Blood Draw Expansion Addendum 4 UCLA Capital Programs California S&L 9/09/2025 9/16/2025
UCLA Plumbing & HVAC System Insulation - Unit Price Job Order - Facilities Management 2025 UCLA Capital Programs California S&L 9/09/2025 10/07/2025
UCLA University Residence Roof Replacement UCLA Capital Programs California S&L 9/03/2025 9/30/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements Phase 2A (BP09C - Flooring) ADDENDUM 1 UCLA Capital Programs California S&L 9/03/2025 9/17/2025
RFQ-Santa Monica UCLA Medical Center 3rd Fl. GI-Medical Procedures Unit Reconfiguration UCLA Capital Programs California S&L 9/03/2025 9/26/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements Phase 2A (BP09D - Painting) ADDENDUM 1 UCLA Capital Programs California S&L 9/03/2025 9/17/2025
UCLA Transit Yard EV Bus Charging Stations Installation UCLA Capital Programs California S&L 9/03/2025 10/07/2025
Transit Yard EV Bus Charging Stations Installation UCLA Capital Programs California S&L 9/03/2025 10/07/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements Phase 2B (BP09C - Acoustical Ceilings) ADDENDUM 1 UCLA Capital Programs California S&L 9/03/2025 9/17/2025
University Residence Roof Replacement UCLA Capital Programs California S&L 9/03/2025 9/30/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements Phase 2A (BP07B - Fireproofing) ADDENDUM 1 UCLA Capital Programs California S&L 9/03/2025 9/17/2025
Luskin Conference Center Guest Room Carpet Replacement UCLA Capital Programs California S&L 8/26/2025 9/23/2025
Gonda Center Deep Energy Project UCLA Capital Programs California S&L 8/26/2025 9/09/2025
UCLA Luskin Conference Center Guest Room Carpet Replacement UCLA Capital Programs California S&L 8/26/2025 9/23/2025
Big Ten Network Phase 2 (PRIME PREQUALIFICATIONS) UCLA Capital Programs California S&L 8/20/2025 9/18/2025
UCLA Big Ten Network Phase 2 (PRIME PREQUALIFICATIONS) UCLA Capital Programs California S&L 8/20/2025 9/18/2025
UCLA Acosta Operations Center (PREQUALIFICATIONS) UCLA Capital Programs California S&L 8/20/2025 9/17/2025
901 Levering Student Housing (PREQUALIFICATION) UCLA Capital Programs California S&L 8/20/2025 9/16/2025
Acosta Operations Center (PREQUALIFICATIONS) UCLA Capital Programs California S&L 8/20/2025 9/17/2025
MID-WILSHIRE MEDICAL OFFICE BUILDING SEISMIC IMPROVEMENTS - BP02A-DEMOLITION UCLA Capital Programs California S&L 8/19/2025 9/09/2025
UCLA Mid-Wilshire Medical Office Building Seismic Improvements - BP09A - Framing & Drywall UCLA Capital Programs California S&L 8/19/2025 9/09/2025
MID-WILSHIRE MEDICAL OFFICE BUILDING SEISMIC IMPROVEMENTS - BP03A-CONCRETE UCLA Capital Programs California S&L 8/19/2025 9/09/2025
UCLA Mid-Wilshire Medical Office Building Seismic Improvements - BP03A - Concrete UCLA Capital Programs California S&L 8/19/2025 9/09/2025
MID-WILSHIRE MEDICAL OFFICE BUILDING SEISMIC IMPROVEMENTS - BP09A-FRAMING & DRYWALL UCLA Capital Programs California S&L 8/19/2025 9/09/2025
UCLA Mid-Wilshire Medical Office Building Seismic Improvements - BP02A - Demolition UCLA Capital Programs California S&L 8/19/2025 9/09/2025
Gonda Center Deep Energy Project UCLA Capital Programs California S&L 8/19/2025 9/09/2025
UCLA Gonda Center Deep Energy Project UCLA Capital Programs California S&L 8/19/2025 9/09/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements ( BP33A - Site Utilities) UCLA Capital Programs California S&L 8/19/2025 9/05/2025
901 Levering Student Housing (PREQUALIFICATION) UCLA Capital Programs California S&L 8/18/2025 9/16/2025
UCLA 901 Levering Student Housing (PREQUALIFICATION) UCLA Capital Programs California S&L 8/18/2025 9/16/2025
UCLA Cogeneration Plant Cooling Tower Basin Waterproofing Repair (RE-SOLICIT) PREQUALIFICATIONS UCLA Capital Programs California S&L 8/14/2025 9/04/2025
UCLA Research Park East Core and Shell Improvements (PREQUALIFICATION) UCLA Capital Programs California S&L 8/13/2025 9/02/2025
UCLA MP200 Suite 145 Blood Draw Expansion UCLA Capital Programs California S&L 8/13/2025 9/09/2025
RFQ-UCLA Research Park Core and Shell UCLA Capital Programs California S&L 8/12/2025 9/04/2025
Cogeneration Plant Cooling Tower Basin Waterproofing Repair (PREQUALIFICATION RESOLICITATION) UCLA Capital Programs California S&L 8/11/2025 9/04/2025
UCLA MP200 Suite 145 Blood Draw Expansion UCLA Capital Programs California S&L 8/11/2025 8/19/2025
MP200 Suite 145 Blood Draw Expansion UCLA Capital Programs California S&L 8/08/2025 8/12/2025
Cogeneration Plant Cooling Tower Basin Waterproofing Repair (RE-SOLICIT) PREQUALIFICATIONS UCLA Capital Programs California S&L 8/08/2025 9/04/2025
Cogeneration Plant Cooling Tower Basin Waterproofing Repair (PREQUALIFICATION RESOLICITATION) UCLA Capital Programs California S&L 8/08/2025 9/04/2025
UCLA Research Park East Core and Shell Improvements UCLA Capital Programs California S&L 8/08/2025 9/02/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements ( BP08B - Glass and Glazing) UCLA Capital Programs California S&L 8/07/2025 9/05/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements ( BP21A - Fire Protection) UCLA Capital Programs California S&L 8/07/2025 9/05/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements ( BP23A - HVAC) UCLA Capital Programs California S&L 8/07/2025 9/05/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements ( BP09C - Acoustical Ceilings) UCLA Capital Programs California S&L 8/07/2025 9/05/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements ( BP22A - Plumbing) UCLA Capital Programs California S&L 8/07/2025 9/05/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements ( BP26A - Electrical) UCLA Capital Programs California S&L 8/07/2025 9/05/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements ( BP03B- Concrete Reinforcing Steel) UCLA Capital Programs California S&L 8/07/2025 9/05/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements ( BP32D - Site Concrete) UCLA Capital Programs California S&L 8/07/2025 9/05/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements ( BP33A - Site Utilities) UCLA Capital Programs California S&L 8/07/2025 9/05/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements ( BP08A - Doors, Frames, and Hardware) UCLA Capital Programs California S&L 8/07/2025 9/05/2025
UCLA Research Park East Core and Shell Improvements UCLA Capital Programs California S&L 8/06/2025 9/02/2025
MP200 Room B114-29 Nuc Med PET CT Equipment Replacement Addendum 1 UCLA Capital Programs California S&L 8/06/2025 9/23/2025
UCLA MP200 Room B114-29 Nuc Med PET CT Equipment Replacement UCLA Capital Programs California S&L 8/06/2025 9/23/2025
UCLA Research Park East Core and Shell Improvements UCLA Capital Programs California S&L 8/04/2025 9/02/2025
UCLA Research Park East Core and Shell Improvements UCLA Capital Programs California S&L 8/04/2025 9/02/2025
MP200 Suite 145 Blood Draw Expansion UCLA Capital Programs California S&L 8/04/2025 8/12/2025
RFQ-ADA Transition Plan Accessible Paths of Travel UCLA Capital Programs California S&L 7/24/2025 8/15/2025
RFQ- UCLA West Valley Medical Office Building Master Plan Study, No. 908074.01 UCLA Capital Programs California S&L 7/15/2025 8/12/2025
MP200 Room B114-29 Nuc Med PET CT Equipment Replacement UCLA Capital Programs California S&L 7/15/2025 8/26/2025
UCLA MP200 Room B114-29 Nuc Med PET CT Equipment Replacement UCLA Capital Programs California S&L 7/15/2025 8/26/2025
MP200 Suite 145 Blood Draw Expansion UCLA Capital Programs California S&L 7/11/2025 8/12/2025
UCLA Housing Maintenance Roofing JOC 2025 UCLA Capital Programs California S&L 7/11/2025 7/22/2025
RFQ - UCLA Decarbonization Implementation Projects Study UCLA Capital Programs California S&L 7/10/2025 7/24/2025
RRUMC Sterile Processing Department Washer and Sink Replacement UCLA Capital Programs California S&L 7/10/2025 7/26/2025
MP200 Suite 145 Blood Draw Expansion UCLA Capital Programs California S&L 7/09/2025 8/12/2025
BRI 78-109 Lab Renovation UCLA Capital Programs California S&L 7/08/2025 7/22/2025
Housing Maintenance Roofing JOC 2025 UCLA Capital Programs California S&L 7/08/2025 7/15/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP32D - Site Concrete, Asphalt, Striping) PQ RESOLICIT UCLA Capital Programs California S&L 7/08/2025 7/18/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP06A - Architectural Woodwork) PREQUAL RE-SOLICIT UCLA Capital Programs California S&L 7/03/2025 7/18/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP26A - Electrical, low Voltage, Fire Alarm) PQ RESOLICIT UCLA Capital Programs California S&L 7/03/2025 7/18/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP32D - Site Concrete, Asphalt, Striping) PQ RESOLICIT UCLA Capital Programs California S&L 7/03/2025 7/18/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP21A - Fire Protection) PQ RESOLICIT UCLA Capital Programs California S&L 7/03/2025 7/18/2025
Housing Maintenance Roofing JOC 2025 UCLA Capital Programs California S&L 7/01/2025 7/15/2025
MP200 Suite 145 Blood Draw Expansion UCLA Capital Programs California S&L 7/01/2025 8/12/2025
UCLA MP200 Suite 145 Blood Draw Expansion UCLA Capital Programs California S&L 7/01/2025 8/12/2025
UCLA Decarbonization Implementation Projects Study UCLA Capital Programs California S&L 6/26/2025 7/24/2025
UCLA Skidata Pay Machines Installation (RE-SOLICIT) UCLA Capital Programs California S&L 6/26/2025 7/08/2025
Gayley Towers Redevelopment (BP05 - Site Concrete) RE-BID UCLA Capital Programs California S&L 6/20/2025 7/18/2025
BRI 78-109 Lab Renovation UCLA Capital Programs California S&L 6/18/2025 7/22/2025
UCLA BRI 78-109 Lab Renovation UCLA Capital Programs California S&L 6/18/2025 7/22/2025
UCLA Skidata Pay Machines Installation (RE-SOLICIT) UCLA Capital Programs California S&L 6/11/2025 7/01/2025
Skidata Pay Machines Installation Addendum 3 UCLA Capital Programs California S&L 6/11/2025 7/01/2025
RFQ-UCLA Delta Terrace Mailroom to Dorm Conversion UCLA Capital Programs California S&L 6/10/2025 7/08/2025
UCLA CHS Servery Cafeteria Renovation UCLA Capital Programs California S&L 6/10/2025 7/15/2025
CHS SERVERY CAFETERIA RENOVATION UCLA Capital Programs California S&L 6/10/2025 7/15/2025
UCLA Housing Maintenance Roofing JOC 2025 UCLA Capital Programs California S&L 6/04/2025 7/15/2025
Sunset Canyon Replacement Building (BP18-Misc. Specialties & Signage) Re-Bid UCLA Capital Programs California S&L 6/04/2025 6/17/2025
Sunset Canyon Replacement Building (BP07-Foodservice Equipment) Re-Bid UCLA Capital Programs California S&L 6/04/2025 6/17/2025
UCLA 26585 Agoura Rd Room 210-12 PET/CT Equipment Installation UCLA Capital Programs California S&L 5/30/2025 6/05/2025
UCLA School of Dentistry A0-121 & A2-122 Remodel UCLA Capital Programs California S&L 5/22/2025 6/10/2025
Young Research Library A1300 Instructional Room Addendum 3 UCLA Capital Programs California S&L 5/22/2025 5/29/2025
School of Dentistry A0-121 & A2-122 Remodel UCLA Capital Programs California S&L 5/22/2025 6/10/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP32D - Site Concrete, Asphalt, Striping) PREQUALIFICATION Addendum 01 UCLA Capital Programs California S&L 5/21/2025 6/06/2025
Skidata Pay Machines Installation UCLA Capital Programs California S&L 5/19/2025 6/17/2025
UCLA Skidata Pay Machines Installation UCLA Capital Programs California S&L 5/19/2025 6/17/2025
UCLA Young Research Library A1300 Instructional Room UCLA Capital Programs California S&L 5/19/2025 5/27/2025
26585 Agoura Rd Room 210-12 PET/CT Equipment Installation UCLA Capital Programs California S&L 5/19/2025 6/03/2025
26585 Agoura Rd Room 210-12 PET/CT Equipment Installation UCLA Capital Programs California S&L 5/15/2025 6/03/2025
UCLA Mid-Wilshire Medical Office Building Seismic Improv. (BP09A-Framing&Drywall) PREQUALIFICATION UCLA Capital Programs California S&L 5/14/2025 5/28/2025
UCLA Mid-Wilshire Medical Office Building Seismic Improvements (BP03A - Concrete) PREQUALIFICATION UCLA Capital Programs California S&L 5/14/2025 5/28/2025
UCLA Spaulding Field Renovation UCLA Capital Programs California S&L 5/14/2025 6/10/2025
Spaulding Field Renovation UCLA Capital Programs California S&L 5/14/2025 6/10/2025
UCLA Mid-Wilshire Medical Office Building Seismic Improvements (BP02A - Demolition) PREQUALIFICATION UCLA Capital Programs California S&L 5/14/2025 5/28/2025
RRUMC Room B181 Blast Chiller Equipment Replacement Addendum 1 UCLA Capital Programs California S&L 5/13/2025 5/14/2025
UCLA Young Research Library A1300 Instructional Room UCLA Capital Programs California S&L 5/12/2025 5/20/2025
Young Research Library A1300 Instructional Room UCLA Capital Programs California S&L 5/08/2025 5/13/2025
Mid-Wilshire Medical Office Building Seismic Improvements - Phase 2B (BP03A - Concrete) PREQUALIFICATION UCLA Capital Programs California S&L 5/07/2025 5/21/2025
UCLA Mid-Wilshire Medical Office Building Seismic Improv. (BP09A-Framing&Drywall) PREQUALIFICATION UCLA Capital Programs California S&L 5/07/2025 5/21/2025
Mid-Wilshire Medical Office Building Seismic Improvements - Phase 2B (BP09A - Framing and Drywall) PREQUALIFICATION UCLA Capital Programs California S&L 5/07/2025 5/21/2025
Mid-Wilshire Medical Office Building Seismic Improvements - Phase 2B (BP02A - Demolition) PREQUALIFICATION UCLA Capital Programs California S&L 5/07/2025 5/21/2025
UCLA Mid-Wilshire Medical Office Building Seismic Improvements (BP03A - Concrete) PREQUALIFICATION UCLA Capital Programs California S&L 5/07/2025 5/21/2025
UCLA Mid-Wilshire Medical Office Building Seismic Improvements (BP02A - Demolition) PREQUALIFICATION UCLA Capital Programs California S&L 5/07/2025 5/21/2025
RFQ - UCLA Various Capital Improvement Research Laboratories Projects UCLA Capital Programs California S&L 5/05/2025 5/27/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP32C - Landscaping) PREQUALIFICATION Addendum 2 UCLA Capital Programs California S&L 5/01/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP32D - Site Concrete) PREQUALIFICATION UCLA Capital Programs California S&L 5/01/2025 5/30/2025
UCLA 26585 Agoura Rd Room 210-12 PET/CT Equipment Installation UCLA Capital Programs California S&L 4/30/2025 6/03/2025
26585 Agoura Rd Room 210-12 PET/CT Equipment Installation UCLA Capital Programs California S&L 4/30/2025 6/03/2025
RFQ- UCLA Non-Project Specific Building Information Modeling Consultant UCLA Capital Programs California S&L 4/28/2025 5/19/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP05A - Steel) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP08B - Glazing) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP09C - Acoustical Ceiling) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP10C - Smoke Curtain) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP32A - Asphalt and Striping) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
UCLA RRUMC Room B181 Blast Chiller Equipment Replacement UCLA Capital Programs California S&L 4/22/2025 5/14/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP06A - Architectural Woodwork) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP09D - Flooring) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP21A - Fire Protection) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP32B - Fencing) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
MP200 Room B265-41 LINAC Equipment Replacement Addendum 2 UCLA Capital Programs California S&L 4/22/2025 4/24/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP07A - Waterproofing & Roofing) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP09E - Painting) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP22A - Plumbing & Fixtures) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP26A - Electrical) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP32C - Landscaping) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
RRUMC Room B181 Blast Chiller Equipment Replacement UCLA Capital Programs California S&L 4/22/2025 5/14/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP07B - Fireproofing) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP10A - Specialties) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP23A - HVAC) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP27A - Low Voltage) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP33A - Site Utilities) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP03B - Reinforcing Steel) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP08A - Doors, Frames, and Hardware) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP10B - Signage) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP31A - Excavation & Fill) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP09B - Tiling) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
Mid-Wilshire MOB Seismic and Program Improvements - Phase 2B (BP28A - Fire Alarm) PREQUALIFICATION UCLA Capital Programs California S&L 4/22/2025 5/30/2025
UCLA MP200 Room B265-41 LINAC Equipment Replacement UCLA Capital Programs California S&L 4/18/2025 4/24/2025
MP200 Room B265-41 LINAC Equipment Replacement Addendum 2 UCLA Capital Programs California S&L 4/18/2025 4/24/2025
UCLA UWVMC Dishwasher Replacement UCLA Capital Programs California S&L 4/17/2025 5/13/2025
UWVMC Dishwasher Replacement UCLA Capital Programs California S&L 4/17/2025 5/13/2025
Young Research Library A1300 Instructional Room UCLA Capital Programs California S&L 4/16/2025 5/13/2025
RFQ-UCLA Non-Project Specific Cost Estimating UCLA Capital Programs California S&L 4/16/2025 5/07/2025
Sunset Canyon Replacement Building (BP14-Drywall, Metal Stud Framing, Exterior Finishes and Acoustical Ceiling Systems) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP04-Structural/Site Concrete & Masonry) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP12-Structural Steel & Misc. Metals) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP17-Painting) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
RRUMC 4th Floor Patient Care Reconfiguration (BP25 - Electrical) PREQUALIFICATION UCLA Capital Programs California S&L 4/10/2025 4/16/2025
Sunset Canyon Replacement Building (BP06-Glass & Glazing) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP13-Millwork and Finish Carpentry) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP18-Misc. Specialties & Signage) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP09-Fire Sprinkler System) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP15-Doors, Frames and Hardware) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP19-Window Treatment) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP10-Plumbing, HVAC and Wet Utilities) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP16-Flooring) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP07-Foodservice Equipment) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP05-Waterproofing, Roofing & Sheet Metal) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP11-Electrical, Dry Utilities, Lighting, & Fire Alarm) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP20-Landscaping & Irrigation) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
Sunset Canyon Replacement Building (BP08-Elevator) UCLA Capital Programs California S&L 4/10/2025 5/16/2025
University Club Capital Improvements (PREQUALIFICATION) UCLA Capital Programs California S&L 4/04/2025 4/17/2025
UCLA University Club Capital Improvements UCLA Capital Programs California S&L 4/04/2025 4/17/2025
UCLA Young Research Library A1300 Instructional Room UCLA Capital Programs California S&L 4/04/2025 5/13/2025
UCLA Health Facilities JOC 2025-2028 Addendum 1 UCLA Capital Programs California S&L 4/04/2025 4/15/2025
Young Research Library A1300 Instructional Room UCLA Capital Programs California S&L 4/04/2025 5/13/2025
MP200 Emergency Power Equipment Replacement Addendum 1 UCLA Capital Programs California S&L 4/04/2025 4/08/2025
RRUMC 4th Floor Patient Care Reconfiguration (BP11 - Metal Stud/ Drywall) PREQUALIFICATION UCLA Capital Programs California S&L 4/01/2025 4/16/2025
RRUMC 4th Floor Patient Care Reconfiguration (BP25 - Electrical) PREQUALIFICATION UCLA Capital Programs California S&L 4/01/2025 4/16/2025
RRUMC 4th Floor Patient Care Reconfiguration (BP23 - Plumbing) PREQUALIFICATION UCLA Capital Programs California S&L 4/01/2025 4/16/2025
RRUMC 4th Floor Patient Care Reconfiguration (BP24 - HVAC) PREQUALIFICATION UCLA Capital Programs California S&L 4/01/2025 4/16/2025
Rieber Vista Finish Refurbishment UCLA Capital Programs California S&L 4/01/2025 4/15/2025
UCLA MP200 2nd Floor Oncology Improvements - Make Ready UCLA Capital Programs California S&L 3/31/2025 4/08/2025
MP200 Emergency Power Equipment Replacement Addendum 1 UCLA Capital Programs California S&L 3/25/2025 4/08/2025
RFQ-UCLA Non-Project Accessibility Consultant Services UCLA Capital Programs California S&L 3/22/2025 4/14/2025
Mid-Wilshire Medical Office Building Seismic and Program Improvements ( BP23A - HVAC) UCLA Capital Programs California S&L 3/20/2025 3/21/2025
RFQ-UCLA 143 Triunfo Canyon Tenant Improvements UCLA Capital Programs California S&L 3/18/2025 4/09/2025
Housing Maintenance General Construction JOC 2024 Interior UCLA Capital Programs California S&L 3/18/2025 4/01/2025
MP200 Room B265-41 LINAC Equipment Replacement UCLA Capital Programs California S&L 3/17/2025 4/22/2025
UCLA MP200 Room B265-41 LINAC Equipment Replacement UCLA Capital Programs California S&L 3/17/2025 4/22/2025
UCLA Rieber Vista Finish Refurbishment UCLA Capital Programs California S&L 3/14/2025 4/15/2025
MP200 2nd Floor Oncology Improvements - Make Ready UCLA Capital Programs California S&L 3/14/2025 4/01/2025
Rieber Vista Finish Refurbishment UCLA Capital Programs California S&L 3/14/2025 4/15/2025
MP200 2nd Floor Oncology Improvements - Make Ready UCLA Capital Programs California S&L 3/13/2025 4/01/2025
MP200 Emergency Power Equipment Replacement Addendum 1 UCLA Capital Programs California S&L 3/13/2025 4/08/2025
UCLA MP200 2nd Floor Oncology Improvements - Make Ready UCLA Capital Programs California S&L 3/13/2025 4/01/2025
UCLA MP200 Emergency Power Equipment Replacement (PREQUALIFICATION) UCLA Capital Programs California S&L 3/13/2025 4/08/2025
UCLA Health Facilities JOC 2025-2028 UCLA Capital Programs California S&L 3/11/2025 4/15/2025
UCLA Downtown 11th Floor Roof Deck Upgrade Addendum 3.2 UCLA Capital Programs California S&L 3/11/2025 3/25/2025
UCLA Health Facilities JOC 2025-2028 UCLA Capital Programs California S&L 3/11/2025 4/15/2025
UCLA MP200 2nd Floor Oncology Improvements UCLA Capital Programs California S&L 3/11/2025 4/08/2025
MP200 2nd Floor Oncology Improvements UCLA Capital Programs California S&L 3/11/2025 4/08/2025
UCLA Downtown 11th Floor Roof Deck Upgrade Addendum 3.2 UCLA Capital Programs California S&L 3/10/2025 3/25/2025
Gayley Towers Redevelopment (BP27 - Elevators) RE-BID UCLA Capital Programs California S&L 3/07/2025 3/18/2025
RFQ-UCLA Non-Project Specific Environmental Hazardous Materials UCLA Capital Programs California S&L 3/07/2025 3/31/2025
Sunset Canyon Replacement Building (BP04-Structural Concrete, Site Concrete, Rebar and Masonry) PREQUALIFICATION UCLA Capital Programs California S&L 2/28/2025 3/13/2025
RRUMC 4th Floor Patient Care Reconfiguration (BP22 - Fire Protection) PREQUALIFICATION UCLA Capital Programs California S&L 2/28/2025 3/12/2025
UCLA MP200 Emergency Power Equipment Replacement (PREQUALIFICATION) UCLA Capital Programs California S&L 2/26/2025 3/25/2025
5210 Pacific Concourse Dr. Tenant Improvements UCLA Capital Programs California S&L 2/26/2025 3/04/2025
MP200 Emergency Power Equipment Replacement UCLA Capital Programs California S&L 2/26/2025 3/25/2025
RRUMC 4th Floor Patient Care Reconfiguration (BP22 - Fire Protection) PREQUALIFICATION UCLA Capital Programs California S&L 2/26/2025 3/12/2025
SMUMC Isolation Room Pressure Monitor Upgrade UCLA Capital Programs California S&L 2/25/2025 3/25/2025
Gayley Towers Redevelopment (BP17 - Ceramic Tile, Stone & Marble) RE-BID UCLA Capital Programs California S&L 2/25/2025 3/18/2025
UCLA SMUMC Isolation Room Pressure Monitor Upgrade UCLA Capital Programs California S&L 2/25/2025 3/25/2025
Gayley Towers Redevelopment (BP27 - Elevators) RE-BID UCLA Capital Programs California S&L 2/25/2025 3/18/2025
RFQ - Ronald Reagan UCLA Medical Center Pharmacy Master Plan Study UCLA Capital Programs California S&L 2/24/2025 3/11/2025
DGSOM HVAC Unit Price Job Order - Facilities Management 2025 Addendum 2 UCLA Capital Programs California S&L 2/21/2025 3/11/2025
Housing Maintenance General Construction JOC 2024 Interior UCLA Capital Programs California S&L 2/21/2025 4/01/2025
UCLA Housing Maintenance General Construction JOC 2024 Interior UCLA Capital Programs California S&L 2/21/2025 4/01/2025
UCLA Downtown 11th Floor Roof Deck Upgrade UCLA Capital Programs California S&L 2/18/2025 2/25/2025
Campus HVAC Unit Price Job Order - Facilities Management 2025 Addendum 2 UCLA Capital Programs California S&L 2/13/2025 3/11/2025
DGSOM HVAC Unit Price Job Order - Facilities Management 2025 Addendum 2 UCLA Capital Programs California S&L 2/13/2025 3/11/2025
UCLA 5210 Pacific Concourse Dr. Tenant Improvements (PREQUALIFICATION) UCLA Capital Programs California S&L 2/07/2025 3/04/2025
UCLA Downtown 11th Floor Roof Deck Upgrade Addendum 3 UCLA Capital Programs California S&L 2/07/2025 2/25/2025
5210 Pacific Concourse Dr. Tenant Improvements UCLA Capital Programs California S&L 2/07/2025 3/04/2025
De Neve Evergreen and Fir Finish Refurbishment UCLA Capital Programs California S&L 2/06/2025 2/18/2025
Campus HVAC Unit Price Job Order - Facilities Management 2025 UCLA Capital Programs California S&L 2/06/2025 3/11/2025
DGSOM HVAC Unit Price Job Order - Facilities Management 2025 UCLA Capital Programs California S&L 2/06/2025 3/11/2025
UCLA DGSOM HVAC Unit Price Job Order - Facilities Management 2025 UCLA Capital Programs California S&L 2/06/2025 3/11/2025
UCLA Campus HVAC Unit Price Job Order - Facilities Management 2025 UCLA Capital Programs California S&L 2/06/2025 3/11/2025
Northwest Auditorium HVAC Replacement UCLA Capital Programs California S&L 2/05/2025 2/25/2025
RFQ-UCLA Doris Stein Eye Research Center Seismic and Program Improvement Study UCLA Capital Programs California S&L 2/04/2025 2/25/2025
Gayley Towers Redevelopment (BP05 - Site Concrete, Asphalt Paving & Striping) RE-BID UCLA Capital Programs California S&L 2/03/2025 3/03/2025
Gayley Towers Redevelopment (BP06 - Landscape & Irrigation, Site Furnishings) RE-BID UCLA Capital Programs California S&L 2/03/2025 3/03/2025
Gayley Towers Redevelopment (BP10 - Finish Carpentry) RE-BID UCLA Capital Programs California S&L 2/03/2025 3/03/2025
Gayley Towers Redevelopment (BP29 - Final Clean) RE-BID UCLA Capital Programs California S&L 2/03/2025 3/03/2025
UCLA Northwest Auditorium HVAC Replacement UCLA Capital Programs California S&L 1/29/2025 3/04/2025
UCLA Sproul Cove and Landing Finish Refurbishment UCLA Capital Programs California S&L 1/28/2025 3/04/2025
Southwest Campus Apartments Post-Occupancy - Fire Lane Alterations UCLA Capital Programs California S&L 1/28/2025 2/04/2025
Housing Maintenance General Engineering, Hardscape & Utilities JOC 2024 UCLA Capital Programs California S&L 1/28/2025 2/04/2025
Sproul Cove and Landing Finish Refurbishment UCLA Capital Programs California S&L 1/28/2025 3/04/2025
UCLA PS-18 Structural Repair UCLA Capital Programs California S&L 1/24/2025 1/30/2025
UCLA Downtown 11th Floor Roof Deck Upgrade UCLA Capital Programs California S&L 1/24/2025 2/11/2025
UCLA Downtown 11th Floor Roof Deck Upgrade Addendum 1 UCLA Capital Programs California S&L 1/23/2025 1/28/2025
UCLA Southwest Campus Apartments Post-Occupancy - Fire Lane Alterations (RE-BID) UCLA Capital Programs California S&L 1/23/2025 2/04/2025
UCLA Northwest Auditorium HVAC Replacement UCLA Capital Programs California S&L 1/21/2025 2/25/2025
UCLA Housing Maintenance General Construction JOC 2024 - Exterior (Re-Bid) UCLA Capital Programs California S&L 1/21/2025 2/18/2025